Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Permit
/ / //7 /v N pevyn t ; G,ckW 0-0o) - f - r . f Sav:Irkey CITY OF TIGARD PLUMBING PERMIT COMMUNITY DEVELOPMENT Permit #: PLM2010 -00364 TIGARD 13125 SW Hall Blvd., Tigard OR 97223 503.718.2439 Date Issued: 11/04/2010 Parcel: 2S102AA00600 Jurisdiction: Tigard Site address: 11940 SW PACIFIC HWY Project: Pacific Plaza Subdivision: Lot: 0 Project Description: Installation of (2) backflows for irrigation and replacement of (1) oil /water separator in catch basin. 11/17/10 added 200 ft. of sanitary sewer line. BT. Contractor: CASCADE PLUMBING CO Owner: ALPROP CO 2630 N HAYDEN ISLAND DR #3 6149 SW SHATTUCK RD PORTLAND, OR 97217 PORTLAND, OR 97221 PHONE: 503 - 289 -7095 PHONE: FAX: 503 - 283 -9514 FEES Quantity Description Date Amount 2 ea Backflow Preventer 11/04/2010 $62.54 Specifics: 1 ea Interceptor /Grease Trap 11/04/2010 $25.02 1 12% State Surcharge - 11/04/2010 $10.51 Type of Use: COM Plumbing Class of Work: ALT 200 If Sewer Service 11/17/2010 $100.06 Type of Const: 12 12% State Surcharge 11/17/2010 $12.01 Occupancy Grp: Stories: Total $210.14 Required Items and Reports (Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 952 - 001 -0010 through OAR 952 - 001 -0090. You may obtain a copy of the rules or direct questions to OUNC by calling 503.232.1987 or 1.800.332.2344. 11 0 . 4111111111 Issued By • Permittee Signature: / 1 Call 503. • •.4175 by 7:00 a.m. for the next available inspection date. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. o CITY OF TIGARD PLUMBING PERMIT .111 I: COMMUNITY DEVELOPMENT Permit #: PLM2010 -00364 TIGARD 13125 SW Hall Blvd., Tigard OR 97223 503.639.4171 Date Issued: 11/04/2010 Parcel: 2S 102AA00600 Jurisdiction: Tigard Site address: 11940 SW PACIFIC HWY Subdivision: Lot: 0 Project: Pacific Plaza Project Description: Installation of (2) backflows for irrigation and replacement of (1) oil/water separator in catch basin. Owner: FEES ALPROP CO Quantity Description Date Amount 6149 SW SHATTUCK RD PORTLAND, OR 97221 2 ea Backflow Preventer 11/04/2010 $62.54 1 ea Interceptor /Grease Trap 11/04/2010 $25.02 PHONE: 1 12% State Surcharge - 11/04/2010 $10.51 Plumbing Contractor: CASCADE PLUMBING CO 2630 N HAYDEN ISLAND DR #3 PORTLAND, OR 97217 PHONE: 503 - 289 -7095 FAX: 503- 283 -9514 Type of Use: COM Class of Work: ALT Type of Const: Occupancy Grp: Stories: Total $98.07 Required Items and Reports (Conditions) This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done in accordance with approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 days. ATTENTION: Oregon law requires you to follow the rules adopted by the Oregon Utility Not ion Cente . ose rules are set forth in OAR 952 - 001 -0010 through OAR 952 - 001 -0100. You may obtain a copy of the rules or dire questions to OUNC ; , . 1. • 503.246.6699 or 1.800.332.2344. Issu B Permittee Sig ature: # jai LAW Call 503.639.4175 by 7:00 a.m. for an inspection that business day. This permit card shall be kept in a conspicuous place on the job site until completion of the project. Approved plans are required on the job site at the time of each inspection. 11/03/2010 15:42 5032839514 CASCADE PAGE 01/03 Plumbing Permit Application Building Fixtures OCEDM r rOi: oi• r i( is I ;i•: O\►. City of Tigard 3 Z Oli� •/r J io / Permit No.: ° 4/1010.- oa3loV IN .-- • 13125 SW Hall Blvd, Tigard, OR 97223 �� () ptaa Review l ' Phone: 503.639.4171 Fax: 503598.1960 , Other Pamit No.: inspection Line: 503.639.4175 F TIG ....i,"7:..-... d3r ram ill see Page 2 for i i Internet www.dgard- o�r.gov C G 1�IVI' uhod s, .. ,.... , al Information : .T Y PE CF . : E VIL' . ' • - FE4* SC�AVLE - © New construction 0 Demolition For spacial Snformadion roe checklist Description J Qty. I Ea. 1 Total G V . 