Report 06/$19/08 THU 15:35 FAX 503 670 9147 CARLSON' TESTING Z002
U1117113
Carlson T`esting Inc. ".`
0)1" n ° � ` � °`a Y
Y (1.:10o 40(0 M... S , N 630)5 ONNrb• Nd •1I
n,0n.•r. N v7777 lek� O R 97301 rF...4 011 WIG
!'.nom ... null NH 1149 Ph.... (5031 SR9 -f'S7 Phan,: (311133114 i3
Construction Materials Testing & Inspection Fu,. C , 4u 6u�9ir Fv: BO . aiROnrA a'•.,n.n.rinvlrl
Special Inspection
FINAL SUMMARY LETTER
June 19, 2008
Job #T0807219
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Building Department
Re: A Cut Above - Operations Center Remodel
16330 SW 72 Avenue - Tigard, OR
Permit No.: BUP2008 -00157
To Whom It May Concern:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Structural Steel (Fab shop only)
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested/inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
•
CARLSON TESTING, INC.
Neil S. Shannon
Project Manager
NSS /Id
cc: A Cut Above Construction - Bob Miller
City of Tigard Building Division
Nordling Structural Engineers - John Nordling