Loading...
Correspondence kk -ec. --er-43 September 13, 2006 -` CITY OF TIGARD Protemp Associates OREGON Bruce Butner 9788 SE 17 Ave Portland, OR 97222 RE: MECHANICAL SYSTEM ADDITION /MODIFICATIONS • Project Information Building Permit MEC2006 -00433 Construction Type: 3B Tenant Name: OCE Imagistics Occupancy Type: B Address: 16535 SW 72 Ave Occupant Load: 49 The plan review was performed under the State of Oregon Mechanical Specialty Code (OMSC) 2004 edition. The submitted plans are approved subject to the following 1. Equipment and appliances shall be installed as required by the terms of their approval, in accordance with the conditions of the listing, the manufacturer's installation instructions and this code. Manufacturer's installation instructions shall be available on the job site at the time of inspection. OMSC 304.1 2. The building or structure shall not be weakened by the installation of mechanical systems. Where floors, walls, ceilings or any other portion of the building or structure are required to be altered or replaced in the process of installing or repairing any system, the building or structure shall be left in a safe structural condition in accordance with the Building Cade. The cutting, notching and boring of framing members shall comply with OMSC 302 Sections 302.3.1 through 302.5.3. 3. Smoke detectors shall be installed in return air systems with a design capacity greater than 2000 cfm. Upon activation, the smoke detector shall shut down the air distribution system. Smoke detectors shall be connected to a fire alarm system and shall activate an audible and visible alarm at a constantly attended location. OR In occupancies not required to be equipped with a fire alarm system, actuation of a smoke detector shall activate a visible and an audible signal in an approved location. OMSC 606. 4. Equipment and appliances regulated by this code requiring electrical connections shall have a positive means of disconnect in accordance with the Electrical Code. OMSC 301.7 5. Gas piping systems under 14 inches water column pressure, shall be tested at a pressure of not less than 10 pounds per square inch gage for not less than 15 minutes with no perceptible drop in pressure. Welded • pipe and for pipe caring gas pressure greater than 14 inch water column pressure, the test pressure shall be at least 60 pounds per square inch for not less than 30 minutes. OMSC C406.4.1 6. Ducts shall be supported with approved hangers at intervals not exceeding 10 feet or by other approved duct support systems designed in accordance with the Building Code. Flexible and other factory -made ducts shall be supported in accordance with the manufacturer's installation instructions. OMSC 603.10 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 7. Metallic Ducts shall be supported in accordance with Sheet Metal & Air Conditioning Contractors National Association, Inc. (SMACNA) — Metal and Flexible. OMSC 603.4 8. Appliances be accessible for inspection, service, repair or replacement without removal of permanent construction. OMSC 306.1 9. Condensate from cooling coils or evaporators shall be collected and discharged to an approved plumbing fixture or disposal area. OMSC 307.1 10. Every refrigerant-containing part of every system that is erected on the premises, except compressors, condensers, vessels, evaporators, safety devices, pressure gauges and control mechanisms that are listed and factory tested, shall be tested and proved tight after complete installation, and before operation. Tests shall include both the high- and low - pressure sides of each system at not less than the lower of the design pressures or the setting of the pressure relief device(s). The design pressures for testing shall be those listed on the condensing unit, compressor or compressor unit name - plate, as required by ASHRAE 15. OMSC 1108 . 11. A person engaged in the brazing or welding of refrigeration piping shall have a valid certification meeting the requirements in OAR 918 440 - 0015. For refrigeration piping regulated by the State of Oregon Boiler and Pressure Vessel Program, see requirements listed in OAR 918 225 - 0310. All three of these administrative rules were effective July 1, 2001. OMSC 1101 12. 918 - 0015 Refrigeration Installer Certification All persons engaged in brazing or welding related to the installation, alteration or repair of refrigeration piping systems not regulated by the Oregon Boiler and Pressure Vessel Program under OAR Chapter 918, Division 225, shall be certified in accordance with the requirements of this rule. OMSC 1101 Mercury Thermostats The Stately' Organ plabibits the installation of thermostats that contain mercury in commercial and residential buildings. "In accordance with ORS 455.355, the disposal of thermostats that contain mercury shall be in accordance with programs established by thermostat manufacturers, their representative or distributor, or by delivery to sites that will ensure that the mercury does not become part of the solid waste stream or wastewater." When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Resp - • A , j al He . , Senior Plans Examiner