Worksheet 5a Project: 98088 triangle Page: 1
LIGHTING SCHEDULE 05/04/98
I 1 1 1 I 1 I
(a) (b) (c) (d) (e) (f)
Lamp Ballast Tab
Lum. Fixture 1 1 Luminaire 5b
ID Description No. Description No. Descript. Power "x"
A Fluorescent surface 3 F32T8 1.0 ELECT 93 x -
C Recessed downlight 2 CFQ26W /GX24d -3 2.0 ELECT 277V 54 x
Cl Recessed downlight 2 CFQ26W /GX24d -3 2.0 ELECT 277V 54 x
D Recessed downlight 1 MH250 1.0 Magnetic 295 x
D1 Recessed downlight 1 MH250 1.0 Magnetic 295 x
E Recessed downlight 1 Q50MR16(12V) 1.0 Electroni 55 x
K Fluorescent surface 2 F32T8 1.0 ELECT 62 x
L Fluorescent surface 4 F32T8 2.0 ELECT 124 x
f
L1 Fluorescent surface 2 F32T8 1.0 ELECT 62 x
M Fluorescent surface 2 F32T8 1.0 ELECT 62 x
Mi Fluorescent surface 1 F32T8 1.0 ELECT 32 x
1
N Fluorescent surface 2 F32T8 1.0 ELECT 62 x
T Fluorescent surface 1 CFT13W /G23 1.0 MAG STD 18
1
U Wall mount (sconce) 1 CFQ26W /GX24d -3 1.O ELECT 277V 27 x
- V Fluorescent surface 2 F32T8 1.O ELECT 62 x
W Fluorescent suspended 4 CFT27W /G23 2.0 ELECTRONI 120
W1 Fluorescent suspended 4 CFQ26W /GX24d -3 2.0 ELECT 277V 108
1-
7
1
1 1 1 1 1 1 1 i
Form 5b Project: 98088 triangle Page: 1
INTERIOR LIGHTING POWER - Occupancy Method 05/04/98
1 I 1 1 7
Retail or (a) (b) (c) (d) (e) (f) (g)
Merchan Max Lighting
dise Floor Power Power
Lighting Area Allow. Budget
Power Group Area (ft2) (W /ft2) (c -d) x e + f
(Group M) -
If area is less than
2,000 ft2, enter 0 0 3.4 0 0
area in (c)
If area is between
2,000 and 6,000 ft2 2,000 2.5 6,800
- enter area in (c)
If area over
6,000 ft2, enter 6,000 1.7 16,800
area in (c)
1 1 1 1 1 1 1 I
1 1 1 1 1 1 1 I
Uses (a) (b) (c) (d) (e) (f) (g)
Other Max Lighting
Than Ceiling Floor Power Power
Group M Height Area Allow. Budget
Power Group Occupancy Use (ft2) (W /ft2) (c -d) x e + f
(Group M)
B OFFICES underl5 25,377 1.2 30,452
1 1 1 1
1. Total Interior Lighting Power Budget (W). 30,452
1 1 I
1 I 1
2. Sum the page total(s) from Worksheet 5b 24,076
1
3. Total lineal feet of track lighting 0
1
4. Multiply line 3 by 50 0
5. Total Interior Lighting Power (line 2 and 4) 24,076
6. Total Control Credit from Worksheet 5c • 0
7. Total Adjusted Lighting Power (W) (line 6 - 5) 24,076
8. Does design meet the budget? Otherwise redesign Yes
1 I I
Worksheet 5b Project: 98088 triangle Page: 1
INTERIOR LIGHTING POWER 05/04/98
I i
1 T
(a) (b) (c) (d) 1 (e) (f)
Lighting
Room or Room or Plans Luminaire Quantity of Luminaire Power
Sheet No. Designation ID Luminaires Power (d) x (e)
1ST FLOOR C 19 54 1,026 -
1ST FLOOR D 5 295 1,475
- 1ST FLOOR D1 10 295 2,950
1ST FLOOR E 0 55 0
1ST FLOOR K 4 62 248
1ST FLOOR L 1 124 124
1ST FLOOR M 2 62 124
1ST FLOOR T 5 18 90
1ST FLOOR U 4 27 108
1ST FLOOR W1 2 108 216
2ND FLOOR C 17 54 918
2ND FLOOR D 12 295 3,540
2ND FLOOR D1 4 295 1,180
2ND FLOOR E 1 55 55
2ND FLOOR K 4 62 248
2ND FLOOR L 1 124 124
2ND FLOOR M 1 62 62
2ND FLOOR T 3 18 54
2ND FLOOR U 4 27 108
2ND FLOOR W 2 120 240
2ND FLOOR W1 2 108 216
3RD FLOOR 0 ? ?? ? ??
3RD FLOOR C 16 54 864
3RD FLOOR E 2 55 110
1 1 1 1
1. Page Total. Sum the amounts in column (f) 14,296
1 1
1
Worksheet 5b Project: 98088 triangle Page: 1
INTERIOR LIGHTING POWER 05/04/98
3RD FLOOR K 4 62 248
3RD FLOOR L 1 124 124
3RD FLOOR M 1 62 62
3RD FLOOR T 1 18 18
3RD FLOOR U 4 27 108
4TH FLOOR 0 ? ?? ? ??
1
4TH FLOOR C 16 54 864
4TH FLOOR E 2 55 110
4TH FLOOR K 4 62 248
1-
4TH FLOOR L 1 124 124
4TH FLOOR M 1 62 62
4TH FLOOR T 1 18 18
• 4TH FLOOR U 4 27 108
}
5TH FLOOR C 0 54 0
{
5TH FLOOR { E 2 55 110
{
5TH FLOOR K 4 62 248
1
5TH FLOOR L 1 124 124
5TH FLOOR { M 1 62 62
- 5TH FLOOR T 1 18 18
1
5TH FLOOR { U 4 27 108
{
BASEMENT A 8 93 744
1
BASEMENT C 18 54 972
1
BASEMENT C1 4 54 216
1
BASEMENT K I 4 62 248
{
BASEMENT L 1 26 124 3,224
BASEMENT Li 1 1 62 62
1 1
1. Page Total. Sum the amounts in column (f) 8,338
I
Worksheet 5b Project: 98088 triangle Page: 1
INTERIOR LIGHTING POWER 05/04/98
BASEMENT M 25 62 1,550
BASEMENT U 8 27 216
PENTHOUSE N 0 62 0
1
}
1 1 1 1
1. Page Total. Sum the amounts in column (f) 1,766