Report City of Tigard hsuilding Department ([/ 0 , m
13125 SW Hall Blvd., Tigard, OR 97223 Phone: (503) 639 -4171
Re -Roof Pre.Inspection Report Form T_ IG*ARD.
Requested by C - (e v Telephon j S v 3 ) &� f 3 ° -) S la
Address ) q 1 ' 0 , ') 7 -' /`r v e- (I f b c.0--
Roof Access Location q
Date Requested .2-3 3 — 0 r Time Requested kin
Type of Existing Roof j3 U V
1. Slope of roof deck )/ i 7,-1 foot (ratio) %
2. Roof/Penetrations /General Conditions [Fair ❑ Poor
3. Are there blisters? lYes ❑ No
4. Are there cracks? ['Yes O No
5. Is there evidence of water ponding? ❑ Yes pi No
6. Is moisture present under roofing (leak)? ❑ Yes [i No
7. Is roof insulation existing? ❑ Yes [A No
8. Is roof insulation wet? ❑ Yes No
9. Property line setbacks on all sides > 10 feet [2 No
10. Roof Area pr< 6000 sq. ft ❑> 6000 sq. ft.
11. Building height ❑ < 2 Stones 0 > 2 Stones
12. Class of roof required ❑ Non -rated ❑ A. B. ❑ c.
13. Type roof deck . ithCombustible ❑ Non - Combustible
14. Roof drains ❑ Provided ❑ Required N Adequate
15. Overflow drains ❑ Provided ❑ Required ( I Adequate
16. Attic ventilation 5t Provided ❑ Required ❑ Adequate
17. Roof listing ❑ Provided (71 Required
18. Scope of work 0 Tear off ❑ Overlay
To re -roof this structure the following conditions must be met
^ L j / 11 J
%�
The re -roof proposal is 7 Approved for permit issuance if the conditions listed above are met. After obtaining your permit you must contact the
Building Division for an inspection when the roof deck is ready for the first inspection. The first inspection for a complete tear off is the deck
inspection. For a built -up roofing system (overlay), the first inspection is at the start of the job. After the re -roof is complete, a final inspection is
required.
'
Inspector Y'( '� s Ext. 2 z Y `� Da z V D
.-?--
IlBuddnplReroof Prenspecpon Report Form