Loading...
Report CTI PROJECT NUMBER T1001960 NUCLEAR COMPACTION TEST REPORT FOR BASE AGGREGATE E 'English (E) or Metric (M) PROJECT NAME (SECTION) CONTRACT NUMBER'� Sonic Drive -In #6206 - New Construction ( SIT201 CONTRACTOR OR SUPPLIER PROJECT MANAGER ` BIG- ITEELNLJMBER Mcobean Construction LLC N/A N/A CONTROL STRIP NO PANEL WIDTH LIFT THICKNESS TYPE GAUGE - SERIAL NUMBER MIX NOMINAL SIZE 4' 6" Troxler 3440 -37192 3/4" ROLLER TYPE AND DESCRIPTION ( MANUFACTURE. WEIGHT, ETC) TEST NUMBER 1 2 . 3 DATE OF TEST 5/17/2010 5/17/2010 5/17/2010 TEST LOCATION (STATION) 186 +80 186 +40 185 +90 DISTANCE LT. OR RT. 1.5'E OF 1.5'E OF 1.5'E OF OF CENTERLINE (FEET) ASPHALT ASPHALT ASPHALT SOURCE POSITION 4" 4" 4" DIST BELOW LIFT GRADE -6" -6" -6" WET DENSITY Ib /ft 1D 135.3 134.6 135.8 MAX DIFFERENCE 2 lb/ft' 2D 135.5 134.8 135.4 MOISTURE Ib /ft 1M 8.1 7.2 8.0 2M 8.4 7.4 8.3 AVE. WET DENSITY Ib /ft AD 135.4 134.7 135.6 • AVE. MOISTURE Ib /ft AM 8.3 7.3 8.2 DRY DENSITY(AD - AM) I b /ft DD 127.1 127.4 127.4 % MOISTURE (AM / DD) x100 %M 6.5% 5.7% 6.4% Curve # - Source # Tigard S & G Tigard S & G Tigard S & G RELATIVE MAXIMUM DRY DENSITY RD 127.0 127.0 127.0 Combined Optimum Moisture 11,0% 11.0% 11.0% COMPACTION FOR INDIVIDUAL 90 % TESTS (DD /RD)X100 REQ 100% 100% 100% Check Appropriate I I Material deflected under loaded equipment LI Material did not deflect under loaded equipment REPRESENTS MATERIAL FROM STATION 187 +00 TO STATION 185 +50 INCORPORATED FROM OFFSET TO OFFSET REMARKS Test results left with Paul Lamberson. X (QUALITY CONTROL I (VERIFICATION CERTIFIED TECHNICIAN (PLEASE PRINT) AND CARD NUMBER COMPANY NAME ,,.SIGNATURE DATE Torin Emerson #44371 Carlson Testing, Inc. 7- 5/17/2010 CC: MWF Tigard LLC - Jess Wetzel jess@wetsel.net City of Tigard Building Division Mackay & Sposito Inc (Wilsonville) - Patrick Carroll pcarroll@mackaysposito.com Carlson ,Veit Architects - Fred Harris fharris@carlsonveit.com Mcobean Construction LLC - Mike Cobean mcobean@gmail.com cn 734- 1793_B (10 -2006) CTI PROJECT NUMBER T1001960 NUCLEAR COMPACTION TEST REPORT FOR BASE AGGREGATE E'English (E) or Metric (M) PROJECT NAME (SECTION) CONTRACT NUMBER Sonic Drive -In #6206 - New Construction SIT2010 -2 CONTRACTOR OR SUPPLIER PROJECT MANAGER BID ITEM NUMBER Mcobean Construction LLC N/A N/A CONTROL STRIP NO. PANEL WIDTH LIFT THICKNESS TYPE GAUGE - SERIAL NUMBER MIX NOMINAL SIZE 4' 6" Troxler 3440 -37192 3/4" ROLLER TYPE AND DESCRIPTION ( MANUFACTURE, WEIGHT, ETC) TEST NUMBER 1 2 3 DATE OF TEST 5/18/2010 5/18/2010 5/18/2010 TEST LOCATION (STATION) 185 +85 186 +35 186 +65 DISTANCE LT. OR RT. OF CENTERLINE (FEET) CENTER CENTER CENTER SOURCE POSITION 4" 4" 4" DIST BELOW LIFT GRADE TOP TOP TOP WET DENSITY Ib /ft 1D 140.0 139.9 140.4 MAX DIFFERENCE 2 lb/ft' 2D 139.8 139.7 140.1 MOISTURE Ib /ft 1M 12.4 12.3 12.5 2M 12.4 12.4 12.5 AVE. WET DENSITY Ib /ft AD 139.9 139.8 140.3 AVE. MOISTURE Ib /ft AM 12.4 12.4 12.5 DRY DENSITY(AD Ib /ft DD 127.5 127.4 127.8 % MOISTURE (AM /DD)x %M 9.7% 9.7% 9.8% Curve # - Source # Tigard S & G Tigard_S_ &_G. -- Tigard S & G RELATIVE MAXIMUM DRY DENSITY RD 127.0 127.0 127.0 Combined Optimum Moisture 11.0% 11.0% 11.0% COMPACTION FOR INDIVIDUAL 90 TESTS (DD / RD) X 100 REQ 100% 100% 101% Check Appropriate I I Material deflected under loaded equipment I I Material did not deflect under loaded equipment REPRESENTS MATERIAL FROM STATION 185 +50 TO STATION 187 +00 INCORPORATED FROM OFFSET TRENCH TO OFFSET TRENCH REMARKS Test results left with Paul Lamberson. 