Correspondence ei6
March 29, 1996 O'TY OF
OREG
Johansen Electric, Inc.
Attn: Carl K. Johansen
1130 NE 174th
Gresham, OR 97230
Project: TUFCOAT, INC.
I4 x`00 SW 72nd
Tigard, OR 97224
Subject: Electrical Plan Review (ELC96 -0152)
The plans submitted were reviewed for conformity with the 1993
National Electrical Code (NEC) and the State of Oregon Electrical
Specialty Code. The following was noted:
1. The 1993 NEC is the minimum electrical requirement.
2. Electrical equipment approval notes:
A. Listed equipment with U.L., ETL or factory Mutual Labels
is approved.
B. Equipment without listing:
1. Requires electrical inspection by Michael Rudd,
Electrical Inspector, prior to connection.
2. Classified equipment may require field testing by
an approved testing laboratory.
a. Underwriters Laboratories Inc. (U.L.) of
Camas, WA. Telephone: (360)817 -5613, contact:
Scott A. Varner.
b. Inchcape Testing Services (ETL) of Beaverton,
OR. Telephone: (503)626 -6694, contact: Jim
Pierce.
3. The "Powder Booth" will have openings for a conveyor to pass
through. These locations will be Class II, Division 2 areas,
for a distance of 3 feet from the opening. NEC 516- 2(b)(3).
4. The permit does not indicate any control, branch circuits or
feeders to equipment.
13125 SW Had BMd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772
Johansen Electric, Inc.
March 29, 1996
pg. 2
5. The electrical installations involving industrial machinery
will meet the minimum standards of NFPA 70 (NEC) 1993, the
State of Oregon Electrical Specialty Code and NFPA 79 (1991).
Please contact Michael Rudd at (503)639 -4171, ext. 356, to discuss
the electrical notes.
Thank you for your coo.eration.
l/ .
'chael Rud
Electrical Inspector
e1c96- 0152 \tufcoat.doc
F
. ti.
= �s
•
cl Cc - (vs?,
March 29, 1996 CITY OF TIGARD
OREGON
Johansen Electric, Inc.
Attn: Carl K. Johansen
1130 NE 174th
Gresham, OR 97230
Project: TUFCOAT, INC.
1(0300 - 16-200 SW 72nd
Tigard, OR 97224
Subject: Electrical Plan Review (ELC96 -0152)
The plans submitted were reviewed for conformity with the 1993
National Electrical Code (NEC) and the State of Oregon Electrical
Specialty Code. The following was noted:
1. The 1993 NEC is the minimum electrical requirement.
2. Electrical equipment approval notes:
A. Listed equipment with U.L., ETL or factory Mutual Labels
is approved.
B. Equipment without listing:
1. Requires electrical inspection by Michael Rudd,
Electrical Inspector, prior to connection.
2. Classified equipment may require field testing by
an approved testing laboratory.
a. Underwriters Laboratories Inc. (U.L.) of
Camas, WA. Telephone: (360)817 -5613, contact:
Scott A. Varner.
b. Inchcape Testing Services (ETL) of Beaverton,
OR. Telephone: (503)626 -6694, contact: Jim
Pierce.
3. The "Powder Booth" will have openings for a conveyor to pass
through. These locations will be Class II Division 2 areas,
for a distance of 3 feet from the opening. NEC 516- 2(b)(3).
4. The permit does not indicate any control, branch circuits or
feeders to equipment.
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772
-
Johansen Electric, Inc.
March 29, 1996
pg. 2
5. The electrical installations involving industrial machinery
will meet the minimum standards of NFPA 70 (NEC) 1993, the
State of Oregon Electrical Specialty Code and NFPA 79 (1991).
Please contact Michael Rudd at (503)639 -4171, ext. 356, to discuss
the electrical notes.
Thank you for your coo.eration.
f J.LUIO
chael Rudd
Electrical Inspector
e1c96- 0152 \tufcoat.doc
•
1 ,
{