Loading...
Permit CITY OF TIGARD BUILDING PERMIT • COMMUNITY DEVELOPMENT Permit #: BUP2010 -00237 TIGARD 13125 SW Hall Blvd., Tigard OR 97223 503.639.4171 Date Issued: 11/05/2010 Parcel: 2S 113AA00300 Jurisdiction: Tigard Site address: 16320 SW 72ND AVE B3 Subdivision: OREGON BUSINESS PARK I Lot: 0 Project: SERVICE PARTNERS Project Description: Racking. Owner: FEES PACIFIC REALTY ASSOCIATES Description Date Amount 15350 SW SEQUOIA PKWY #300 Permit Fee - Additions, Alterations, 10/28/2010 $301.85 PORTLAND, OR 97224 Demolition PHONE: 503- 624 -6300 12% State Surcharge - Building 10/28/2010 $36.22 Plan Review 10/28/2010 $196.20 Plan Review - Fire Life Safety 11/05/2010 $120.74 Contractor: ABOVE ALL INSTALLATIONS LLC 15752 SW 82ND AVE TIGARD, OR 97224 PHONE: 503 - 969 -2506 FAX: Specifics: Type of Use: COM Class of Work: ALT Dwelling Units: 0 Stories: 0 Height: 0 ft Bedrooms: 0 Bathrooms: 0 Value: $15,000 • Floor Areas: Total Area: 0 Accessory Struct: 0 Basement: 0 Carport: 0 Covered Porch: 0 Deck: 0 Garage: 0 Mezzanine: 0 Total $655.01 Required: Required Items and Reports (Conditions) 1 BUP Bolts in Concrete Fire Sprinkler: Yes Parapet: Fire Alarm: Protected Corridors: Smoke Detectors: Manual Pull Stations: Accessible Parking: 0 This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in a • - _ .- • proved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATT • ' TION: Oregon law -quires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952 -001 4010 through OAR 952 -• '1-01 0. ou may obtain a copy of the rules or direct questions to OUNC by cabin! 503.246.6699 or 1.800.332.2344. i Issued By: , /� /�L1/ Perm ittee Si A Call 503.639.4175 by 7:00 a.m. for an inspection • s ness • y. This permit card shall be kept in a conspicuous place on the job site until c.. pietion of the project. Approved plans are required on the job site at the time of each inspection. Mr Building Permit Application Commercial RECEIVED Foli 0,,,c1.: usl: oNi.l p City of Tigard 2 8 Received D Permit No.: /A/ avlo- 00) 37 13125 SW Hall Blvd., Tigard, OR 97223 2010 0 � 0 Plan Revie • • ' OCT 2 II Phone: 503.639.4171 Fax: 503.598.1960 Date/B : ' ` Ael Other Permit: ; t p fl ( J- 0 , , Tit n It a g g ardor. ov BUILDING DIVISION Inspection Line: 503.639.4175 CITY TIGARD Date Ready : y: i �� See Page for Internet: www.ti N otifie. a od: / 7 Su lemental Information j TYPE OF WORK ' / Q UIRED DATA 1- fliND 2- FAMILY DWELLING ❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all ❑ Addition/alteration/replacement Other: / equipment, materials, labor, overhead, and the profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1- and 2- family dwelling .mmercial/industrial Valuation: S ❑ Accessory building ❑ Multi - family Number of bedrooms: ❑ Master builder ❑ Other: Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: / 6 3 Z 0 ? )` it Z New dwelling area: square feet City/State /ZIP: 1-j 5 GC— d j( a 7,- y Arip6ri Garage /carport area: square feet Suite/bldg. /apt. no.: P roject name: (' p v 1 l � Covered porch area: square feet Cross street/directions to job site: v Deck area: square feet Other structure area: square feet REQUIRED DATA: COMMERCIAL -USE CHECKLIST Subdivision: Lot no.: Permit fees* are based on the value of the work performed. Tax map /parcel no.: Indicate the value (rounded to the nearest dollar) of all equipment, materials, labor, overhead, and the profit for the DESCRIPTION OF WORK work indicated on this application. Valuation: $ At-rfill /liftez,A2 Existing building area: square feet New building area: square feet PROPERTY OWNER I ❑ TENANT Number of stories: Name: f4.-- f r1/, Type of construction: Address: Occupancy groups: City /State /ZIP: Existing: y' Phone: ( Y o 6, '3 00 Fax: ( ) New: /Al ,APPLICANT Cl/CONTACT PERSON r / NOTICE Business name: Jo r - /I il' All contractors and subcontractors are required to be Contact name: ifs / a, /',/y (-- licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address: -7 3 7 , / rh / kt..., (V /Li jurisdiction in which work is being performed. If the City /State /ZIP: ,Du ( -j r � �f 2 7.-- Z� apply: is exempt from licensing, the following reasons / �' / ` ` pP y: Phone:Y � vJ) f/ 0 I p ��3 I Fax: : (L 7) 6L.7)- ��ir%/ E -mail: CONTRACTOR Business name: 6d ir e_ / 0.-// .... i7 / 7/ . 