'on/alteration/replacement ❑ Other. New 1- 2- family dwellings (includes 100 ft for each utility connec1i ) CATE¢ORY. O €TlaON•.: • SFR (1) bath 312.70 ❑ 1- and 2-family dwelling ommercialrmdustrial SFR (2) bath , 437.78 f SFR (3) bath 500.32 ❑ Accessory building (] Multi -family Each additional bath/kitchen 25 -02 ❑ Master builder ❑ Other: Fite sprLdder (____ sq. ft) Page 2 • • 30B ark 114:00 TI6Pl. ANp VACATION site utilities: Job site address: J 1,q Q ) -Td /i U c 41-toil C atch basin or area drain 18.76 1 rywetl, leach line, or trench drain City/State/ZIP: City/State/ZIP: • 4 Q Footing drain (no. linear ft: 18 -76 Page 2 Suite/bldgJapt- on.: Project name: Pr! it) t Ju 1 e • ' IN Maindisctmcd home utilities 50.03 _, Cross sired/directions to job site: Manholes 18.76 Rain drain connector 18 Sanitary sewer (no. linear ft: __) Page 2 Storm sewer (no. linear ft: Page 2 Water service (no. linear ft.: _J Page 2 Subdivision: I Lot no.: Fixture or item: Bacd pt eventer 3127 b2 .5 Tax map/parcel no.: Backwater valve 12.51 D 1SCRIrTl , OF Wog& Clothes washer 25.02 _Ate . I. _ _ _ • t 1 tO C1* Dishwasher 25.02 • r /� do , . rW' fountain 25.02 • ■ u I diL 1:4A.. OW n Ejectors/sump 25.02 • ❑ PROPERTY OWNliiit • • w• • Q TSINANT 4 • . ' • Expansion tank 12.51 _Pixturelsewer cap 25.02 Name: Floor drain /floor sink/hub 25.02 Address: Garbage disposal 25.02 City/State/ZIP: Hose bib 25.02 Phone: ( ) Fax ( ) Ice maker 12.51 • `[(. Co - 4TAClr wnSON Interceptor/geese trap / 25.02 o$, o 2- Medical gas (value: S _) Page 2 Business naoae: ` .1, _ ( • i ;02_ ,11 . „ Primer - 12.51 _2,4 Conrad name: Roof drain (commercial) 12.51 Address: Sink/basin/lavatory 25.02 - City/State/ZIP: Solar units (potable watts) 62.54 Phone: ( ) I Fax : ( ) Tub /shower /shower pan 12.51 Urinal 25.02 £' Water closet a 25.02 C Water heater • 37.52 Business name: St//►► .� i i • . Water pipinglDWV 5619 Address: b 1 ►) . . • ' J / . 4 - 3 Other: 25.02 Cltyr . - Ar• 1 .1 '1'7 s ubtotal / ►)1 _ �. A Minlrwm permit foe: S72.50 Phone3 3) 1 a Plan review (25% of permit fee) CCB Lic.: Plumbing Lio. no.: r 2 G' iJT `� State surcharge (12% of permit fee) A , Authorized signature: �� � ,--- TOTAL PERMIT FEE .. Q A • Q n permit application expires if e permit is not obtained within 180 days Print name: . ! Date: l � •• 0 • b after it has beta accepted as complete. Ca/u' •Fee wethodotosy sic 'fa-County -County Building Industry Service Board. i /�J L rsmitppp.dpc 10l0 ,. 440.46167'(10r01JCOM/1yE8) 11/15/2010 14:36 5032839514 CASCADE PAGE 01/03 Plumbin Perm A licat 0 Building Fixtures 1 -oir ol>r- (1.: 1.•SII ONLY City of Tigard � 1 Q'� ® Date/By: I I / ( id Cr ' �J � • 13125 SW Hall Blvd., Tigard, OR 97223 `M 1�'" 41an mew r`" �13 tl Ait Phone: 503.639.4171 Fax 503.598.1960 - . NC 111 at e/B : Other per 130.: Inspection Line: 503.639.4175 0%,,,c11.'" 1t} Date Ready/By: El Pane 2 for 'i i i::,� It E) hamlet www.tigard -or.goy ( `1 ' x `1 v Notified/Method: N Su. , lemeat a l information ,OF ,. . �1�,� Kamm : 0 Demolition o Fors - Nitration use checklist }] New construction Deco► , ; on r • MEM Total ■?/ dditiou/alteration/replacemeltt 0 Other: New 1- 2-family dwellin • . (includes 100 ft. for each utill connection - , SFR (1) bath 312.70 . T)gCpRY. O)9 EEI&(Alf31l1LLTETI SFR (2) bath 437.7$ 0 1- and 2- family dwelling f_ ommercraUutduslrial NM 530.32 SFR (3) bath IIIII 0 Accessory building 0 Multi - family Each additional bath/kitchen 11. 25.02 ❑ Master builder ❑ Other: Fire sprinkler ( .- sq. ft) MEM srri ON AND Site utilities: JOB � . Knorr � � � �' ° Job site address: Q {� W . Catch basin or area drain Drywcll, leach line, or trench drain _ 18.76 MEM City /State/ZIT: ° C(,/i /' . Ok. Footing drain (no. linear ft: _. _) - ... -- - „' Suite/bldg./apt. no.: Project name. M a n u f a c t u r e d home utilities J 0.03' , Cross street/directions to job site: Manholes iliMil 1'llkli A'�iTh% Rain drain connector • � Sanitary sewer (no. linear R: au Page 2 Storm sewer (no. linear':• > Water service (no. linear ft: '� Mil Subdivision: Lot no.: Fixture or item: �� Backflow preventer Tax map /parcel no.: Backwater valve 1151 1E DE CRW flON soP .WOIt2>i Clothes washer 25 -OZ �� (/ _____ - �: _. I. " I Dishwasher 25.02 - M /L, r t- fi ad 140 " 1 • • Drinking tbuntain _ 25.02 MINI Ejectors/sump _ 25.02 - , 0 ANT Expansion tank 12.51 ❑ PROPERTY art, Fixture /sewer Cap 25.02 Name: Floor drain/floor sink/hub 25.02 Address: Garbage disposal _ 25.02 NM City /State /ZIP: Hose bib _ 25.02 Phone: ( ) Fax: ( ) Ice maker 12.51 CONTACT FfRSCN Interceptor /grease trap 25.02 I];' A'[rl'EIF1';. :� : `� .: Page 2 Medical gas (value: 5 ) Business name: Primer _ 12.51 MI Contact name: Roof drain (commercial) MIIIMMI Address: Sinlc/basin/lavatory 25.02 City/State/HP: Solar units (potable water) 62.54 Tub /shower /shower pan 12. Phone: ( ) Fax ' ( ) 25.02 E-mail: in 25.02 arY1RACTaR IZEIIIII 37.52 ME Business name: IS ..I 'pi, . A L e' • ' Water piping/DWV _ 56.29 . �. i Ocher: 25.02 Address: 1�-� I. `e- Submt City/State/ZIP' e rs seen. (Ot ti h' Ii;t � . /, AA ']� Minimum permit fee: 572.50 MOW: 0)3 7695 Fax: �J6 3) v �' I Pl an review (25% of permit fee) EMIMMIIIIMINE Lic. no.: Plumbing State surcharge (12% of permit fee 1 .0 1 Authorized signature: - l TL TOTAL PERMIT FE - m print name: This permit application expires if a permit is not obtained within 180 dal (`� 0' � h� Date: after it has been accepted as complete. 