Loading...
Plans 11/01/2010 15:10 FAX 2006 C:: 10 system fan N crawl basement Bob Storer residence 7225 SW Ventura Drive _ street Tigard, Oregon 11/01/2010 15:10 FAX 8003 Active Sub -Soil / Sub -Slab Depressurization Radon System • (no scale) Exhaust (Released Above Ewe) xhaust slack n H Option 1: _ House Exterior ._ Schedule -40 •"" % ...• Exhaust t t ackthrough ABS or PVC per. %/ / M \ 1 %J% To Exhaust Fan • Exhaust Fan 7,/%2 Mounted In Attk (Rated for %Z . Exterior Use or Enclosed) 110 volt j7 - with disconnect 4._ . ....,,_A f/ elope Horizontal Legs I /// Down toward sub -slab Flexible � Hole, to Permit Condaneate Coupling % Drainage %/) Floo 1 t/1 `_- -- --,�.. Ow "'""` " %/ — "" "`r, ._ Connection to other \� 1 _ �^ � — — ' Suction POIM(s), w�- . �! — al If Any Sealant • /.J Joist Strapping (or , % /__ !./4 Suction % /1 III Pipe - .. t. • ___ F5 Sealant Aroupd - . auction Pipe Fvotinn' r . .. •k -;; ` {•..r'`: • ; y ., • 11/01/2010 15:10 FAX 421005 Active Sub -Soil / Sub -Soil Depressurization General Installation Notes: 1. System(s) to be Active, Sub -Soil Depressurization. 2. All work to comply with EPA protocols and Indoor Air Quality code requirements. 3. Exhaust fan(s) to be located so as to be accessible for installation, maintenance, and future replacement, and in a vertical run of vent pipe. 4, More than one system may be needed for the building. 5. Continuously running electric, inline duct exhaust fan(s) to be used. Exhaust fan specs: 21 -150 W, 60 hz, 115 V, 1.5 amps, 60 cycle. 6. Plastic vent piping shall be 3 inch (min.) Schedule 40 ABS or PVC. 7. Exterior vent piping to be primed and /or painted to match existing building. 8. Vent termination to be 12 inches above the roof /eave line. 9. All vent pipe joints /connections to be sealed and air tight. 10. Vent pipes shall not have low points so as to allow flow of any condensate within pipes to flow back to the sub -soil suction point(s). 11. Electrical fan disconnect shall be located within sight of exhaust fan unit. Electrical power to be drawn from existing building circuitry. 12. Provide proper flashing at all roof penetrations. 13. When possible and applicable, a manometer (air pressure gauge) shall be installed on or near the vent piping, and shall be a visible and /or audible mechanism that is simple to read or interpret. 14. All penetrations through existing concrete slab flooring or concrete perimeter footings shall be sealed and water- tight. 15. All fans and vent piping to be adequately secured: minimally every 8- feet for vertical runs, and every 4 -feet for horizontal runs. 16. System shall be clearly labeled "Radon Reduction System" or the like. System shall also be labeled as to: a. Date activated. b. Installers name. c, Information on how to contact installer. 11/01/2010 15:10 FAX 2004 • . Radon Mitigation for: : 9 , .72.255 w V• « r• 71 Jo_ f 02. q7 z 2~3 • Pro Jegt Ieormtion: 11 Owners: re 4 7oZ2 .5 V vtAW'- d /i Local Phone Plans by: Cascade Radon, Inc. 3449 SE S.,herman Portland, Oregon 97214 • 543 - 421 -4$13 bescription: Sing e- Family Residential Occupancy Building footprint: No change proposed. Open yard area: No change proposed. if • ,,