7 QUALITY CONTROL IIVERIFICATION CERTIFIED TECHNICIAN (PLEASE PRINT) AND CARD NUMBER COMPANY NAME NAT DATE Torin Emerson #44371 Carlson Testing. `? -�''�` g, ; 5/18/2010 CC: MWF Tigard LLC - Jess Wetzel jess@wetsel.net City of Tigard Building Division Mackay & Sposito Inc (Wilsonville) - Patrick Carroll pcarroll @mackaysposito.com Carlson/Veit Architects - Fred Harris fharri s @carl sonvei t. com Mcobean Construction LLC - Mike Cobean mcobean@gmail.com cn 734- 1793_B (10 -2006) Bend Office (541) 330 -9155 yy� e Inc. Geotechnical Office (503) 601 -8250 Carlson Testing, Eugene Office (541) 345-0289 Salem Office (503) 58 589 -1252 Tigard Office (503) 684 -3460 REPORT OF 4 X 8 CONCRETE TEST SPECIMENS Test Methods: ASTM C31/ C172 /C192/C39/C1064/C231/C143/C1231 Date Molded: 04/19/2010 Date Received: 04/20/2010 Job Number: T1001960. Permit #: SIT2010 -00002 Client: MWF TIGARD LLC - JESS WETZEL Project: SONIC DRIVE -IN #6206 - NEW CONSTRUCTION Address: 15336 SW HIGHWAY 99 TIGARD OR Jurisdiction: TIGARD Contractor: MCOBEAN CONSTRUCTION LLC - MIKE COBEAN Subcontractor: DAN THOMAS CONSTRUCTION C B R. GOUTHRO Concrete Supplier: WILSONVILLE CONCRETE PRODUCTS Truck #: 68 Load #: 1 Ticket #: W148705 Weather: OVERCAST Test Time: 12:45 Air Temp. at Sampling Time: 62 Cylinders were cast for the following locations: CASSIONS ON NORTH CANOPIES Total Concrete Placement Location: NORTH & SOUTH CANOPIES AND DRIVE -THRU CANOPIES (CASSIONS) Strength Requirement: 3000 psi f c@ 28 Days Slump: 6.000" % Air: 1. 0 0 % Mix Number: 206009 Conc. Temp: 70 Cement Type: I/ 11 Max Agg: 3 / 8 Admix/Amt: Cubic Yards: 10.5 OF 20 Register Number: 0094733 Lab Location: TIGARD Set Test @ Test Total Avg. Area Unit Type Of Cap Tested No. Days Date Load Diameter PSI Fracture Type By I 7 04/26/2010 24942 4.02 12.69 1970 3 PAD 60 JT 28 05/17/2010 46715 4.01 12.62 3700 2 PAD 60 BAH 28 05/17/2010 45030 4.01 12.62 3570 3 PAD 60 BAH 28 05/17/2010 47960 4.01 12.62 3800 3 PAD 60 BAH E Distribute attachments. Average f c@ 28 days 3690 Please see reverse side for additional information. Job Number: T1001960. Re Number: 0094733 Date Molded: 04/19/2010 Project: SONIC DRIVE -IN #6206 - NEW CONSTRUCTION < 1 in. [25 mm] \ f �� � ? � ■ 2\ / / ' ."I.. -, f Type l Type 2 Type 3 Reasonable well- formed Well- Formed cone on one Columnar vertical cracking cones on both ends, less end, vertical cracks running through both ends, no than 1 in. [25 rnm] of through caps, no well - defined well - formed cones cracking through caps cone on other end ti ti 7 Type 4 Type 5 Type 6 Diagonal fracture with Side fractures at top or Similar to Type 5 but