1 )j 'Fee methodology set by T7i -County Building Industry Service Board. I:1YinldiV ng��+++b+�C�- P��°WPda 10/01 I' /"f'! 4404616T00/011COM/WEB) Cs M- J a 5 11/15/2010 14:36 5032839514 CASCADE PAGE 02/03 Plumbing P Application - City of Tigard Page 2 - Supplemental Information Residential Fire Su . ' ressiou S stems; 'e SChedul ®. zlr t� wY 7 r "K r r F i i , - q. ,I' �' � .L Lye B = _.. ` ?� s � N.. 1? i _ o to z 000 31-15.00 $ t t5.0o Foot s ly . Footing drain -1 I00' MI 55,00 2 001 0 60D 3115.00 Footing drain - each additional 100' MI 46.40 ME 2 001 to 7,600 $220.00 Sewer -1st 100' ■M 55.00 w � 7,20 and : : •'r $309.00 Sewer - each additional 100' En. 46.40 META Water Service -1st 100' - 5s.40 MIMI Medical Gas S stems. Water Service - each additional 100' ; �' r 1 .. Storm & Rain Drain - Ist 100' 11E1 55.00 $1.00 to 55 000.00 Minimum mum fee $72.50 Stone & Rain Drain - each additiona1100' 11.11 46.40 1.III 35,001.00 to 3I0,000.00 372.50 for the first $5,000.00 and $1.52 for each additional $100.04 or fraction thereof, to and l .: ' i r �� , t .. i T"+ , inciudin_ $10 000.00. �, ' ; .. Commercial Back Flow prevention Device 46.40 .0"14,..49, $10,401,00 to $25,000.40 $148.50 for the first $10,000.00 and 31.54 for _ each additional 3100.00 or eaction thereof, to INIERIIIII Residential Bad dl fee $36.25 Prevention 6.25 Device and includin_ $25 000,00. in , it fee $ 525,001.00 to $54,004.04 3379.50 for the first 525,000.00 and 51.45 for Rain Bradt single family dwelling 65.25 each additional $100.00 or fraction thereof, to Inspects existing plumbing including $50,000.00. Inspection of exists lambing or ill - lull nested i . - -pans - 72,50 hour $50,01.00 and up each additional $100 0 or fraction and 31.20 thereof r Subtotal : ,► j00 (X,o - . r . Sir.. ... _:.. - ,. i. !. Fixture Work: �, .. f! .' Plan review is required for any of the following. Are you capping, adding or replacing fixtures? If "yes", Plan check all that apAlY• please indicate work performed by fixture. Failure to * Meese Any new commercial building with water service 2" and accuratel re ort fixtures could result in increased sewer fees - heater, except systems designed and stamped by licensed - 4 a -3� t yi ^ 3'�Ft�l ki i r ' ( i s {.:. engineer. { i _ ! r � p G i (w) 1 3 v-z-4. j � i4 1W svi•Ar t � ,.. ir _ i H ; L� _ new exterior plumbing site utilities. Any ': r ? .1.., ,, !_. - `' ` ' N 0 Medical gas and vacuum systems for health care facilities. B: c Mom -Tu 0 Any multipurpose fire sprinkler system. Bath -T -Tub/Shower 0 Any complex structure as defined in 0AR918 -780 -004 - I cuzz if�hiry,,,l ���_�_ Car Wash -Each Stall Submit a sets of plans vvlth any of the above. _prjye fh►u item' }}t x . ldOf Ater ' �� . • -' ,gSi . ' ' i 0', Fry ' t r � ` i.' '' '"" � 1, 4 • Dishwasher -Commercial ri + F..r .. - Cbmmercial � � { .. _. -Domestic or riser diagram is required for new buildings Die Wash Fountain �� that meet the 4 ualifications above. e wa Floor Drain/sink - IMIIIII MMI Comments regarding fixture work: car wash Bradt - _ - °oblige -Domestic Disposal - Commercial 11/11111MMIESMOMIN -Industrial Ice Mach/Rai: ga Dimes ----- Oil .. ar9tor or G Gas Station Rec, Vehicle Dam. Station MIMI r IIMEIII Shower -Gang -� *Note: If the fixture work under this permit results in an - Stall Mii.11 ii.Mi..11111 increase of sewer EDUs, a sewer penult will be issued and Sink - Eat/lavatory MEIN MINI fees assessed for the sewer increase must be paid before the - Bradley �� plumbing permit can be issued -Commercial -Service MIMINIMIIIIMMINIMMIIIIIIMI Swimtnin: Pool Filter IIIMIIIIIIIIMIEIMIIMIMI Water Extractor IIIIMIIIIIIMEMIMIMMIII water Closet - Toilet MIIMIIIIMINIMMINIIMININI IIIIIMINIIIMIIMINIIIIMIIIIM Other Fixtures: MINliNiMMINIMIMINI - • RECEIVED cascade PL,uwt.bLwg co. N ov 1 9 2010 CITY OF TIGARD 2519 N. Hayden Island