Loading...
Report 09/25/00 NON 09:58 FAX 503 670 9147 CARLSON TESTING to%An 0e d Mahn Office &fleas Office Bend office P.O. Box 23914 4060 Hudson Ave., NE P.O. Box 7818 ° pp Tigard, Oregon 97291 Salem, OR 97301 Bend, OR 97709 all s On Testing, �� n Inc. P (503) 694-9 Phone (503) 589 12522 Phone (541) 3349155 g � FAX (503) 654.0954 FAX (503) 599.1309 FAX (541 330 -9163 September 25, 2000 70005268. CTI Permit No. RECEIVED FIELD INSPECTION REPORT SEP; 2000 DATES COVERED: August 23, 2000 $Y: PROJECT: Nike In -House Manufacturing - Tigard ADDRESS: 15705 SW 72 Avenue - Tigard, OR INSPECTOR: K. Thrall COP#657, WABO#THR545689, OBOA #347 08 -23-00: CT1 representative was on site, at the request of Scott with Howard S. Wright Construction, and observed cleanout and epoxy procedures for placement of 1 /2" all-thread rods with 4W •embedment at new tube steel door frame. Unable to achieve required depth on (6) locations. Depths achieved were: (2) at 4W, (2) at 4 ", (1) at 31/2", and (1) at 3 °. These depths written on columns at locations. Hilts Hy -150 cleaning guidelines were followed. • Note:. As per Keith with Eastern Steel, directed to observe and report without building permit or . City - approved plans. Required permit and plans detail to be sent to CTl by Scott with Howard S. Wright Construction. Our reports pertain to the materials inspected/tested only. Information contained herein is not to be reproduced. except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. • Respectfully submitted, CARLSON TESTING, INC. Douglas W. Leach Chief Executive Officer KT /sab cc: Nike - Dave Hinck City of Tigard VLMK - Kevin Capler Post -tt° Fax Note 7671 Gate Yi 'T � flwn COMOIN. C°. c, 1 Phone • Phone V x g Fax #