Loading...
Permit CITY OF TIGARD REROOF PERMIT COMMUNITY DEVELOPMENT Permit #: RER2009 -00011 .T :I GARD 13125 SW Hall Blvd., Tigard OR 97223 503.639.4171 Date Issued: 09/15/2009 Parcel: 2S101 DD00800 Jurisdiction: Tigard Site address: 14020 SW 72ND AVE Subdivision: Lot: 0 Project: United Rentals Project Description: Tear -off and replace existing roofing. Owner: FEES IS PROPERTIES LP Description Date Amount BY UNITED RENTALS INC, EPROPERTY TAX, Permit Fee 09/15/2009 $226.95 PO BOX 4900 DEPT 160 12% State Surcharge - Building 09/15/2009 $27.23 PHONE: Contractor: MCDONALD & WETLE INC 2020 NE 194TH AVE PORTLAND, OR 97230 PHONE: 503 - 667 -0175 FAX: 503- 665 -0141 Specifics: Type of Use: COM Class of Work: OTR Type of Const: Occupancy Load: Stories: Height: 0 ft General Information Building Area: 0 Re -Roof Area: 0 Roof Class: Tear Off: Overlay: Existing Roof Layers: Parapets: Total $254.18 Required Items and Reports (Conditions) • This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will be done ' approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180 day • ENTION: Oregon requires yo • follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR 9 - 001 -0010 through OAR • 11 . 0100 •u may obtain a copy of the rules or direct questions to OUNC by calling 503.246.6699 or 1.800.32.2344. ssued By: // d� Permittee Signature: 9 �� / - v - c o — V Call 503.639.4175 by 7:00 a.m. for an inspection that tainess day. This permit card shall be kept in a conspicuous place on the job site until completion of the project Approved plans are required on the job site at the time of each inspection. Building Permit Application Re -Roof tEEI\/EfJ R eceived • I O11 O1..: 1 C I ( 1 ()Nix City of Tigard Date/B : ' ®D' (11.'� ' Permit No.: A _4 469 -Q60/ / ° 13125 SW Hall Blvd., Tigard, OR 9729E P 1 5 2009 Plan Review C Phone: 503.639.4171 Fax: 503.598.1960 D : Other Permit -I-1 G A R D Inspection Line: 503.639.4175 CITY OF TIGARD Date Ready/By: See Page 2 for Internet: www.tigard- or.gov BUILDING DIVISION Notified/Method: �� Sapplemeotal laformation TYPE OF WORK REQUIRED DATA: 1- AND 2- FAMILY DWELLING ❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed. Indicate the value (rounded to the nearest dollar) of all ® Addition/alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the' profit for the CATEGORY OF CONSTRUCTION work indicated on this application. ❑ 1- and 2- family dwelling ® Commercial/industrial Valuation: $ ❑ Accessory building ❑ Multi- family Number of bedrooms: ❑ Master builder ❑ Other Number of bathrooms: JOB SITE INFORMATION AND LOCATION Total number of floors: Job site address: 14020 SW 72nd. Ave. New dwelling area: square feet City /State /ZIP: Tigard, Or. Garage/carport area: square feet Suite/bldg. /apt. no.: I Project name: United Rental Shop Reroof Covered porch area: square feet Cross street/directions to job site: Deck area: square feet Other structure area: square feet REQUIRED DATA: COMMERCIAL -USE CHECKLIST Subdivision: I Lot no.: Permit fees' are based on the value of the work performed. Tax map /parcel no.: Indicate the value (rounded to the nearest dollar) of all equipment, materials, labor, overhead, and the profit for the DESCRIPTION OF WORK work indicated on this application. Remove & replace existing 4 ply built -up roofing Valuation: $$24,635.00 Existing building area: 9600 square feet New building area: square feet ® PROPERTY OWNER I ❑ TENANT Number of stories: 1 Name: Ascend Holdings Inc. Type of construction: concrete tilt Address: P.O. Box 87908 Occupancy groups: City/State/ZIP: Vancouver, Wa. 98687 Existing: Phone: (360)9432 Fax: (360)256 -0004 New: ® APPLICANT ❑ CONTACT PERSON NOTICE Business name: McDonald and Wetle, Inc. All contractors and subcontractors are required to be Contact name: George Starbuck licensed with the Oregon Construction Contractors Board under ORS 701 and may be required to be licensed in the Address: 2020 NE 194th jurisdiction in which work is being performed. If the City /State/ZIP: Portland, Or. 97230 applicant is exempt from licensing, the following reasons apply: Phone: (503) 667 -0175 1 Fax:: (503) 665-0141 E -mail: georges @mcdonaldwetle.com CONTRACTOR Business name: same as applicant above BUILDING PERMIT FEES* Address: (Pkase fie` to fee schedule) City/State/ZIP: Structural plan review fee (or deposit): Phone: ( ) I Fax: ( ) FLS plan review fee (if applicable): CCB tic.: 44680 c /14/4 Total fees due upon application: / /7 t / Amount received: a5C/ . /d Authorized signature: )( r C� "` ', This permit application expires if a permit is not obtained within 180 days after it has been accepted as complete. Print name: George Starbuck Date: 9 -10-09 • Fee methodology set by Tri-County Building Industry Service Board. I:\ Building \Permits'ROOF- PermitApp.doc 06/26/06 440- 4613T(I I /02/COM/WEB) City of Tigard Building Department : ; 13125 SW Hall Blvd., Tigard, OR 97223 Phone: (503) 639 -4171 9 '., Re-Roof Pre-inspection Report Form T�GARp; C' ��� r Requested by Job Address . 1 /AO '7 � Telephone I�0 1 —( —Z� Roof Access Location Date Requested 4' D - Type of Existing Roof �/ Time Requested 1. Slope of roof deck / foot Z % 2. RooflPenetrations/General Conditions ❑ Fair (ratio) 3. Are there blisters? �i Yes ❑ No 4. Are there cracks? 01! Yes ❑ No 5. Is there evidence of water poising? r2 Yes ❑ No 6. Is moisture present under roofing (leak)? 'es ❑ No 7. Is roof insulation existing? ❑ No 8. Is roof insulation wet? ❑ Yes l,? 0 9. Property line setbacks on all sides > 10 feet CAZaes , ❑No • 10. Roof Area ❑ < 6000 sq. ft P 6000 sq. ft 11. Building height � 10-54Stories ❑ > 2 Stories 12. Class of roof required ❑ Non -rated 13. Type roof deck ❑ B. ❑ Combustible Non-Combustible 14. Roof drains 15. Overflow drains Krovi ❑ Required ❑ Adequate '^ded ❑ Required ❑ Adequate 16. Attic ventilation rovided ❑ Required ❑Adequate 17. Roof listing Sgsgatitigd aRequired 18. Scope of work A Zpir ❑ Overlay To re -roof this structure the following conditions must be met _ y ,- 4 b< _1<__, / A The re -roof proposal VIApproved for permit issuance if the conditions listed above are met. After obtaining your permit ou must n Building Division for .. inspection when the roof deck is ready inspec tion. for the first ins . The first in you � tact the spection for a complete tear off is the deck inspection. For a b proofing system (overlay), the first inspection is at the start of the job. After the re -roof is complete, a final inspection is ' equired. ( , nspector ��// Ext. ___ Date 4 p l I'bulOng1Revoo( Pvems