SETTING THE STANDARD FOR SERVICE EXCELLENCE
Facsimile
�..��
To: Jack Kriz
Company: Mildren Design Group Inc
Phone: 503- 244 -0552
Fax: 503- 244 -0417
From: Robert Poskin, CET, CBO, Senior Plans Examiner
Company: City of Tigard
Phone: (503) 639-4171 X 392
Fax: (503) 6847297
Date: April 16, 2001
Pages including this page: 1
Jack:
Under the provisions of UFC (TVFR) Section 1007.3.3.2, Control units, remote annunciator panels and access keys
shall be installed and maintained in an approved location. This section is govemed by the Fire Department
It is my understanding that both MKE Engineering and the Fire Alarm Contractor as of Friday when this was
brought to the Fire Departments attention had no problem in running the wire to the other location.
•
City of Tigard, 13125 SW Hall Blvd., Tigard, OR 97223
" PLEASE DELIVER THIS FAX IMMEDIATELY "
04/16/01 MON 12:10 FAX 503 244 0417 MILDREN DESIGN GROUP PC Z1001
. - •
7. 1 " 1.0.00 18 "'"---
■Ali r1/4/
MILDREN DESIGN GROUP, P.C. n
ARCHITECTURH • SPACE PLANNING / /) V
11830 SW Kerr Parkway, Suite 325
!
Lake Oswego, OR 97035
503/244-0552 Fax 244-0417
MEMO
To: City of Tigard /Tualatin Valley Fire & Rescue Date: April 16, 2001
Attention: Bob Poskin, City of Tigard
Eric McMullen, Tualatin lire & Rescue
Copy to: Craig Pierson, C. Schiewe & Associates, Inc. (CSA)„
Paul Gram, Pacific Northwest Properties
Hank Barleen, MKE
Jack Kriz, Mildren Design Group, P.C.(MDG)
Project Name: 72nd Avenue Office Building Project Number: 99095
Subject: Location of Fire Alarm Annunciation Panel and Area of Rescue Assistance Panels.
It has been brought to my attention that Tualatin Fire and Rescue is requesting the relocation of the above
mentioned panels although they were built per approved set of plans. I contacted Eric McMullen, TVFR
who informed me that he had contacted Bob Poskin, City of Tigard to follow up for this issue. He indicated
to me that "new construction" is under the jurisdiction of the City and that they, TVFR, only reviews plans
for Knox box and key locations, fire sprinklers and water. He indicated that if plans were approved by the
City with the current location as shown it would be the City's decision and he had no power to over ride.
I passed this information to Hank Barleen, Electrical Engineer, MKE. He contacted Bob Poskin. Hank
Barleen indicated to me that Bob Poskin had told him that this location conflict was not his jurisdiction.
As you know we are quickly approaching the date where the tenant is expecting to move in to the building.
Time is of essence for a decision to be made. And, moving these panels at this stage are expensive. It is in
our opinion that these panels should be left where they are as indicated on the approved set of plans to
expedite the completion of the building for occupancy. Please call me to discuss options.
Thank you.
Signed: Jack Kriz
P: \99099\ WP \ memo.4.wpd