Permit CITY OF TIGARD REROOF PERMIT
COMMUNITY DEVELOPMENT Permit #: RER2009 -00011
.T :I GARD 13125 SW Hall Blvd., Tigard OR 97223 503.639.4171 Date Issued: 09/15/2009
Parcel: 2S101 DD00800
Jurisdiction: Tigard
Site address: 14020 SW 72ND AVE
Subdivision: Lot: 0
Project: United Rentals
Project Description: Tear -off and replace existing roofing.
Owner: FEES
IS PROPERTIES LP Description Date Amount
BY UNITED RENTALS INC, EPROPERTY TAX, Permit Fee 09/15/2009 $226.95
PO BOX 4900 DEPT 160 12% State Surcharge - Building 09/15/2009 $27.23
PHONE:
Contractor:
MCDONALD & WETLE INC
2020 NE 194TH AVE
PORTLAND, OR 97230
PHONE: 503 - 667 -0175
FAX: 503- 665 -0141
Specifics:
Type of Use: COM
Class of Work: OTR Type of Const:
Occupancy Load:
Stories: Height: 0 ft
General Information
Building Area: 0
Re -Roof Area: 0
Roof Class:
Tear Off:
Overlay:
Existing Roof Layers:
Parapets:
Total $254.18
Required Items and Reports (Conditions)
•
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of OR. Specialty Codes and all other applicable law. All work will
be done ' approved plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended for more the 180
day • ENTION: Oregon requires yo • follow the rules adopted by the Oregon Utility Notification Center. Those rules are set forth in OAR
9 - 001 -0010 through OAR • 11 . 0100 •u may obtain a copy of the rules or direct questions to OUNC by calling 503.246.6699 or 1.800.32.2344.
ssued By: // d� Permittee Signature: 9 ��
/ - v - c o — V
Call 503.639.4175 by 7:00 a.m. for an inspection that tainess day.
This permit card shall be kept in a conspicuous place on the job site until completion of the project
Approved plans are required on the job site at the time of each inspection.
Building Permit Application
Re -Roof tEEI\/EfJ R eceived • I O11 O1..: 1 C I ( 1 ()Nix
City of Tigard Date/B : ' ®D' (11.'� ' Permit No.: A _4 469 -Q60/ /
° 13125 SW Hall Blvd., Tigard, OR 9729E P 1 5 2009 Plan Review
C Phone: 503.639.4171 Fax: 503.598.1960 D : Other Permit
-I-1 G A R D Inspection Line: 503.639.4175 CITY OF TIGARD Date Ready/By: See Page 2 for
Internet: www.tigard- or.gov BUILDING DIVISION Notified/Method: �� Sapplemeotal laformation
TYPE OF WORK REQUIRED DATA: 1- AND 2- FAMILY DWELLING
❑ New construction ❑ Demolition Permit fees* are based on the value of the work performed.
Indicate the value (rounded to the nearest dollar) of all
® Addition/alteration/replacement ❑ Other: equipment, materials, labor, overhead, and the' profit for the
CATEGORY OF CONSTRUCTION work indicated on this application.
❑ 1- and 2- family dwelling ® Commercial/industrial
Valuation: $
❑ Accessory building ❑ Multi- family Number of bedrooms:
❑ Master builder ❑ Other Number of bathrooms:
JOB SITE INFORMATION AND LOCATION Total number of floors:
Job site address: 14020 SW 72nd. Ave. New dwelling area: square feet
City /State /ZIP: Tigard, Or. Garage/carport area: square feet
Suite/bldg. /apt. no.: I Project name: United Rental Shop Reroof Covered porch area: square feet
Cross street/directions to job site: Deck area: square feet
Other structure area: square feet
REQUIRED DATA: COMMERCIAL -USE CHECKLIST
Subdivision: I Lot no.: Permit fees' are based on the value of the work performed.
Tax map /parcel no.: Indicate the value (rounded to the nearest dollar) of all
equipment, materials, labor, overhead, and the profit for the
DESCRIPTION OF WORK work indicated on this application.
