Report (733) Feb -14 -01 02:33P P_03 %"--U es c� SCHIRMER ENGINEERING CORPORATION 117/0 BERNARDO PLAF4 COURT. SUITE 116 • SAN DIECx7. CA 92728 £ PHONE (858) 673 -5645 • rAX (65BJ 673 -5849 LOWE'S — TIGARD, OR • Acceptance Test Criteria For Smoke Removal System The acceptance test of the smoke removal system will confirm proper system activation and operation. This is accomplished through a combination of visual inspection of smoke removal system components and testing of the system operation to design parameters. The following inspections and tests will be made for proper confirmation: A. Visual Inspection A visual inspection of all working components of the smoke removal system will be conducted. Nameplate data and other pertinent information will be gathered and compared to the approved design. Any deviations from the original design will be noted and explained in detail. B. Activation of System The smoke removal system will be activated to test all appropriate smoke removal system components. The system will be activated manually through the use of the fire fighters control panel. In addition, the applicable smoke control equipment will be checked to verify proper operation. C. Fans Fans will be visually examined for proper rotation. Measurement of voltage, amperage, revolutions per minute, belt tension, and flow rate of fans will be performed by a certified test and balance company. Flow rate of fans are to be made with all perimeter doors closed except designated make -up air doors. D. Emergency Power A test will be conducted simulating the loss of primary power to the smoke removal system. R will be confirmed that the system can run under full emergency power for a minimum of 20 minutes and transfer to full standby power will occur within 60 seconds of failure of primary power. E. Report Schirmer Engineering Corporation will prepare a complete smoke removal report of testing. The report will include identification of all devices by manufacturer nameplate data, design values, measured values and identification tag or mark. Fire Protection Engineering • Code Consulting • Loss Control • Security Consulting