no cracking through bottom (occur commonly .,nd of cylinder is pointed ends; tap with hammer to with unbonded caps) distinguish from Type 1 Asterisked ( *) average unit PSI test results did not meet listed acceptance criteria. Remarks: MWF TIGARD LLC - JESS WETZEL JESS @WETSEL.NET TO: CITY OF TIGARD BUILDING DIVISION MACKAY & SPOSITO INC (WILSONVILLE) - PATRICK CARROLL PCARROLL @MACKAYSPOSITO.COM CARLSON /VEIT ARCHITECTS - FRED HARRIS FHARRIS @CARLSONVEIT.COM MCOBEAN CONSTRUCTION LLC - MIKE COBEAN MCOBEAN @GMAIL.COM Project Manager: G. LEEPER Reviewed By: Ty Toller On 05/19/2010 Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. Bend Office (541) 330 -9155 Geotechnical Office (503) 601 -8250 s1� • Eugene Office (541) 345 -0289 Carlson Testing Inc. Salem Office (503) 589 -1252 Tigard Office (503) 684 -3460 Daily Report of Proprietary Anchors Client: MWF TIGARD LLC - JESS WETZEL Project: SONIC DRIVE -IN #6206 - NEW CONSTRUCTION CTI Job #: T1001960. Address: 15336 SW HIGHWAY 99 TIGARD OR Jurisdiction: TIGARD CTI representative S. HOPPE OBOA 791 was on site this date Apr. 27, 2 010 to perform Special Inspection for: Permit SIT2010-00002 DFS #(s) PO Number: SCOPE OF INSPECTION Location of proprietary anchors inspected [to include grid lines, elevations (floors) and drawing details]: 1. Checked in with superintendent or client representative. HOLDDOWN THREADED ROD, 5/8" EMBEDED 10 1/2 MIN Name: PAUL INTO UNKNOWN PSI CONCRETE AT REAR DOOR TO Company: MCOBEAN CONSTRUCTION BUILDING. 2. Inspection was "IBC" ® Continuous n Periodic PROPRIETARY ANCHORS Yes No N/A 1. Reviewed previous inspection reports? 2. Reviewed evaluation report? x - Verified following items meet manufacturer's REPORT SIJIVIM ARY published installation instructions. 3. Verified minimum embedment depth of the 1. Work inspected was: ® Completed 0 In progress anchors. x 4.Verified installation of the anchors. 2. Completed work inspected was in compliance with x ® Approved plans and specifications fl Shop drawings 5. Verified anchor diameter. x 6. Verified steel grade. x RFI Design change n Submittal ❑ N/A 7. Verified hole diameter. y Document #(s) Dated: 8. Verified type of drill bit used. x 9. Verified hole cleaning method. 3. Noncompliance item(s) were noted this date, details on x following page(s). C Yes ❑ No E N/A 10. Verified adhesive application. x 11. Verified edge distance. x 4. Noncompliance item(s) were reinspected this date, details 12. Verified spacing. x on following page(s). n Yes 0 No ri N/A 13. Verified installation torque. x ❑ Conform D Remain in progress Evaluation report number & date: Report(s) findings were discussed and left with ESR 2508 (08/01/08) PAUL of MCOBEAN Name of product being installed SIMPSON XP Batch Number 281X248X Expiration Date 1 1/30/11 Based on the Code, approval is required from the Building Official before the SPECIAL INSPECTED items noted above can be covered. Carlson Testing has no authority to direct work of contractors or subcontractors. See additional report page(s). Distribute attachments. Page 1 of Daily Report of Proprietary Anchors For: 04/27/2010 CTI Job #: T1001960 . Project: SONIC DRIVE -IN #6206 - NEW CONSTRUCTION Notes: • In some cases more than one box may be checked for a given item on the front page. Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in fi without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, LNC. Reviewed By: Greg Leeper Review Date: 05/17/2010 SH /CK MWF TIGARD LLC - JESS WETZEL JESS @WETSEL.NET TO: CITY OF TIGARD BUILDING DIVISION MACKAY & SPOSITO INC (WILSONVILLE) - PATRICK CARROLL PCARROLL @MACKAYSPOSITO.COM CARLSON /VEIT ARCHITECTS - FRED HARRIS FHARRIS@CARLSONVEIT.COM MCOBEAN CONSTRUCTION LLC - MIKE COBEAN MCOBEAN @GMAIL.COM CTI PROJECT NUMBER T1001960 NUCLEAR COMPACTION TEST REPORT FOR BASE AGGREGATE E !English (E) or Metric (M) PROJECT NAME (SECTION) CONTRACT NUMBER Sonic Drive -In #6206 - New Construction SIT2010 -2 CONTRACTOR OR SUPPLIER PROJECT MANAGER BID ITEM NUMBER MWF Tigard LLC N/A N/A CONTROL STRIP NO. PANEL WIDTH LIFT THICKNESS TYPE GAUGE- SERIAL NUMBER MIX NOMINAL SIZE N/A 3' -4' Varies Troxler 3440 -37192 3/4 " -0 ROLLER TYPE AND DESCRIPTION ( MANUFACTURE, WEIGHT, ETC) Hoe -Pack TEST NUMBER 1 2 3 4 DATE OF TEST 4/27/2010 4/27/2010 4/27/2010 4/27/2010 TEST LOCATION (STATION) See remarks See remarks See remarks See remarks DISTANCE LT. OR RT. OF CENTERLINE (FEET) N/A N/A N/A N/A SOURCE POSITION 8" 8" 8" 8" DIST BELOW LIFT GRADE N/A / SG N/A / SG N/A / SG N/A / SG WET DENSITY Ib /ft 1D 132.7 132.0 135.8 125.7 MAX DIFFERENCE 21b /ft' • 2D 132.6 131.9 135.7 125.7 MOISTURE Ib /ft 1M 8.3 7.4 8.4 8.3 2M 8.3 7.4 8.4 8.3 AVE. WET DENSITY Ib /ft AD 132.7 132 135.8 125.7 AVE. MOISTURE Ib /ft AM 8.3 7.4 8.4 8.3 DRY DENSITY (AD -AM) I b /ft DD 124.4 124.6 127.4 117.4 % MOISTURE (Am /DD)x100 %M 6.7% 5.9% 6.6% 7.1% Curve # - Source # Tigard S & G Tigard S & G ' Tigard S & G Tigard S & G RELATIVE MAXIMUM DRY DENSITY RD 127.0 127.0 127.0 127.0 Combined Optimum Moisture 11.0% 11.0% 11.0% 11.0% % COMPACTION FOR INDIVIDUAL 90 TESTS (DD / RD) X 100 REQ 98% 98% 100% 92% Check Appropriate I I Material deflected under loaded equipment I I Material did not deflect under loaded equipment REPRESENTS MATERIAL FROM STATION See remarks TO STATION See remarks INCORPORATED ' FROM OFFSET See remarks TO OFFSET See remarks REMARKS No deflection testing performed due to Area Incorporated. Test #1, 60' south of sanitary manhole #1 center of trench. Test #2, 13' north of sanitary manhole #2 center of trench. Test #3, 12' east of sanitary manhole #3 center of trench. Test #4, 2' SW of manhole #3 stormwater center of trench. 1 DUALITY CONTROL r (VERIFICATION CERTIFIED TECHNICIAN (PLEASE PRINT) AND CARD NUMBER COMPANY NAME SIGNATURE DATE Adam Rose #44302 Carlson Testing, Inc. .> 4/27/2010 CC: MWF Tigard LLC - Jess Wetzel jess @wetsel.net City of Tigard Building Division Mackay & Sposito Inc (Wilsonville) - Patrick Carroll pcarroll @mackaysposito.com CarlsonNeit Architects - Fred Harris fharris @carlsonveit.com Mcobean Construction LLC - Mike Cobean mcobean@gmail.com 734- 1793_B (10 -2006)