Loading...
Plans MAY /09/200 FRI 11:18 AM FAX No. P. 002 ARROW ROOFING i ��.:�, =oc.)/6 - 0 1.7HEET 1Y.I.E .L AL, I PRO.POSA4, R-5 pF TIGARD April 30, 2008 __ _ t I Attn: Andrew Cartales Conditionally Approved.,,..,...... Delta Fire see Letter to: Follow ................„ t ' 14795 SW 72 nd PerntitNumber: % Ire 41010 "'CO -` Portland, Oregon 97224 Ad, - t . ''mss ry Ph: 503 - 6204020 Fx: 503 - 620 -1068 By: 44471111 Datc f'T to„, RE: Delta Fire -Main Building 14795 SW 72" Portland, Oregon 97224 OFFICE COPY We appreciate the opportunity to provide you with our quote on your project. We hereby propose to furnish all materials and perform all labor necessary for the completion of the following: ITEM SCOPE OP WORK PRICE $ (New .060 TPO Roof Over Existing) 1. Provided Engineers Report 2. Office roof remove '14ft x 80ft of built up roof(west wall) leaving existing Insulation In place, re- level area with light weigh EPS foam Insulation 3, Canopy roof remove existing roof to wood deck 4. Clean all roofs of all debris 5. Over existing roofs for exposed surface)install fan fold recover insulation (mechanically attached) 8. Install .060 TPO single ply roofing membrane (mechanically attached)to all sections • • 7. Install new chem. Curbs to all electrical pipes as required 8, Install new TPO drip edge & Gravel stop metal and thru wall scupper(were required) 9. Install new Coping , skirt &counter flashing metal (as required)standard colors 10. Provide City of Tigard Re -Roof permit Total cost for •-------- - --- --- • -4 $79,828.00 Includes 15 year manufacture warranty CCB# 116103 P,O. BOX 55097, PORTLAND, OR 972385097 0 BUS: (003)4604767 0 FAX: (503) 480.2788