Correspondence June 29, 1995
Protemp Assoc.
807 NE Couch
Portland, OR 97232
Re: Oregon Business Park
16640 SW 72nd
Dear Sirs:
The plan has been reviewed for conformity to the applicable codes. Please submit the
followi g to complete the plan review.
. The attachment of permanent equipment (HVAC) supported by the
building's structural components shall be designed to resist the total design
seismic forces prescribed in Section 2336(b) of the Structural Specialty
Code. Provide an engineer's design specifying attachment requirements
[SSC Section 302(b)].
The permit can be processed when we have received the installation requirement.
If you have questions, please do not hesitate to call.
Sincerely,
James Funk
Plans Examiner
HAL.OGINUIMUNEC95 -0206