Loading...
Correspondence • INSTEAD AND ASSOCIATES ARCHITECTURE AND BUILDING CODE SERVICES, PC. P.O. Box 2198 Phone: 503- 723 -8003 Oregon City; Oregon 97045 Fax: 503 -723 -8234 Finail codeexpert®nisn.com November 26, 2002 Gary Lampella, Building Official City of Tigard 13125 SW Hall Blvd. Tigard, Oregon 97223 Subject: Winstead & Associates Plan Review. 126.tig ; �' City of Tigard Permit: BUP2002 -00505 (473) Project VARIS_ INDUSTRIES, LLC 16640 SW 72 AVENUE TIGARD OREGON 97223 Dear Gary, The drawings-and related design documents for the proposed work were REVIEWED AND FOUND TO BE IN SUBSTANTIAL COMPLIANCE with the 1999 NFPA 13, Installation of Sprinkler Systems & 1998 Oregon Structural Specialty Code (OSSC). It is important to note the issuance of a permit shall not authorize the violation of any provisions of the OSSC. Permits - presuming to give authority to violate or cancel provisions of the OSSC are not valid. The recommendation for approval and issuance of a permit based on the plans, specifications and related material shall not prevent the building official hereafter from requiring the correction of errors in plans, specifications and related- material or from- preventing the - building from being operated in violation. We recommend approval with conditions. CONDITIONS OF-CLEARANCE 1. Final clearances and permit processing is by the Jurisdiction. 2. A completed and - signed contractors :materiatand - test certificate shall be submitted to this office for permanent filing. NFPA 13 Figure 10 -1(a). 3: Hydrostatic, flushing- andatarmtestsshattbe witnessed by a member of the building department. Please use the phone numbers listed on the building pennit(s) to request the required inspections. Because of the time invdvedrin thy tests :it is-best to request -these tests 24-hours in advance. 4. Only listed sprinklers shall be used and they shall be installed in accordance with their listing. Provide spare heads and ty s of heads -used; 5. Sprinkler systems, induding hangers, piping, and sway bracing shall be designed and detailed for lateralloads due to- earthquakes -in accordance with NR 13-to-minimize or prevent pipe breakage. 6. Prior to final inspection, a section cut of the sprinkler shall be forwarded to the Building Official. DOCUMENTS TRANSMITTED: 1. Four (4) sets of sprinlder plans by Delta Fre, Inc. dated 11/18/02 SENT T YOU VIA: D By: Winstead-A 0 Winstead & Associates, Architecture and Building Code Services, PC.