Loading...
Report (12) 9 fA,Jo'' ( 5� ION s MILLER CONSULTING ENGINEERS FINAL SUMMARY LETTER September 30, 2010 Mr. Andy Miller Andy Miller Contracting 11252 SW 105 P1 Tigard, OR 97223 Subject: Special Inspection /Structural Observation Project Name: Driveway Retaining Wall Project Address: 9495 SW Shady Place, Tigard, OR 97223 Permit No. SIT2010 -00015 MCE File No. 100529 Dear Mr. Miller: Based on our limited site observation, photos from the contractor and review of the testing reports provided by Carlson Testing, to the best of our knowledge the work is completed and is in compliance with the plans and specifications as prepared by this office. The contractor has elected to replace the specified Synteen SF35 geo -grid with Strata Grid SG200 geo -grid. We have concluded that this is an acceptable substitution. Respectfully, � O PROp� Miller Consulting Engineers, Inc. � '� G i N � �� d' �� i4477P S - OR GO;' i Melissa McFer. 1, ' . " , • p Associate ss',ANNE G�� ! EXPIRES: 12 -31- t0 1 9570 SW Barbur Blvd., Suite 100 Portland, Oregon 97219 -5412 Phone (503) 246 -1250 Fax (503) 246 -1395 www.millerengrs.com American Consulting ti t Engineers Council