Correspondence Apr -23 -96 02:38P Stock &Assoc /R.Bauch &Assoc (206) 623 0160 P.02 r- 6 bO k • STOCK & ASSOCIATES A R C H I l' I C ' 1 ' U R E A N D I N T E R I O R S Date: April 22, 1996 To: David Scott, PE City of Tigard (503) 639 -4171 Fax (503) 684 -7297 From: Bruce Stock About: NIKE TETRA 2 Accessibility Calculation Provisions of Accessibility Budget Parking area re- striping $ 1,000 Replace existing non compliant doors and hardware $ 27,000 Accessible drinking fountain $ 1,000 - Replace existing non compliant electrical devices $ 9,000 Remove and replace bathrooms $ 53,000 Building entry ramp $ 25,000 Accessible signage $ 500 Total $116,500 Estimated Construction Cost 1 1,000 s.f. x $40 /s.f. = $440,000 Provisions Percentage $116,500 / $440,000 = 26% cc: Jim Kenworthy, LP2A Paul Fruin, NIKE 8z University Street Seattle. Washington 98tot Telephone: 206 6z 8860 P 3� Facsimile: zo6 6zt.ot6o l r -12 -96 O9:O4P BRUCE STOCK (206) 283 -1656 P_O2 Stock & Associates 82 University Street Seattle, Washington 98101 (206) 623-8860 Fax (206) 623 -0160 Date: April 9, 1996 Revised April 12, 1996 To: David Scott, PE City of Tigard (503) 639 -4171 Fax (503) 684 -7297 Jim Kenworthy, LP2A (503) 371 -2212 Fax (503) 371 -3853 From: Bruce Stock L About: NIKE TETRA 2 Request for Modification The following is an analysis of the existing building and the proposed corrections. We believe the corrections remove most of the serious deficiencies, greatly enhance the safety of the building, and are appropriate to the scale of the project. Existing Building Built in +/_ 1979. The building is an existing tilt slab building with 12 inch concrete interior columns, and wood roof system comprised of Glu -tam beams running north -south with wood parallel cord trusses on 24 inch centers running east -west. With exception to the roof system the building is non - combustible and is close to qualifying for Type 3N construction. The building has been used primarily for warehouse. There is an existing office tenant in the north section of the building. In the south section of the building there is 2,500 s.f. of existing office and 2,500 s.f. of existing mezzanine. There is an existing 2 hour area separation at grid line "G" with two fire- shuttered openings. The shutters have fusible links. The wall stops at the roof bottom of the plywood decking. The building was constructed on two lots that were not consolidated. The common property line roughly bisects the building. An application has been prepared by Dean Blair of David Evans and Associates, signed by the owner and submitted to Washington County for the consolidation of the two lots. The process is expected to require two to three days to complete. The area to the West of the building is insufficient to be considered to be a yard by itself. PacTrust, the owner of this property and the property to the west, has agreed to allow a deed restriction for each parcel restricting the use of this yard. This restriction allows the area increase l r -12 -96 09:04P BRUCE STOCK (206) 283 -1656 P.03 _ NIKE TETRA Request for Modification April 9, 1996 Revised April 12, 1996 described in UBC section 506(c) for both buildings. This improves the baseline significantly. Without this sideyard the maximum area is 36,000 s.f. North Section 52,093 s.f. South Section 69.457 s.f. + 2,500 s.f. mezzanine = 71,957 s.f. Total 121,550 s.f. Construction Type V - Non Rated Existing Occupancy - B2 Office and Warehouse Proposed Occupancy - B2 Office, Warehouse and Light Manufacturing Fire Sprinkler Existing sprinkler system is a dry system which was designed for high pile storage. The new sprinkler design will be office -light hazard and manufacturing - ordinary hazard. Bulk materials and finished product will be stacked three units high (approximate height of 12 feet) without a racking systems. See Factory Mutual Engineering review of the building. There are five fire hydrants located around the building. The site plan has been revised to reflect this information. Existing Allowable Area Calculation North Per Table 5C 8,000 s.f. 506.(a) 1 Separation on two sides 50% 4 000 s.f. Sub Total 12,000 s.f. 506.(c) Sprinklers x 3 Total 36,000 s.f. South per Table 5C 8,000 s.f. 506.(a) 1 Separation on two sides 35.6% 2.848 s.f. Sub Total 10,848 s.f. 506.(c) Sprinklers x 3 Total 32,544 s.f. Proposed Correction Allowable Area Calculation North Per Table 5C 8,000 s.f. 506.(a) 2 Separation on three sides 100% 8.000 s.f. Sub Total 16,000 s.f 506.(c) Sprinklers x 3 Total 48,000 s.f. 2 1h r -12 -96 O9:O4P BRUCE STOCK (206) 283 -1656 P_ NIKE TETRA Request for Modification April 9, 1996 Revised April 12, 1996 South Per Table 5C 8,000 s.f. 506.(a) 2 Separation on three sides 71% 5,680 s.f. Sub Total 13,680 s.f. 506.(c) Sprinklers x 3 Total 41,040 s. f. North Section Existing Area of 52,093 s.f. is 45% over the allowable. Revised Building - Area of 52,093 s.f. is 9% over the allowable. Corrections proposed are: • Changing sprinkler system from a dry system to a wet system will decreasing the response time • Reduced fire hazard with the proposed use. • Upgrade the area separation between building sections to comply with current code. South Section Existing Area of 71,957 s.f. is 121% over the allowable. Revised Building - Area of 71,957 s.f, is 75% over the allowable. Corrections proposed are: ,` • Separate the office area with a 2 hour occupancy separation. • Existing mezzanine will be abandoned. , • Exit signage and lighting will be installed. • Changing the sprinkler system from a dry system to a wet system will decreasing the response time. • Upgrade the area separation between building sections to comply with current code. — • An additional exit has been added on the west wall between grid lines J and K. • Add smoke detectors, strobe and horns to the office area per UFC Article 14 -2. • Add heat and rate of rise detectors to the manufacturing area per UFC Article 14 -2. cc: Jim Kenworthy, LP2A Paul Fruin, NIKE • 3