Loading...
Report 6,407-4/0 3 _o6a 0 3 Main Office Salem Office Bend Office P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918 Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708 Carlson Testing Inc • Phone (503) 684-3460 FAX (503) 684 -0954 Phone (503) 589 -1252 Phone (541) 330 -9155 FAX (503) 589 1309 FAX (541) 330 -9163 January 22, 2003 T0302349.CTI Permit No.: BUP2003 -00003 FIELD INSPECTION REPORT DATES COVERED: January 13, 2003 PROJECT: Nike — Golf Assembly ADDRESS: 15705 SW 72 Ave — Tigard, OR INSPECTOR: S. Fox — COP#597, OBOA #177, ICBO #0840028 -88, ACI #936672 01- 13 -03: As requested by Howard S Wright, CTI representative was on site to inspect epoxy procedures and the following was noted: Contractor epoxied (4) 7/8" x 9" all thread rods for the hardy shear panel holddowns. Two rods were installed at each ends. Holes were drilled 1" x 5 1 /2 ", and were thoroughly cleaned. Epcon C6 epoxy was injected and all thread rods were installed in conformance with approved project drawings. Epcon C6 was used in conformance with ICBO ER -4285. Epoxy had batch # EONR 70437 with expiration date of 1/2004. *** CHECK ONE BOX ONLY*" YES NO 1. This is a preliminary inspection only. — OR — ❑ 2. The work inspected conforms to acceptance criteria listed above. If "No," the portions of the work that are non - conforming items are clearly stated above and will be added to the NCL. Remaining portions of the work, which are not preliminary in nature, are to be considered as ® ❑ conforming. Our reports pertain to the materials inspected/tested only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted, CARLSON TESTING, INC. F. Hietpas Quality Assurance Manager , SF /ck cc: Nike Retail Services Inc — Eric Sorensen City of Tigard Building Dept VLMK — Trent Nagel Ralston Architects — Erich Karp 01 -13-03 fr.doc I Main Office Salem Office Bend Office • P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918 Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708 Carlson Testing Inc. Phone (503) 684 -3460 Phone (503) 589 -1252 Phone (541) 330 -9155 FAX (503) 684 -0954 FAX (503) 589 -1309 FAX (541) 330 -9163 Special Inspection FINAL SUMMARY LETTER February 7, 2003 T0302349 FILE City of Tigard COp Y 13125 SW Hall Blvd., Tigard, OR 97223 -8199 Attn: Building Department Re: Nike — Golf Assembly 15705 SW 72 Ave — Tigard, OR Permit No.: BUP2003 -00003 Dear Sir or Madam: This is to certify that in accordance with Section 1701 of the Uniform Building Code and Chapter 24.20, Title 24, we have performed special inspection of the following item(s) per our inspection reports only: Installation of Epoxy Anchors All inspections and tests were performed and reported according to the requirements of Project Documents and, to the best of our knowledge, the work was in conformance with the approved plans and specifications, approved change orders and applicable workmanship provisions of the State Building Code and Standards, as well as the structural engineer's design changes, approvals and verbal instructions. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respe r ully submitted, CARL :ON TESTING, INC. Ja7 F. Hietpas Q , ality Assurance Manager I H/Is cc: Nike Retail Services. Inc — Eric Sorensen VLMK — Trent Nagel Ralston Architects — Erich Karp P:\WORD%REPORTSWtNLTR \709302349 JAN 17 '03 02: 47PM VLMK ENGINEERS P.1 /1 CONSULTING P 503222.4453 ENGINEERS F 503.248.9263 E vlmk @vlmk.com 3933 SW Kelly Avenue • Portland • Oregon 97201 -4393 1N www.vlmk.com FIELD REPORT Date: January 13, 2003 Job No 202492 Project: Nike Golf - Dryer Room Permit No: 13 Address: '6SW 72nd Ave Contractor: Howard S. Wright Location: Tigard, Oregon Owner: Weather: Light rain TemplTime: Approx. 50 at 2:30 pm Present at Site: Steve Harding, Howard S. Wright; Trent Nagele, VLMK Consulting Engineers TO: Kimmo Akerblom, Ralston Architects A structural observation visit was made to review framing of the new dryer room. This room is a rectangular- shaped room approximately 10 feet wide with doors on each end. Framing of the room is cold formed metal studs and joists. At the time of my visit, rough framing of the room was complete. Sheathing had been applied to the top of the ceiling joists and along the long sides of the room. Hardy panels had been installed on each end of the room. The top mechanical unit had not yet been placed. Construction appeared to be in good order and per plans and specifications. Should you have any questions or concerns, please do not hesitate to contact me. Submitted By: 22t0e& Trent C. Nagele, P.E., S.E. VLMK Consulting Engineers cc: Eric Sorenson, Nike Steve Harding, Howard S. Wright Travis Lawson, Howard S. Wright City of Tigard TCN:jjs 1 Structural Engineering • Civil Engineering • Industrial Engineering • Planning • Studies / Evaluations • Entitlement K:Construction Docs'Field ReportsWfke Golf Dryer Room 1- 13- 03.doc