Plans 2c0- 660 ��--- City of Tigard, Oregon • 13125 SW Hall Blvd. • Tigard, OR 97223 April 2, 2008 '1 RE: FIRE SPRINKLER SYSTEM Proiect Information T I GARD Building Permit: BUP2008 -00082 Construction Type: 3 -B Tenant Name: Convergint Technologies Occupancy Type: B Address: 16575 SW 72 Ave.. Occupant Load: 55 Area: NA Stories: 2 The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) 2007 edition; National Fire Protection Association, Standard 13 (NFPA 13) 2002 edition and the State of Oregon Fire Code (OFC) 2007edition. GENERAL 1. A supply of spare sprinklers (never less than 6) shall be maintained on the premises so that any sprinklers that have operated or been damaged in any way can be promptly replaced. These sprinklers shall correspond to the types and temperature ratings of the sprinklers on the property. Sections 6.2.9.1 & 6.2.9.2 NFPA 13. 2. The spare sprinklers shall be kept in a cabinet located where temperatures will not exceed 100 degrees "F" at any time. A special sprinkler wrench shall be provided and kept in the sprinkler cabinet to be used in the removal and installation of sprinklers. Sections 6.2.9.3 & 6.2.9.6 NFPA 13. 3. The clearance between the deflector and the top of storage shall be 18 inches or greater. Section 8.6.6.1 NFPA 13. The distance shall be increased to 36 inches for Large Drop sprinkler heads. Section 8.11.6 NFPA 13 4. Sprinklers shall be located a minimum of 4 inches from walls and spaced not less than 6 feet on center. Sections 8.6.3.3 & 8.6.3.4.1 NFPA 13. 5. Clearances shall be provided around all piping extending through platforms, foundations, walls and floors. The diameter of the hole shall be 2 inches larger than the penetrating pipe for pipe sizes 1 inch through 3 inches. The diameter of the hole shall be 4 inches larger than the penetrating pipe for pipe sizes 4 inches and larger 2 inches is required. Sections 9.3.4.1 & 9.3.4.2 NFPA 13. 6. All valves controlling the water supply for automatic sprinkler systems and all water flow monitoring devices shall be electrically monitored when the system serves more than 20 heads. Section 903.4 OFC 7. An approved audible sprinkler flow alarm shall be provided on the exterior of the building in an approved location. Such sprinkler water -flow devices shall be Phone: 503.639.4171 • Fax: 503.684.7297 • www.tigard- or.gov • TTY Relay: 503.684.2772 activated by water flow equivalent to the flow of a single sprinkler of the smallest orifice size installed in the system. Section 903.4.2 OFC 8. The system piping shall be braced to resist both lateral and longitudinal horizontal seismic loads to prevent vertical motion resulting from seismic loads. The structural components to which bracing is attached shall be determined to be capable of carrying the added applied seismic loads. Sway braces shall be designed to withstand forces in tension and compression. Bracing shall be attached directly to feed and cross mains. 9. The end sprinkler on a line shall be restrained against excessive vertical and lateral movement. 10.A11 concealed spaces enclosed wholly or partly by exposed combustible construction shall be protected by sprinklers. Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be maintained on the jobsite. The plans shall be available to the Building Division inspectors throughout all phases of construction. 106.4.2 OSSC When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. c Respectf 4 Nn Senior Plans Examiner (503) 718 -2436 dann a©tigard- or.gov