Loading...
Plans (717) & e(_) Worksheet 5a Project: 98088 triangle Page: 1 LIGHTING SCHEDULE 05/04/98 I 1 1 1 I 1 I (a) (b) (c) (d) (e) (f) Lamp Ballast Tab Lum. Fixture 1 1 Luminaire 5b ID Description No. Description No. Descript. Power "x" A Fluorescent surface 3 F32T8 1.0 ELECT 93 x - C Recessed downlight 2 CFQ26W /GX24d -3 2.0 ELECT 277V 54 x Cl Recessed downlight 2 CFQ26W /GX24d -3 2.0 ELECT 277V 54 x D Recessed downlight 1 MH250 1.0 Magnetic 295 x D1 Recessed downlight 1 MH250 1.0 Magnetic 295 x E Recessed downlight 1 Q50MR16(12V) 1.0 Electroni 55 x K Fluorescent surface 2 F32T8 1.0 ELECT 62 x L Fluorescent surface 4 F32T8 2.0 ELECT 124 x f L1 Fluorescent surface 2 F32T8 1.0 ELECT 62 x M Fluorescent surface 2 F32T8 1.0 ELECT 62 x Mi Fluorescent surface 1 F32T8 1.0 ELECT 32 x 1 N Fluorescent surface 2 F32T8 1.0 ELECT 62 x T Fluorescent surface 1 CFT13W /G23 1.0 MAG STD 18 1 U Wall mount (sconce) 1 CFQ26W /GX24d -3 1.O ELECT 277V 27 x - V Fluorescent surface 2 F32T8 1.O ELECT 62 x W Fluorescent suspended 4 CFT27W /G23 2.0 ELECTRONI 120 W1 Fluorescent suspended 4 CFQ26W /GX24d -3 2.0 ELECT 277V 108 1- 7 1 1 1 1 1 1 1 1 i Form 5b Project: 98088 triangle Page: 1 INTERIOR LIGHTING POWER - Occupancy Method 05/04/98 1 I 1 1 7 Retail or (a) (b) (c) (d) (e) (f) (g) Merchan Max Lighting dise Floor Power Power Lighting Area Allow. Budget Power Group Area (ft2) (W /ft2) (c -d) x e + f (Group M) - If area is less than 2,000 ft2, enter 0 0 3.4 0 0 area in (c) If area is between 2,000 and 6,000 ft2 2,000 2.5 6,800 - enter area in (c) If area over 6,000 ft2, enter 6,000 1.7 16,800 area in (c) 1 1 1 1 1 1 1 I 1 1 1 1 1 1 1 I Uses (a) (b) (c) (d) (e) (f) (g) Other Max Lighting Than Ceiling Floor Power Power Group M Height Area Allow. Budget Power Group Occupancy Use (ft2) (W /ft2) (c -d) x e + f (Group M) B OFFICES underl5 25,377 1.2 30,452 1 1 1 1 1. Total Interior Lighting Power Budget (W). 30,452 1 1 I 1 I 1 2. Sum the page total(s) from Worksheet 5b 24,076 1 3. Total lineal feet of track lighting 0 1 4. Multiply line 3 by 50 0 5. Total Interior Lighting Power (line 2 and 4) 24,076 6. Total Control Credit from Worksheet 5c • 0 7. Total Adjusted Lighting Power (W) (line 6 - 5) 24,076 8. Does design meet the budget? Otherwise redesign Yes 1 I I Worksheet 5b Project: 98088 triangle Page: 1 INTERIOR LIGHTING POWER 05/04/98 I i 1 T (a) (b) (c) (d) 1 (e) (f) Lighting Room or Room or Plans Luminaire Quantity of Luminaire Power Sheet No. Designation ID Luminaires Power (d) x (e) 1ST FLOOR C 19 54 1,026 - 1ST FLOOR D 5 295 1,475 - 1ST FLOOR D1 10 295 2,950 1ST FLOOR E 0 55 0 1ST FLOOR K 4 62 248 1ST FLOOR L 1 124 124 1ST FLOOR M 2 62 124 1ST FLOOR T 5 18 90 1ST FLOOR U 4 27 108 1ST FLOOR W1 2 108 216 2ND FLOOR C 17 54 918 2ND FLOOR D 12 295 3,540 2ND FLOOR D1 4 295 1,180 2ND FLOOR E 1 55 55 2ND FLOOR K 4 62 248 2ND FLOOR L 1 124 124 2ND FLOOR M 1 62 62 2ND FLOOR T 3 18 54 2ND FLOOR U 4 27 108 2ND FLOOR W 2 120 240 2ND FLOOR W1 2 108 216 3RD FLOOR 0 ? ?? ? ?? 3RD FLOOR C 16 54 864 3RD FLOOR E 2 55 110 1 1 1 1 1. Page Total. Sum the amounts in column (f) 14,296 1 1 1 Worksheet 5b Project: 98088 triangle Page: 1 INTERIOR LIGHTING POWER 05/04/98 3RD FLOOR K 4 62 248 3RD FLOOR L 1 124 124 3RD FLOOR M 1 62 62 3RD FLOOR T 1 18 18 3RD FLOOR U 4 27 108 4TH FLOOR 0 ? ?? ? ?? 1 4TH FLOOR C 16 54 864 4TH FLOOR E 2 55 110 4TH FLOOR K 4 62 248 1- 4TH FLOOR L 1 124 124 4TH FLOOR M 1 62 62 4TH FLOOR T 1 18 18 • 4TH FLOOR U 4 27 108 } 5TH FLOOR C 0 54 0 { 5TH FLOOR { E 2 55 110 { 5TH FLOOR K 4 62 248 1 5TH FLOOR L 1 124 124 5TH FLOOR { M 1 62 62 - 5TH FLOOR T 1 18 18 1 5TH FLOOR { U 4 27 108 { BASEMENT A 8 93 744 1 BASEMENT C 18 54 972 1 BASEMENT C1 4 54 216 1 BASEMENT K I 4 62 248 { BASEMENT L 1 26 124 3,224 BASEMENT Li 1 1 62 62 1 1 1. Page Total. Sum the amounts in column (f) 8,338 I Worksheet 5b Project: 98088 triangle Page: 1 INTERIOR LIGHTING POWER 05/04/98 BASEMENT M 25 62 1,550 BASEMENT U 8 27 216 PENTHOUSE N 0 62 0 1 } 1 1 1 1 1. Page Total. Sum the amounts in column (f) 1,766