Dr. Portland, OR 97217 BUILDING DIVISI (503) 289-7095 Phone (503) 283-9514 Fax FAX TANSMTAL FORM ( t 4 cio ,§ 1 r, c 1- -41-oy To: 'Q I um bi (\C (J 3 S From: CRYSTAL JONES Name ` Date Sent: 11. - / 0 It -19 -10 CC: Phone: Number of Pages: Fax: (Including this one) Message: cascade PLuwaLwg is goLwg to be Lwstalliwg a oil separator for pert/Kit wu.vt ber: PLM2O1O -003 4. -here the spec sheet for what we are propos14,0. we wawt to male,e sure thou have this ow record for the perv4t awd also to wt,aize sure that Lt is aw approved product t. use LA, the citj of Tigard. l f jou could please cowtact Nea Zaehriwger t _97-i -255 225 Lt would be appreciated. 11 Uou V0 /t0 Cad SQdCSdC VIS6E8ZE05 OI:EZ OTOZ /6T /TT SPECIFICATIONS (P505 -50) L 1. 4" inlet and outlet connections. 1- 2. Max flow rate: 50 GPM j ° — Integral air- relief /anti - siphon iD 3. Liquid capacity: 60 Gallons (8 cu. ft.) . - 4. Max oil capacity: 30 Gallons I L n t l Lf1 —___ILI ,5. Unit weight wistd. covers: 106 Pounds I I / i-- 6. Maximum operating temperature 190 °E. C 7. At Max Flow Rate, unit removes 92% of all floatable substances with a specific gravity of 0.87 or less. I 1� I I w Efficiency increases at lower flow rates. �6., O ' I NOTES I , ___41 i i as T. tory installed Bulit-1n flow control.`" I , f ' 1 2. For gravity drainage applications only. Do not use for pressure applications. 1 m 3. 3/8" thick high density polyethylene walls. I ipn ( I m 4. Custom extension heights available. � J� J W 5. Engineered inlet and outlet diffusers are f ry CO removable to inspect/clean piping. W 6, For on- the -floor or buried applications. Lo 7. Light -duty polyethylene cover in with F— 5716" stainless steel bolts. a [Load Capacity 500 lbs.1 8. Integral Air Reliel / Ante- siphon. . 35 3/4" ( of 4" 'inlet ENGINEERED INLET AND OUTLET DIFFUSERS and outlet The inlet diffuser distributes incoming effluent into two paths that utilize the entire liquid volume of i [ the tank for efficient oil separation. The ` 6 1/2" c. 2" vent calibrated openings greatly reduce effluent 8 1/2' turbulence. The effluent enters the tank without i d isturbing the all or sediment layers. j I [ -,.„, A it I a _ _ Threoutlet diffuser allows only effluent vahiich T E�_ _t______________.._.1_ r j I 151 is free of oil to exi t the tank. I I I n D. 32 1 /2" I n III ENGINEER SPECIFICATION GUIDE I ? I D d Separator shall be Schier separator as manufactured by I r7 Schier Products, New Berlin, WI. Separator shall be lifetime - I I 26° i 1/2' m guaranteed and Made in USA of seamless, rotatronalty- l 24^ I I oil draw -off molded High Density Polyethylene with minimum 3/8" i j 17" uniform wall thickness. Separator shall be furnished with f —' t , 1 -1/2 " adjustable ofl draw -off connection and be suitable 1--i. for above or below grade installation. At the vnit's rated continuous flow, separator shall separate at least 92% of \f I l s all Iloatable liquid substances of spedfic gravity ,87 or less. I I f Cover shall be gasketed and constructed of High Density t n t I Polyethylene with minimum 5cO lb load capacity. f-- ENGINEERED INLET AND OUTLET Outlet End View OPTIONS: DIFFUSER [SEE DESCRIPTION) • EXT - Custom Extension to finished grade • PS2 - 2" Inlet and Outlet connections • P54 - 4" Inlet and Outlet connections • MPT - Male pipe thread connections • SC - 1/4' Steel treadplote cover S PE Cl F1 CATION SHEET DESCRIPTION: C.) n 0 Co 0 50 GPM, 30 GALLON OIL STORAGE Schier Products 60 GALLON LIQUID STORAGE 2$00 South 1701h 531 11 C) New Berfln, Wisconsin in 53151 f SCH m POLYETHYLENE OIL SEPARATOR Tel: 600 -627 -7119 Fax: 800- 827 - %d4 . k`�' 4.,,. �O��C�V WW1 CiPI 01. 6 :CFPr C}F1 TANX 6711141254 S m xxalanaas 311 WE praas w r} mu - 6661,24 vrww.schlerproducls. cam T N PART NUMBER: PSDS 50 MATS; HaPE �. ' ' Pioneering Drain Line Purity WA WARY ANL cONFIbINVAL Made In the LI.S.A - as ( ,`1717, d ,.��r� .` LWATZtK ° °p Z. A„ «.e... DWG BY: TEU (DATE: 6/13108 REV: 0 UNIT TAG No. : SPECIFICATIONS [PSOS -50] 1. 4" inlet and outlet connections. _ I—, 2. Max Row rate: 50 GPtat { — Integral air-relief/anti-siphon co 3. Liquid capacity: 60 Gallons (8 cu. ft.} I t n 1 I� / r i 4. Max oil capacity: 30 Gallons m S. Unit weight w /std. covers: 106 Pounds m 6. Maximum operating temperature 190 °F. j 7. Ai Max Flow Rale, unil removes 92% of alt flooiable substances with a specific gravity of D.87 or less. E co Efficiency increases of lower lbw rates. 