Correspondence •
INSTEAD AND ASSOCIATES
ARCHITECTURE AND BUILDING CODE SERVICES, PC.
P.O. Box 2198 Phone: 503- 723 -8003
Oregon City; Oregon 97045 Fax: 503 -723 -8234
Finail
codeexpert®nisn.com
November 26, 2002
Gary Lampella, Building Official
City of Tigard
13125 SW Hall Blvd.
Tigard, Oregon 97223
Subject: Winstead & Associates Plan Review. 126.tig ; �'
City of Tigard Permit: BUP2002 -00505 (473)
Project VARIS_ INDUSTRIES, LLC
16640 SW 72 AVENUE
TIGARD OREGON 97223
Dear Gary,
The drawings-and related design documents for the proposed work were REVIEWED
AND FOUND TO BE IN SUBSTANTIAL COMPLIANCE with the 1999 NFPA 13,
Installation of Sprinkler Systems & 1998 Oregon Structural Specialty Code (OSSC). It is
important to note the issuance of a permit shall not authorize the violation of any
provisions of the OSSC. Permits - presuming to give authority to violate or cancel
provisions of the OSSC are not valid. The recommendation for approval and issuance of
a permit based on the plans, specifications and related material shall not prevent the
building official hereafter from requiring the correction of errors in plans, specifications
and related- material or from- preventing the - building from being operated in violation. We
recommend approval with conditions.
CONDITIONS OF-CLEARANCE
1. Final clearances and permit processing is by the Jurisdiction.
2. A completed and - signed contractors :materiatand - test certificate shall be submitted to this office for
permanent filing. NFPA 13 Figure 10 -1(a).
3: Hydrostatic, flushing- andatarmtestsshattbe witnessed by a member of the building department.
Please use the phone numbers listed on the building pennit(s) to request the required inspections.
Because of the time invdvedrin thy tests :it is-best to request -these tests 24-hours in advance.
4. Only listed sprinklers shall be used and they shall be installed in accordance with their listing. Provide
spare heads and ty s of heads -used;
5. Sprinkler systems, induding hangers, piping, and sway bracing shall be designed and detailed for
lateralloads due to- earthquakes -in accordance with NR 13-to-minimize or prevent pipe breakage.
6. Prior to final inspection, a section cut of the sprinkler shall be forwarded to the Building Official.
DOCUMENTS TRANSMITTED:
1. Four (4) sets of sprinlder plans by Delta Fre, Inc. dated 11/18/02
SENT T YOU VIA: D
By:
Winstead-A 0
Winstead & Associates, Architecture and Building Code Services, PC.