Loading...
Correspondence goyim 60s • December 9, 2004 CITY OF TIGARD OREGON Wyatt Fire Protection, INC 909 SW Burnham Tigard, OR 97223 RE: PCC 210 VACANCY, FIRE SPRINKLER SYSTEM Project Information Building Permit: BUP2004 -00535 Construction Type: 5N Tenant Name: PCC 210 Vacancy Occupancy Type: B Address: 15618 SW 72 Ave Occupant Load: NA Area: NA Stories: NA Hazard: Ordinary Group Commodity: NA The plan review was performed under the State of Oregon Structural Specialty Code (OSSC) • 1998 edition; and the Tualatin Valley Fire & Rescue Ordinance 99 -01 (TVFR99 -01) 1999 edition. The submitted plans are approved subject to the following. HYDROSTATIC TESTING All interior piping shall be hydrostatically tested at 200 psi and shall maintain that pressure without loss for 2 hours. The test pressure shall be read from a gauge located at the low elevation point of the system or portion being tested. Standard 9 -1, section 8 -2.2.1 OSSC. GENERAL 1. A supply of spare sprinlders (never less than 6) shall be maintained on the premises so that any sprinlders that have operated or been damaged in any way can be promptly replaced. These sprinlders shall correspond to the types and temperature ratings of the sprinklers in the property. Standard 9-1, section 2 -2.7.1 OSSC 2. A special sprinkler wrench shall be provided and kept in the cabinet along with the spare sprinlders to be used in the removal and installation of sprinklers. Standard 9 -1, section 2 -2.7.2 OSSC 13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772 e. 3. A minimum of 18 inches shall be maintained between top of storage and ceiling sprinkler deflectors. The distance shall be increased to 36 inches for large drop sprinkler heads. Standard 9 -1, section 4 -4.1.6 and 4 -4.3.2 OSSC 4. Sidewall sprinkler deflectors shall be located not more than 6 inches or less than 4 inches from walls and ceilings. Standard 9 -1, section 4- 4.2.3.3 OSSC Approved Plans: 1 set of approved plans, bearing the City of Tigard approval stamp, shall be maintained on the jobsite. The plans shall be available to the Building Division inspectors throughout all phases of construction. 106.4.2 OSSC When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Respectfully, W/1°(/7Y - • Val Henzel, Senior Plans Examiner