26» E--) (Tl1 ► IF NOTES I I4 9 : F T Cory installed Built -In flow control. .-- 2. For gravity drainage applicatio only. I Do not use for pressure applications. I I Uri 3. 3/ 8' thick high density polyethylenewalls. ( m 4. Engineered inlet and outlet dffusers ore NJ removable to inspecl /clean piping. I m 5. For on-the-floor or buried applications. w 6. Light -duly polyethylene cover with Uri 5(16" stainless steel bolts. '— [Load Capacity 500 lbs.] 4 TO GRADE 1 p 7. Integral Ai' Relief / Anti - siphon. II 1 35 3/4" c of4 "inlet q T vent 1 and outlet 1 OPTIONS: } l I I I 5 O EXT - Custom extension to finished Specify 8 1/2" 6 1/2" dimension , floor or grade. Please supply Sid f d dimension from C.L. of Inlet to grade ' _to 1 I to grade. (See box above) I { • 1_ - — - " — 4 1 • 1 15 1/T ❑ P53 - 3 Inlet and Outlet connections ` 11 1> ❑ MPT - Male pipe thread connections -. 1 d m o SC - 1/4" Steel treadplate cover 1 26 I i 24" � k 1 H 1 T' r t s II Signature of ¢ —. Approval: I I �� • I I I I U :, i Si Company: + • Date of Approval: L INLET ANDOUTlET-1 oilaraw - oIT Cutlet End View • DIFFUSER [SEE DESCRIPTION} SUBMITTAL SHEET DESCRIPTION: 50 GPM, 30 GALLON OIL STORAGE Schler Products Z 2500 South 170th Street D 0 0 6 0 GALLON LIQUID STORAGE New 9erlin,Nfisconsin53151C� m POLYETHYLENE OIL SEPARATOR Te1:800.827 -7119 . • CRUSE 041. Waal /KM= auerl� Fax: 8O0 -B27 -9664 M \4 I WM:MVPS StoABLWIS YIERCIOM! WASTE UK= Me- maims wwvr.sC hlerproducts, cam * PRODUCT W al i PA RT NUMBER: PSOS -50 MAIL: HDPE E� ti!• [ Pioneerin Drain Line Purity Pr0PeesrrsNP co1 &mneM M a d e I n th U m S lIX''''' ;' IT '' " DWG BY: TEU MDATE: 8/22 08 REV: 0 .D. V.' OD , '_'r4fl oltAIr.n cI n IKin!'S FE ®Ct soI ttrm W P SSW. ' r_ OIL DRAW -Off I Schier Oil Separators are supplied with 1 172" draw -off unit consisting of an Lo Finished Floor -1 odjustabte drow -off tube and slip -nut. In orderfor the Oil Separator to work ry property, the oil draw -off must be adjusted to meet the correct operating m height for the flow of the unit. The of draw -off unit leads excess oil into an m oil drainage Ene and collection tank (PSOS and OS- series), where It can be Flow l� Flow —� N token care of properly. Once the Oil Separator is installed. on operating water level must be estabrshed. W Clean Pea gravel Remove covers and run water through separator at maximum flow rale. Move 1 or sand backrill adjustable draw -off tube between 1/4" to l/2 above operating water fire. If m Vent discharged oil contains water, raise adjustable tube unlit only oil is being removed. - Draw -off setting must be checked periodically. If draw -oft tube is properly set. water will not draw off with oil m . Oil draw -off r9 Base layer of If there is no collection ni fill must be tank cap this connection C compacted Lo Below Grade Installation Detail d awofft gravity re draw -off tube —r i Operating water level— I INSTALLATION I Always install and vent Oil Separator according to manufacturer's recommendations, specifier requirements and state and/or focal codes. Some local codes require double- wall containment Static water level i or placement within a concrete vault t . Inspect unit for defects and make sure it meets specifier requirements. Slip -nut Oil discharge to 2. Install Separator as close to fixture {s) as possible. Install Separator above grade, ■ collection tank . partially- recessed or 1[115h-to-Rom making sure these is enough room above and around Interceptor tar proper cleaning and maintenance 18" minimum). 3. Separators must be placed on flat, solid surface allowing support of bottom. When suspending Separator from floor above, units must be fully supported on Exterior wall D bottom with fl surlace strong enough to hold the unit weight and water /sludge of separator n capacity. All Interceptors must be independently supported to avoid stress on fitting connections. d 4. Solid waste. such as metal shavings and floor debris, will affect efficiency of unit, in Consider installing a Schier Solids Interceptor ahead of Oil Separator. PUMPING FREQUENCY: 5. Oil Separators utilize a built -in flow control. There is no external flow control device required for proper installation. Frequency depends on the capacity of the interceptor and the 7 . Connect vent piping t vent connections to vented on unit. s 7. Connect and vent outlet piping to vented sanitary drain piping to prevent siphoning, amount of oil and sediment in the wastewater. as r by locd code. 8. For increased oil storage on PSOS Interceptors, connect piping from oil draw -off After initial installation, if is recommended that the unit is pumped connection to separate ail storage container. [see POCT - Series) every 3 lo 4 weeks. Monitor each pumping to establish an adequate 4. Adjust oil draw -off to correct position. [see detail at right] maintenance schedule. 