Loading...
Report (48) 9/7 4 O' v e ___-. • Mont Office snlrnn Office Rend Office Testing, Inc. 847U.111'Hunriker 060HurdsaiS HE 630 25 R97 7vRdHll J 134305 OR nz a Solon, OR 97301 Belk ()R V770? Phone: (503) 684 -3460 Phan: 1503) 539 -1252 Phone: C541)330-9135 Fox: (503) 684 -0954 Fnr: (503) 589 -1309 Fax C5411330-9163 Construction Materials Testing & In Special Inspection FINAL SUMMARY LETTER June 3, 2010 CTI Job #T1001960 City of Tigard Building Division 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Department Re: Sonic Drive -In #6206 — New Construction 15336 SW Highway 99 — Tigard, OR Permit: SIT2010 -00002 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete Installation of Cast in Place Anchors Installation of Adhesive Anchors Structural Welding- Field Only All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions in effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, 6 C L ON T TING, INC. • u Greg Deeper Project Manager GL /cn cc: MWF Tigard LLC — Jess Wetzel jess @wetsel . net City of Tigard Building Division Carlson/Veit Architects — Fred Harris fharris@carlsonveit.com Mcobean Construction LLC — Mike Cobean mcobean @ymail.com _- = JUN -04 -2010 FRI 09:46 AM CARLSON TESTING INC, FAX NO, 5036840954 P. 02 ,�r Testing, , ame'Mrmee fiendoinay . !. a.ri on c 9J30 Ell' {!un_l4¢r J06011 SY,NL 03035 Rao hdrl 11 tieng on Y7702 Inc. 11 ■V 7r1'Prd OR 97'2'23 A'uMM, OR 97.701 Pd�rrn, PM 68.1.A+60 Pnunc: (503)SN9 -135' Ilium: (1103304M Construction Mate.ria.is Testing & Inspection r'u: 15u3, a a -nvSJ rmrnom rnu.IJnu r,rs,li,�,eRVlea -- Special Inspection FINAL SUMMARY LETTER June 3, 2010 CTI Job #T1001960 City of Tigard Building Division 13125 SW Hall Blvd Tigard, OR 97223 -8199 Attn: Building Department Re: Sonic Drive -In #6206 — New Construction 15336 SW Highway 99 -- Tigard, OR Permit SIT2010 -00002 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Reinforced Concrete Installation of Cast in Place Anchors Installation of Adhesive Anchors Structural Welding- Field Only All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office, Under all circumstances, the information contained in this report is provided subject to all terms and conditions of CTI's General Conditions In effect at the time this report is prepared. No party other than those to whom CTI has distributed this report shall be entitled to use or rely upon the information contained in this document. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, L 6 ON T TING, INC. W C Greg Leeper Project Manager GLJcn CC: MWF Tigard LLC — Jess Wetzel jessawetsel -net. City of Tigard Building Division CarlsonNeit Architects — Fred Harris fharrisecarlsonvel'c. com Mcobean Construction LLC — Mike Cobean mcobeanPgmai 1. com JUN -04 -2010 FRI 09:46 All CARLSON TESTING INC. FAX N0. 5036840954 P. 01 CARLSON TESTING, INC. Phone: 503- 684 - 3460 /Fax 503 -684 -0954 PO Box 23814 - Tigard, OR 97223 FAX TRANSMITTAL To: City of Tigard Attn: Building Department Fax: 503-624-3681 From: Carlson Testing, Inc. — Christina Nino Date: June 4, 2010 Re: FINAL SUMMARY LETTER Total Pages: 2 C C This is the Final Summary Letter for: Project: Sonic Drive In #6206 — New Construction Permit # SIT2010.00002 Please call if you have any questions. 503-419-4524. Thank Yau, Christina Nino Office Assistant