Loading...
Correspondence rvp it'll- 03,9-3 October 25, 1994 John Romish Architect CITY OF TIGARD 2216 SE 24th Avenue Portland, OR 97214 OREGON Project: Precision Interconnect- Plan Check #10 -39C 16640 SW 72nd Avenue Subject: Building Plan Review (1991 UBC with Oregon Amendments) The plans for this project were reviewed for conformity with applicable codes. Please submit the following items for completion of the plan review process at your earliest convenience: 1. Submit two copies of a site (vicinity) plan for location of this building on the property. 2. Architectural barriers up to an expenditure of 25 percent of the total project cost is required per UBC section 3112(a)1. Please look at accessible items A -G and submit a price list which totals 25 percent of the project cost with the plans corresponding to such items. 3. Submit a typical wall detail with the insulation shown. Is the warehouse heated? How are the walls attached to the floor and structure above? 4. Submit a typical installation detail of the suspended ceiling for seismic zone 3. 5. Controls, operating mechanisms and hardware, including switches that control lighting and ventilation and electrical convenience outlets, in accessible spaces, along accessible routes, or as parts of accessible elements shall comply with Section 3109(c). Please make these corrections on the appropriate pages of the drawings and resubmit 3 copies of each page to the City of Tigard for review. This plan review does not include electrical or plumbing plan reviews. Electrical concerns can be directed to Washington County at 640 -3470 and plumbing concerns to Mike Sheehan at the City of Tigard at 639 -4171 extension 312. If you have any questions or concerns, please do not hesitate to call. Sincerely, p Mark Burrows Plans Examiner FAX (503) 684 -7297 mb /pc*10- 39.doc 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 / 6" e 4 s°pS�P i / , October 25, 1994 1 . A John Romish Architect CITY OF TIGA® 2216 SE 24th Avenue Portland, OR 97214 OREGON Project: Precision Interconnect- Plan Check #10 -39C 16640 SW 72nd Avenue Subject: Building Plan Review (1991 UBC with Oregon Amendments) The plans for this project were reviewed for conformity with applicable codes. Please submit the following items for . completion of the plan review process at your earliest convenience: v /1. Submit two copies of a site (vicinity) plan for location of this building on the property. \Al (4f''' 4�o l� Architectural barriers up to an expenditure of 25 percent of ( the total project cost is required per UBC section 3112(a)1. S-0\^,"'4 Please look at accessible items A -G and submit a price list � which totals 25 percent of the project cost with the plans corresponding to such items. 3. Submit a typical wall detail with the insulation shown. Is ah _ „k the warehouse heated? How are the walls attached to the floor ,11 f and structure above? Submit a typical installation detail of the suspended ceiling fei f° on'2' J 4 for seismic zone 3. ( �- Controls, operating mechanisms and hardware, including 112( � 0 switches that control lighting and ventilation and electrical convenience outlets, in accessible spaces, along accessible routes, or as parts of accessible elements shall comply with Section 31091c). Please make these corrections on the appropriate pages of the drawings and resubmit 3 copies of each page to the City of Tigard for review. This plan review does not include electrical or plumbing plan reviews. Electrical concerns can be directed to Washington County at 640 - 3470 and plumbing concerns to Mike Sheehan at the City of Tigard at 639 -4171 extension 312. If you have any questions or concerns, please do not hesitate to call. Sincerely, GSc / SS v il k ( I_VN*4 \9\4Q ‘4\ §V 40105 Mark Burro w s i VAVVW 5 Ail i �rr�Gp Plans Examiner P � ��l n ,���,\y 1 ' ` FAX (503) 684 -7297 V ,� mb /pc#10- 39.doc \ 611 p v�S - A V• �p (2. Vb- \ v 5 R ock 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 \'