10. After piping is installed, inspect all pipe Joints to ensure there are no teaks. 11. Fri unit with water before backfilling and backlit with sand or pea gravel and ensure that there ore no sharps to avoid puncturing unit. Then replace cover prior to pouring concrete. NOTES' 12. Concrete may be poured. Concrete should reach a minimum of 4' deep, 6 " deep if Anchor file- c ter of separators are rated and manufactured with an internal flow control system Flange is used. If located in rough area, a concrete pad should extend 18" around a9 sides of unit. a in place. They do not require an external flow control system. Keep cover protected and in place during concrete pour. 13. System 'n now ready for use. Schier oil separators are not to be installed in any other manner except as shown. Consult local codes for separate trapping requirements, cleanoul locations and additional installation instructions DESCRIPTION: PSOS OIL SEPARATOR SERIES S chferProducts m INSTALLATION AND OPERATION SCHIER D AND MAINTENANCE GUIDE Tel: BOO-927-7119 Fox: 13 oducts. fl PRODUCTS gam. dl iolds eMnbJ wwwsehlerp erproduets . eom . . m "ter ��n PART NUMBER: PSOS MAIL: 4 }t, ' A m P,RIEuRY elDcosrroENne. Made In the U.S.A P Drain line Purity m. ;ila oi w.eICZ"..t, . ne 'pu6II)7JHwscsn4a1 H ,eotpre auEo DWG BY: TEU DATE: 6/30/10 REV: 0 p • NOV 9 2010 Gascade PLuvt.btv+,g Go. CITY OFTIG BUILDING DIVISION 2519 N. Hayden Island Dr. Portland, OR 97217 (503) 289 Phone (503) 283 -9514 Fax FAX TRA NISMITTAC.. FORM //q40 s w eICIFIC , Jwy To: plurylb,i(Ick C From: CRYSTAL JONES Name. ` Date Sent: CC: Phone: Number of Pages: Fax, (Including this one) Message: Cascao PLumbi.wg Ls go"i,vug to be Lnsta{.L144,0 a oLL separator for pervu.Lt t'wv>tiber: PL_M20i0-00 64. f -1-ere is the spec sheet for what we are propostvtg. we way.t to ma lee sure jou have this ov. record for the perwt t a aLso to vwa►e,e sure that it iz cn approved product ti use Lo, the cLtu of - regard. if Joe could pease cowtaet Ne .L zaehrLvtger at jy1-255 -22,y Lt would be appreciated. Th a v�h you t20 /T9 39dd 3QdoSdo tISEE8ZE05 ez :ST OW/60/TT to C - t t—' z i' SPECIFICATIONS [PSOS -50j O I. 4" inlet and outlet connections. Z O m 2. Max flow rate: 50 GPM f Inlegrat air- relief /anti - siphon G) 'T1 3, Liquid capacity: 60 Canons (8 cu. ft.] iv 4. Max oil capacity: 30 Gae.ons (- 11.1_1 t--/I ill C7 r-. Et:r m 5. Unit weight w /std. covers: 106 Pounds II I ., I� m 8 6. Maximum operating temperature 190`F. a 7. At Max Flow Rate, unit removes 92% of all floalable C [ o rii substances with a specific gravity of 6.87 or less. I — r Z Iv 5 Efficiency increases at lower flow rates. 26" )3i:: Ili' NOTES • m , 1. Factory installed Built -In flow control."' r ___t 4 1 2. For gravity drainage applications only. Do not use for pressure applications. I cn 3. 3/8" thick high density polyethylene walls. I Q j 1 W 4. Custom extension heights available. N 5. Engineered inlet and outlet diffusers are j &) co removable to inspeci/clean piping. --- W 6. For on-the-Boor or buried oppfcations. In 7. L ight -duty polyethylene cover with C> ------.. 5/16' stainless steel bolts. } A (Load Capacity 500 lbs.) 8. Integral Arr Relief / Anti - siphon. 35 3J4" I O Q of 4" inlet 1 f ENGINEERED INLET AND OUTLET DIFFUSERS and outlet `N cf he in e • user • is n'.0 es incoming e 'cent into 1 III two paths that utilize the entie liquid volume of f the the tank for efficient oil separation, The I I 6 1!2' I c 2° vent - tur b ul ated openings greatly reduce effluent 8 1/7 turbulence. The effluent enters the tank without , � {{ I s` : 34;11, disturbing the ail or sediment layers. I Ili ''I -- ii I J �� n The outlet diffuser allows only effluent which 1 • ill _ r 1 • I 15 i /2" - is free of oil to exit the tank. —. .i___ n I D in ENGINEER SPECIFICATION GUIDE 32 1 !2 I I i D 1 _ I Oil Separator shall be Schier separator as manufactured by I 1 j m Schier Products, New Berlin, WI. Separator shall be lifetime I _ I I 26^ 1 1 /2" guaranteed and Made in USA of seamless, rotationally- I 2I ^ . I i 1 oil draw -off S molded High Density Polyethylene with minimum. 