4/4/7 - 1 ,1 ), 5 BUILDING PERMIT FEES* Address: (Please refer to fee schedule) Structural plan review fee (or deposit): City/State /ZIP: (fv 3 1 4 '9 ,s \06 I Fa x: ( ) FLS plan review fee (if applicable): Phone: 7 5 3q 1 - 77 / �_ Total fees due upon application: . CCB Iic.: l Z s e __ /./ ��/1 Amount received: 31.t }7 Authorized signature: v1 This permit application expires if a per is not obtained S� n within 180 days after it has been accepted as complete. Print name: /,?�� u � -- 1 I Date: / (5 2 Q /t/ * Fee methodology set by Tri-County Building Industry N ` H Service Board. 1:\Building\Permits\BUP -COM PermitApp.doc 10/01/09 440 -4613T(11 /02/COM/WEB) L k F)-6_.-- e . Building Division Accessibility: Barrier Removal Improvement Plan - rIGARD REQUIREMENT: OREGON REVISED STATUTE (ORS) 447.241. (1) Every project for renovation, alteration or modification to affected buildings and related facilities shall be made to insure that the path of travel to the altered area and the restroom, telephones and drinking fountains are readily accessible to individuals with disabilities unless such alterations are disproportionate to the overall alterations in terms of cost and scope. (2) Alterations made to the path of travel to an altered area may be deemed disproportionate to the overall alteration when the cost exceeds twenty-five per -cent (25 %). VALUATION: Total of all renovation, alteration or modification being done, excluding painting and wallpapering: [1] $ MULTIPLIER (25% barrier removal requirement): x .25 TOTAL BUDGET FOR BARRIER REMOVAL: [2] $ ELEMENTS: In choosing which accessible elements to provide under this section, priority shall be given to those elements that will provide the greatest access. Elements shall be provided in the following order: (a) Parking $ (b) An accessible entrance: $ (c) An accessible route to the altered area: $ (d) At least one accessible restroom for each sex or a single unisex • restroom: $ (e) Accessible telephones: $ (f) Accessible drinking fountains: and, $ (g) When possible, additional accessible elements such as storage and alarms: $ TOTAL (shall equal line [2] of Valuation Computation): $ I: \Building \Permits \BUP -COM PermitApp.doc 06/25/08 Algr 74 e Building Division Plan Submittal Requirements - r I c:. A R D Commercial & Multi- Family - New, Additions or Alterations 1. SITE PLAN (fully dimensional, drawn to scale) labeled with: A. ❑ map & tax lot # ❑ project name ❑ site address ❑ suite number ❑ zoning ❑ applicant name ❑ phone number B. North arrow. C. Scale (architectural or engineering only). D. Street names. E. Setbacks. F. Parking, including disabled access. G. Finished floor elevations. 2. EROSION CONTROL PLANS AND DETAILS. 3. BUILDING PLANS: See the "Plan Submittal Requirement Matrix" for the number of plans required based on submittal type (no redlines or tape -ons accepted). All details listed below shall be incorporated into the plans: A. Scale (architectural or engineering only). B. Foundation plan. C. Floor plan(s). D. Cross sections. E. Reflective ceiling plan. F. Seismic bracing detail for suspended ceiling. G. Roof plan. H. Exterior elevations. I. Structural calculations, plans, details and specifications. J. Accessibility barrier removal worksheet. K. Deposit - based on valuation of project. 4. EXTRA SET OF THE FOLLOWING: A. Two (2) copies of site plan to include vicinity map. B. One (1) copy of erosion control plan with details. C. Fire Department Building Survey, and full set of architecture drawings. I: \Building \Permits \BUP -COM PermitApp.doc 06/25/08 III 0 Building Division Plan Submittal Requirement Matrix T I c A it D Commercial & Multi- Family - New, Additions or Alterations Type of Submittal # of Plans (Includes new, additions and alterations.) Required at Submittal Demolition Permit 2 (site plan required showing location and square footage of all buildings to be demolished) Site Work 2 (must include location of all accessible parking) Plumbing (site utilities) 2 Building 2 Fire Protection System 2 Mechanical 2 Plumbing (building fixtures) 2 Electrical 2 Plan review is dependent upon submittal of a completed application and plans. After plan review approval, the Plans Examiner will contact the applicant to request additional sets of plans for distribution purposes (for contractor, City of Tigard, Washington County, and Tualatin Valley Fire & Rescue) I: \Building \Pemvts \BUP -COM PermitApp.doc 06/25/08