Remove & replace existing 4 ply built -up roofing Valuation: $$24,635.00
Existing building area: 9600 square feet
New building area: square feet
® PROPERTY OWNER I ❑ TENANT Number of stories: 1
Name: Ascend Holdings Inc. Type of construction: concrete tilt
Address: P.O. Box 87908 Occupancy groups:
City/State/ZIP: Vancouver, Wa. 98687 Existing:
Phone: (360)9432 Fax: (360)256 -0004 New:
® APPLICANT ❑ CONTACT PERSON
NOTICE
Business name: McDonald and Wetle, Inc. All contractors and subcontractors are required to be
Contact name: George Starbuck licensed with the Oregon Construction Contractors Board
under ORS 701 and may be required to be licensed in the
Address: 2020 NE 194th jurisdiction in which work is being performed. If the
City /State/ZIP: Portland, Or. 97230 applicant is exempt from licensing, the following reasons
apply:
Phone: (503) 667 -0175
1 Fax:: (503) 665-0141
E -mail: georges @mcdonaldwetle.com
CONTRACTOR
Business name: same as applicant above BUILDING PERMIT FEES*
Address: (Pkase fie` to fee schedule)
City/State/ZIP: Structural plan review fee (or deposit):
Phone: ( ) I Fax: ( ) FLS plan review fee (if applicable):
CCB tic.: 44680 c /14/4 Total fees due upon application: / /7
t / Amount received: a5C/ . /d
Authorized signature: )( r C� "` ', This permit application expires if a permit is not obtained
within 180 days after it has been accepted as complete.
Print name: George Starbuck Date: 9 -10-09 • Fee methodology set by Tri-County Building Industry
Service Board.
I:\ Building \Permits'ROOF- PermitApp.doc 06/26/06 440- 4613T(I I /02/COM/WEB)
City of Tigard Building Department : ;
13125 SW Hall Blvd., Tigard, OR 97223 Phone: (503) 639 -4171 9 '.,
Re-Roof Pre-inspection Report Form
T�GARp;
C' ��� r
Requested by
Job Address . 1 /AO '7 � Telephone I�0 1 —( —Z�
Roof Access Location
Date Requested 4' D -
Type of Existing Roof �/ Time Requested
1. Slope of roof deck / foot Z %
2. RooflPenetrations/General Conditions ❑ Fair (ratio)
3. Are there blisters? �i Yes
❑ No
4. Are there cracks? 01! Yes
❑ No
5. Is there evidence of water poising? r2 Yes
❑ No
6. Is moisture present under roofing (leak)? 'es ❑ No
7. Is roof insulation existing? ❑ No
8. Is roof insulation wet? ❑ Yes l,?
0
9. Property line setbacks on all sides > 10 feet CAZaes , ❑No
•
10. Roof Area
❑ < 6000 sq. ft P 6000 sq. ft
11. Building height �
10-54Stories ❑ > 2 Stories
12. Class of roof
required ❑ Non -rated
13. Type roof deck ❑ B.
❑ Combustible Non-Combustible
14. Roof drains
15. Overflow drains Krovi ❑ Required ❑ Adequate
'^ded ❑ Required ❑ Adequate
16. Attic ventilation rovided
❑ Required ❑Adequate
17. Roof listing
Sgsgatitigd aRequired
18. Scope of work
A Zpir ❑ Overlay
To re -roof this structure the following conditions must be met
_ y
,- 4 b< _1<__, / A
The re -roof proposal VIApproved for permit issuance if the conditions listed above are met. After obtaining your permit ou must n
Building Division for .. inspection when the roof deck is ready inspec tion. for the first ins . The first in you � tact the
spection for a complete tear off is the deck
inspection. For a b proofing system (overlay), the first inspection is at the start of the job. After the re -roof is complete, a final inspection is
' equired. ( ,
nspector ��//
Ext. ___ Date 4 p l
I'bulOng1Revoo( Pvems