3 /g' 17 „ uniform wall thickness. Separator shall be furnished with -- 1 -1/2" adjuslable oil draw -off connection and be suitable for above or below grade installation. At the units rated I 1 ► continuous flow, separator shall separate al least 92% of_____ all tloatable liquid substances of specific gravity .87 or less. - Cover shall be gasketed and constructed of High Density t 1 fit ftl I _ Potyethylene with minimum 500 lb load capacity. . -ENGINEERED INLET AND OUTLET Outlet End View OPTIONS: DIFFUSER [SEE DESCRIPTION] • DO - Custom Extension to finished grade • P52 - 2" Inlet and Outlet connections • PS4 - 4" Inlet and Outlet connections • MPT - Mole pipe thread connections • SC - 1 /4 "Steeltreadplate cover SPECIFICATION SHEET DESCRIP71ON: 0 50 GPM, 30 GALLON OIL STORAGE Schier Products 0 2590 South T70 Stree D 0 0 0 O ` b GALLON LIQUID STORAGE m POLYETHYLENE OIL SEPARATOR New Tel 1800 Wisconsin 3T 5T � SCHIER ask CRIME Cu GO 1l clutineAt 67MatESS Fax: 800-80-4664 w e m �s PAR !era RS .ISFiCEPIGL3 tRAVEWAS ttEttfiPdX5 www.s chief products.com T PRODUCTS PART NUMBER: PSOS -50 MAIL: HOPE r . s+ • . pioneering Drain lane Purity ND ? ,:.11 ;1 LVT Y M�.� i,° 0. CONFIDM D/C�i E w ln DWG BY: - FEU DATE; 6/13/08 . REV: 0 Made In the U,S A rOLO( CTh I,FItf,L IS 4MOt ihW�. rtt�tf; .YF.;li.;FtcSFIPt UHIS '�r4ft�. REV: tz P� .._ UNIT TAG No. ; C o I ZO P. i SPECIFICATIONS lPSOS -54] "Sty j o 1. 4" inlet and outlet connections. m 2. Max flow role: 50 GPM I Integra air ret ie #!anti- siphon CV i► iD 3. Liquid fy 60 Galbns [8 cu. ft.) I n 1 [ I CC rr-...1 '� i 4. Max oil l capes capacity: 3D Gallons �]_� )1,' — c 5. Unit weight w /std. covers: 106 Pou rsds 6. Maximum operating temperature 190'F. 7. At Max Flow Rate, unit removes 92% of all floatable I A z o •r substances with a specific gravity of 0.87 or less. I I I cn '— Efficiency increases at lower flow rotes. 26" Cl" � i N NOTES `I l I } \ j I. Factory installed Built -In flaw control I 1 --f I 2. For gravity drainage applications only. I Do not use for pressure applicatiorss. cn r 3. 3/8" thick high density potyeThyiene walls. l (�� J Q m 4. Engineered inlet and outlet diffusers are W removable to inspect /clean piping, 1 f N m 5. For on-the-Hoar or buried applications. .. w 6. tight -duly polyethylene cover with Cj LID at N 5/16` stainless steel bolls. [Load Capacity 500 lbs.) IQ TO GRADE 1 I A 7. Integral Air Relief / Anti - siphon. I I V I 35 314" 1 q of A" inlet 7' vent and oullei 1 I ❑ EXT -Custom extension to finished Specify 8 1 ' /2 ., r 6 1/2' floor or grade. Please supply dimension Std. dimension From CI of Inlet io grade . s _y; f II to grade. (See box above) I _ — _ f# I 15 112" • ❑ PS3 -3" Inlet and Outlet connections ; I 0 ❑ MPT - Male pipe thread connections 1 0 I I_ a D m 0 SC - 1 /4'Steel tread late cover 26 I I T' Ir Signature of I I I 1 I Approval: Company: — n l I 1111 MI __\ c 1 1/2' Dale of Approval: LENGINEERE#7 INLET AND OUTLETS oil draw -off Outlet End View DIFFUSER [SEE DESCRIPTION) ' SUBMITTAL SHEET DESCRIPTION: 50 GPM, 30 GALLON OIL STORAGE 1 0 a Schler Products • -o _'�. 60 GALLON LIQUID STORAGE 25005aufh17 sIn531 e�� SCI-IIER New Berlin, h i 17 1h St a t 51 POLYETHYLENE OIL SEPARATOR Tel: 800-827-7119 m Fax: 800827.9664 . nk �` R� ^����� m taros on wE ra AV EA1C.F! 6 talA www.schter roducis.cam % PRO ""° ® �"°°roL5 nmarroFS �"'� nEe cmv.s PART NUMBER: .SOS -50 MAIL: HDPE + �' E ' Pioneering Drain tine Purity piOPPIfARR A110CDNFIbU2111A1 DWG BY: TEU I DATE: 8 {22 /OB REV: 0 Made In the U.S.A - -- p f!E 2 L.ir �IH ;.a,O C:I f'6�'. , 901E li 4f PfCHEF lRO�JClf. i:!'I E, :„,. , )Eft, V'_!d,Fi21p'i Af wi , JL r' fT 7„1.. lhE 2TJIRF.l RVFUCIf,0 1— OIL DRAW-OFF ea Schier Ol Separators are supplied with 1 1/2' draw -off unit consisting of an in Finished Floor adjustable draw -off tube and slip -nut. In orderfor the Oil Separator to work ta properly, the oil draw -off must be adjusted to meet the correct operating m h for the flow of the unit. The oil Brow -off unit leads excess o into an m INSLIIIIIINE oil drainage fine and collection tank IPSOS and OS- series), where it can be taken care of property. F— flow —� aA �ffow- - 01 Once the Oil Separator is installed, an operating wafer level must be eslabfahed. 