Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Plans
'08/24/2005 21:14 FAX 5037614912 MENG HANNAN CONSTRUCTION U002 Page 1 of 1 MAYES TESTING ENGIH ERS, INC :., field Renolt Subiect to Review, �w -s 917 134th St. SW, Suite A-1 Ph 425.742.9360 JOB NUMBER: P5175 DATE: 08-22 -05 Everett, WA 98204 Fax 425.745.1737 PROJECT: Tigard Shell Station Canopy 10029 S. Tacoma Way. Suite E -2 Ph 253.584.3720 PERMIT . THER: Clear Tacoma, WA 98299 Fax 253.584.3707 O R: ARCH: f � 2�4 - ��g 7911. NE 33 Drive. Suite 190 Ph 503281.7515 Meng - Portlend, OR 97211 Fax 503281.7579 ENGINEER: CONTR: Hannnan TYPE OF INSPECTION: Visual "SS Site" INSPECTOR: Raymond Steele HRS: SAMPLES: None TIME: TO: INSPECTOR: HRS: TIME: TO: SUMMARY: MTE Representative on site © the Tigard Shell Station Canopy, per request, to provide mechanical verification and visual special inspection of the Snug tight method of bolt tensioning (per Butler Building design specifications) on the 518 ", A -307 bolts and single pass fillet welds (fabrication provided in Spokane, Washington and shipped to site with out visual inspection of welds) per the approved print details, contract documents, AWS D1.1 -02 and the IBC -04. Observation, verification through mechanical testing and inspection has shown the formulation of sound weld and bolting practices that are in compliance with the print details, contract documents, AWS 01.1 -02 and IBC -04. Raymond L Steele /5 r AWS # 94100411 City of Portland # 639 OBOA # 333 • To the best of our knowledge, all items inspected today are in conformance with approved plans and specifications. © Yes ❑ No El Preliminary NONCONFORMING CONDITIONS /CORRECTIVE ACTIONS TAKEN: