Loading...
Report • Carlson Testing, Inc. Main Office 4 Bend Office 5130 SW Meader Hudson Hudson 9.. Nf. 63025 09 Riley /l Bend v a Tigard OR 97223 Phone OR 9730 / OR Rile Pharr: (503) 681 -3160 1060 Phone: (3 031 58 9 -/2S2 Phone: (511) 330.9155 Far /5031684-0954 Far: 15031589 -1309 Far 6111 330-9163 Construction Materials Testing & Inspection (ul3Zco) —OUZ Special Inspection O FINAL SUMMARY LETTER August 14, 2006 T0602075 City of Tigard 13125 SW Hall Blvd., Tigard, OR 97223 -8199 Attn: Building Department Re: Qualcomm 3- Tenant Improvement (Building A) 16101 SW 72 Avenue- Tigard Permit# BUP2006 -00240 Dear Sir or Madam: This is to certify that in accordance with Section 1704.1.2 of the International Building Code, we have performed special inspection of the following item(s) per our inspection reports only: Bolting- Torque and Load Testing All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there re any further questions regarding this matter, please do not hesitate to contact this office. Respe tfully submitted, CARL ON TESTING, INC. N annon Pro' ct Manager N /ks • A J Weber Construction Inc- Steve Adams Group Mackenzie- Tim Schweitzer Pactrust- Martin Hanson