Report •
Carlson Testing, Inc. Main Office 4 Bend Office
5130 SW Meader Hudson Hudson 9.. Nf. 63025 09 Riley /l
Bend v a
Tigard OR 97223 Phone OR 9730 / OR Rile
Pharr: (503) 681 -3160 1060 Phone: (3 031 58 9 -/2S2 Phone: (511) 330.9155
Far /5031684-0954 Far: 15031589 -1309 Far 6111 330-9163
Construction Materials Testing & Inspection
(ul3Zco) —OUZ
Special Inspection
O
FINAL SUMMARY LETTER
August 14, 2006
T0602075
City of Tigard
13125 SW Hall Blvd.,
Tigard, OR 97223 -8199
Attn: Building Department
Re: Qualcomm 3- Tenant Improvement (Building A)
16101 SW 72 Avenue- Tigard
Permit# BUP2006 -00240
Dear Sir or Madam:
This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special
inspection of the following item(s) per our inspection reports only:
Bolting- Torque and Load Testing
All inspections and tests were performed and reported according to the requirements of Project Documents and, to the
best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders
and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's
design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in
full, without prior authorization from this office.
If there re any further questions regarding this matter, please do not hesitate to contact this office.
Respe tfully submitted,
CARL ON TESTING, INC.
N annon
Pro' ct Manager
N /ks
•
A J Weber Construction Inc- Steve Adams
Group Mackenzie- Tim Schweitzer
Pactrust- Martin Hanson