Loading...
Correspondence Musil Perkowitz Ruth 1� iC (0-01q c An Architectural Professional Corp. Architecture • Planning August 9, 1996 i' i 1 ,, Mr. Jim Funk, Plans Examiner City of Tigard 13125 S.W. Hall Bo - .. Tigard, OR 97 g � p Principals: �o $ 7 a l/` "' M. Lawrence Musil, AIA RE: Borders Shell Simon Perkowitz, AIA, PE • Bingham Development Steven J. Ruth, alA Plan Check NMEC #96 -0199, PC #6 -104c Senior Associates: Brankc Prcbanda MFR Job # 95- 947 -25 Gary Clements Ken Gunther \ Marios Savopoulos Dear- im: Brian Wolfe Ted Yoshizaki In response + our corrections, pleas - : =- attached. I have included a stamped Associates: calculations for atta 1 - - : . • r conditioning unit to the roof structure. All Casanova John Bost , I am sending a mechanical plan showing the location of all the air Jonathan Gray Secondly, g P g Michael Heinrich conditioning units, the indication for labeling and an equipment schedule. David Littman Peter Paszterko Mike Salmon Lastly, the electrical receptacles are being provided under the T.I. contract. I trust this will meet with your approval. If you have any questions, please call me. Sincerely, MUSI PERKOWITZ RUTH • a / Ed Craker EC:dks cc: File Enclosure • 9150 S.W. Pioneer Court CC 6eauee MimelL Suite T Wilsonville, Oregon 97070 (503) 685-7350 FAX (503) 682-3348 Long Beach, CA Newport Beach, CA Sacramento. CA Denver, CO Washington, DC. Wilsonville. OR July 31, 1996 CITY OF TIGARD Temp Control I 4800 N Channel OREGON Portland, OR 97211 RE: Tigard Center "Bldg C" Mechanical Plan Review 16920 SW 72nd Ave PC #: 6-104c MEC #: 96-0199 Submittal documents for the above • referenced project have been reviewed for conformance with the applicable 1996 Oregon Specialty Codes and other applicable codes and standards. The following comments are noted: • � w MIE Cl�'ANIC C '" I_ �??��,, ��, .. T'r4 t GS, W latt 43v {yrP.,�y /} t 1. Submit three (3) sets of mechanical plans for review. A. The attachment of permanent equipment (HVAC) supported by the building's structural components shall be designed to resist the total design seismic forces prescribed in Section 1603.2 of the Structural • Specialty Code. Provide an engineer's design specifying attachment requirements [SSC Section 160.3.2 and OMSC, Section 304.4]. B. Each individual roof - mounted HVAC shall be permanently labeled as to the areas it serves [OMSC, Section 304.5]. In addition, each unit shall be equipped with a power disconnect and a 120 -volt receptacle shall be located within 25' of each unit [UMC, Section 309.1]. 2. The plan shall include an equipment schedule illustrating: A. Size of units, btu's of cooling/heating. B. Unit weight. C. Economizers. Please submit three copies of revised submittal documents and a letter indicating your response to the above comments for review. Please call me at (503) 639 -4171 if you have any questions. Sincerely, , 'Jim Funk PLANS EXAMINER i:lcitywide\pc6- 104c.doc 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 (/