Plans MAY /09/200 FRI 11:18 AM FAX No. P. 002
ARROW ROOFING i ��.:�, =oc.)/6 -
0 1.7HEET 1Y.I.E .L AL, I
PRO.POSA4,
R-5
pF TIGARD
April 30, 2008 __ _
t I
Attn: Andrew Cartales
Conditionally Approved.,,..,......
Delta Fire see Letter to: Follow ................„ t
' 14795 SW 72 nd PerntitNumber: % Ire 41010 "'CO -`
Portland, Oregon 97224 Ad, - t . ''mss ry
Ph: 503 - 6204020 Fx: 503 - 620 -1068 By: 44471111 Datc f'T to„,
RE: Delta Fire -Main Building
14795 SW 72"
Portland, Oregon 97224 OFFICE COPY
We appreciate the opportunity to provide you with our quote on your project. We hereby
propose to furnish all materials and perform all labor necessary for the completion of the
following:
ITEM SCOPE OP WORK PRICE $
(New .060 TPO Roof Over Existing)
1. Provided Engineers Report
2. Office roof remove '14ft x 80ft of built up roof(west wall)
leaving existing Insulation In place, re- level area with
light weigh EPS foam Insulation
3, Canopy roof remove existing roof to wood deck
4. Clean all roofs of all debris
5. Over existing roofs for exposed surface)install fan fold
recover insulation (mechanically attached)
8. Install .060 TPO single ply roofing membrane
(mechanically attached)to all sections • •
7. Install new chem. Curbs to all electrical pipes as required
8, Install new TPO drip edge & Gravel stop metal and thru
wall scupper(were required)
9. Install new Coping , skirt &counter flashing metal (as
required)standard colors
10. Provide City of Tigard Re -Roof permit
Total cost for •-------- - --- --- • -4 $79,828.00
Includes 15 year manufacture warranty
CCB# 116103
P,O. BOX 55097, PORTLAND, OR 972385097 0 BUS: (003)4604767 0 FAX: (503) 480.2788