Correspondence rvp it'll- 03,9-3
October 25, 1994
John Romish Architect CITY OF TIGARD
2216 SE 24th Avenue
Portland, OR 97214
OREGON
Project: Precision Interconnect- Plan Check #10 -39C
16640 SW 72nd Avenue
Subject: Building Plan Review
(1991 UBC with Oregon Amendments)
The plans for this project were reviewed for conformity with applicable
codes. Please submit the following items for completion of the plan
review process at your earliest convenience:
1. Submit two copies of a site (vicinity) plan for location of
this building on the property.
2. Architectural barriers up to an expenditure of 25 percent of
the total project cost is required per UBC section 3112(a)1.
Please look at accessible items A -G and submit a price list
which totals 25 percent of the project cost with the plans
corresponding to such items.
3. Submit a typical wall detail with the insulation shown. Is
the warehouse heated? How are the walls attached to the floor
and structure above?
4. Submit a typical installation detail of the suspended ceiling
for seismic zone 3.
5. Controls, operating mechanisms and hardware, including
switches that control lighting and ventilation and electrical
convenience outlets, in accessible spaces, along accessible
routes, or as parts of accessible elements shall comply with
Section 3109(c).
Please make these corrections on the appropriate pages of the drawings
and resubmit 3 copies of each page to the City of Tigard for review.
This plan review does not include electrical or plumbing plan reviews.
Electrical concerns can be directed to Washington County at 640 -3470 and
plumbing concerns to Mike Sheehan at the City of Tigard at 639 -4171
extension 312.
If you have any questions or concerns, please do not hesitate to call.
Sincerely,
p
Mark Burrows
Plans Examiner
FAX (503) 684 -7297
mb /pc*10- 39.doc
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772
/ 6" e
4
s°pS�P i / ,
October 25, 1994 1 .
A
John Romish Architect CITY OF TIGA®
2216 SE 24th Avenue
Portland, OR 97214
OREGON
Project: Precision Interconnect- Plan Check #10 -39C
16640 SW 72nd Avenue
Subject: Building Plan Review
(1991 UBC with Oregon Amendments)
The plans for this project were reviewed for conformity with applicable
codes. Please submit the following items for . completion of the plan
review process at your earliest convenience:
v /1. Submit two copies of a site (vicinity) plan for location of
this building on the property.
\Al (4f''' 4�o
l� Architectural barriers up to an expenditure of 25 percent of
( the total project cost is required per UBC section 3112(a)1.
S-0\^,"'4 Please look at accessible items A -G and submit a price list
� which totals 25 percent of the project cost with the plans
corresponding to such items.
3. Submit a typical wall detail with the insulation shown. Is
ah _ „k the warehouse heated? How are the walls attached to the floor
,11 f and structure above?
Submit a typical installation detail of the suspended ceiling
fei f° on'2' J 4 for seismic zone 3.
( �- Controls, operating mechanisms and hardware, including
112( � 0 switches that control lighting and ventilation and electrical
convenience outlets, in accessible spaces, along accessible
routes, or as parts of accessible elements shall comply with
Section 31091c).
Please make these corrections on the appropriate pages of the drawings
and resubmit 3 copies of each page to the City of Tigard for review.
This plan review does not include electrical or plumbing plan reviews.
Electrical concerns can be directed to Washington County at 640 - 3470 and
plumbing concerns to Mike Sheehan at the City of Tigard at 639 -4171
extension 312.
If you have any questions or concerns, please do not hesitate to call.
Sincerely, GSc / SS v il k ( I_VN*4 \9\4Q ‘4\ §V 40105
Mark Burro w s
i VAVVW 5 Ail i
�rr�Gp
Plans Examiner P � ��l n ,���,\y 1 ' `
FAX (503) 684 -7297 V ,�
mb /pc#10- 39.doc \
611 p v�S - A V• �p (2. Vb- \ v 5
R ock
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 \'