Loading...
Report _ p • . .. • •• • . City of Tigard Building Department 13125 SW Hall Blvd., Tigard, OR 97223 Phone: (503) 639 -4171 ----- ;,. , .:•••::: •-,;.,i 6 ?_ i Re -Roof Pre - Inspection. Report Form ._. % ` . .� ' l l , Requested by CL-ft-a-- Telephone f ) Job Address T 4-1,- 043 4 4 — 72- 4- 2- 1 - 7 — Permit #: Roof Aooess Location Date Requested Time Requested Type of Existing Roof • 1. Slope of roof deck A l 2. Roof /Penetrations/General Conditions OtQir ❑ Poor 3. Are there blisters ? (es 0 No 4. Are there cracks ? 'es ❑ No 5. Is there evidence of water ponding? ❑ Yes'" - 6. Is moisture present under roofing (leak)? ❑ Yes lo 7. Is roof insulation existing? Yes ❑ No 8. Is roof insulation wet? ❑ Yes Oftlo 9. Property line setbacks on all sides > 10 feet iYes ❑ No 10. Building size ❑ < 3000 sq. ft ❑ < 6000 sq. ft (6000 sq. ft 1 1. Building height g< 2 Stories ❑ > 2 Stories 12. Class of roof required ❑ Non -rated 13. Type roof deck Aombustible ❑ Non - Combustible 14. Roof drains ❑ Provided ❑ Required O Adequate 15. Overflow drains ❑ Provided ❑ Required p(Ade 16. Attic ventilation k( /A— ❑ Provided ❑ Required ❑ Adequate 17. Roof listing 9rovided ❑ Required 18. Installation Instructions 04 ❑ Required To re-ro this structure the following conditions must be met: _ (n� . lit.. t.--'‘- . ('.. —A- t.�v\SQL. Ve..■‘Q)---° C-. c r— The re-roof proposal • Approved for permit issuance if the conditions fisted above are met After obtaining your pen you must contact the Building Division for an inspection when the roof deck is ready for the first inspection. The fast inspection for a complete tear off is the deck inspection. For a built-up roofing system (overlay), the first inspection is at the start of the job. After the re -roof is complete, a final inspection is required. t Inspector /t Ext 7 - Y Date 6 /z4 /o 4 A r 1997 UNIFORM BUILDING CODE TABLE 15-A TABLE 15- A— MINIMUM ROOF CLASSES TYPES OF CONSTRUCr10N t r at iv - V OCCUPANCY FA . F.R. Ono-hour N Ono-hour N rite Ono-hour N A -1 B B — — — — — — A) 2 -2.1 B B B — B — B B — A-3 B B B B Bt C B B C A-4 B B B B B B B B 13 B B B B B B C B B C E B B B B B , B B B 9 F B B B B Bt C B B C H -I A A A A — — — — — H) 2- 3-4-S-6-7 A B B B B B B B B I) 1.1 -12 -2 A B B — B — B B — 1-3 A B Bt — B — — B — M B B B B B C B B C R -I B B B B Bt.3 C3 B" 91.3 C3 R -3 B B B B NR NR NR NR NR S -1.S -3 B B B B B C B 13 C S -2,S -5 B B B B B B B B BI • S-4 B B B . B — — — — — U B B B B NR NRa NR NR' NR A —Class A roofing. B Class B roofing. C--Class C roof covering. ER.—Fire resistive. H.T. —Heavy timber: N requirements for fire resistance. NR— Nonrated roof coverings. 'Except in wildfire hazard zones in Appendix Chapter 5. buildings that are not more than two stories in height and have not more than 6.000 square feet (557 m of II projected roof area and where there is a minimum of 10 feet (3048 min) from the extremity of the roof to the property line or assumed property line on all sides except for street fronts may have Class C roof coverings that comply with UBC Standard 15 -2. I ii 2 See Section 308.22. 3 Except in wildfire hazard zones in Appendix Chapter 5. nonrated roof coverings may be used on buildings that are not more than two stories in height and have not II more than 3.000 square feet (279 m') of projected roof area and where there is a minimum of 10 feet (3048 mm) from the extremity of the roof to the property line on all sides except for street fronts. 4 Except in wildfire hazard zones in Appendix C 5. unless otherwise required because of location, Group U. Division l roof coverings shall consist of not less II than one layer of eap'sheet. or built -up roofing consisting of two layers of felt and a surfacing material of 300 pounds per roofing square (14.6 kg/m of gravel or I other approved surfacing material. or 250 pounds (12.2 kg/m of crushed slag. • • • • 1 -149