1Weei ' • - Clean Pea gravel Remove covers and run water through separator at maximum flow rale. Wove m ` or sand backfill adjustable draw -off tube between 1/4" fo 1/2" above operating water liriM t Vent = " ' discharged oil contains water, raise adjustable tube until only of is being ed. _ ' " Draw- off setting must be checked periodically. If draw -oft tube is prope � water will not draw off with oil .-. 01 Oil draw -off C) PI rsi Base layer of If there is no collection N fit must be tank cap this connection '- .-. CO Es compacted C NJ ED Imo o 01 Adjustable gravity Below Grade Installation Detail draw - off tube - p ° z Operating water level —, INSTALLATION I Always Install and vent Off Separator according to manufacturer's recommendations, specifier me requirements and state artd /orlocai codes. Some local codes require double-wag containment Static writer fever or placement wfthfn a concrete muff. 1 4 . Inspect unit for defects and make sure it meets specifier requirements. I Slip-nu Oil discharge to 2. Install Separator as close to fixture (s I as possible. Install Separator above grade, . collection tank partially- recessed or flush -to- floor, making sure there is enough room above and around Interceptor for proper cleaning and maintenance {8" minimum). 3. Separators must be placed on flat, solid surface allowing support of bottom. When . C. suspending Separator from floor above, units must be fully supported on Exterior wall 1 a> bottom with flat surface strong enough to hold the unit weight and water/sludge of separator O capacity. All Interceptors roust be independently supported to avoid stress on fitting 0 connections. d 4. Sod waste, such as metal shavings and floor debris, will affect efficiency of unit. O m Consider installing a Schier Solids Interceptor ahead of Oil Separator. PUMPING FREQUENCY' 5. Oil Separators utilize a built -in flaw control. There is no external How control ('� device required for proper installation, Frequency depends on the capacity of the interceptor and the V' 6. Connect vent vent piping to vent ri g to ven d on sanitary 7. Connect and vent ouEDel piping to vente snitary drain piping to prevent siphoning, amount of oil and sediment in the wastewater. as required by local code. 8. For increased oil storage on PSOS Interceptors, connect piping from oil draw -off After initial installation, it is recommended that the unit is pumped connection to separate oil storage container. [see POCT - Series] every 3 to 4 weeks. Monitor each pumping to establish an adequate 9. Adjust oil draw -off to correct position. (see detail of rightj maintenance schedule. to. After piping is installed inspect all pipe joints to ensure there are no leaks. I I _ Fill unit with water before backfilling and backfill with sand or pea gravel and ensure that there are no sharps to avoid puncturing unit. Then replace cover prior to pouring concrete. NOTES: 12. Concrete maybe poured. Concrete should reach a minimum of 4 "deep, 6 "deep if Anchor Schier oil separators are rated and manufactured with an internal flow control system flange is used. If faceted in rough area, a concrete pad should extend 18" around all sides of unit. already in place. They do not require an manufactured flow control system. Keep cover protected and in place during concrete pour. 13. System is now ready for use. Schier oil separators are not to be installed in any other manner except as shown. Consult local codes for separate trapping requirements, cleanout locations and additional installation instructions DESCRIPTION: PSOS OIL SEPARATOR SERIES INSTALLATION AND OPERATION Schier Products 13 AND MAINTENANCE GUIDE 1e1:800- 827.7179 � S SCHIER m fox B00 -B21 -9664 „t,`' `t ;� grey. .l dank www.schferproduets.com /v PRODUCTS m immix., s.POewcs Wwe,pt ,. xo,io 00. *, PROYIrE10.KY AHG CaNFIOElrliu PART NUMBER: PSOS MAIL: C i� ' Pioneering Drain tine Puri M= 1�WIN�•1011[o,t*NeJI,'.16RIMT�6 OUNFIDEMA 0�1GIElLI20V1Ci L.Lrt Made In the U.S.A g �` I f I%O01.ff1O!IDlv�,c[OIfi�11 it:,, 1�I5iRk"•IfdH6901f OIKflF11g01Cf]li Z.,.... DWG BY: TEU [DATE: 6/30/10 REV: 0 A