Plans (222) 60pgsf— c,5
Form 2a Project: TRIANGLE OFFICE 3 Page: 1
SUMMARY 05/07/1998
I � I
PROJECT 1. Project name TRIANGLE OFFICE 3
2. Address
3. City /town TIGARD
4. Building Area (ft2) 134,317
5. County Washington
6. Number of floors 6
I i I
Chapter Type I.D. Description Attached
ATTACHED Building Form 3a Envelope -- General [ ]
3b Prescriptive Path -Zone 1 [ ]
FORMS AND 3c Prescriptive Path -Zone 2 [ ]
3d Simplified Trade -off [V]
WORKSHEETS Envelope
Worksheet 3a Wall U- values (V]
3b Roof U- values [✓1
3c Floor U- values [ ]
Systems Form 4a Systems -- General [
Form 4b Complex Systems (✓]
Worksheet 4a Unitary Air Conditioner - -Air Cooled l✓]
4b Unitary Air Conditioner - -Water Cooled [ ]
4c Unitary Heat Pump - -Air Cooled [ ]
4d Unitary Heat Pump - -Water Cooled [ 1
4e Unitary AC & Heat Pump -- Evaporatively Cooled [ ]
4f Packaged Terminal AC - -Air Cooled [ 1
4g Packaged Terminal Heat Pump - -Air Cooled [ ]
4h Water Chilling Packages - -Water & Air Cooled [ ]
4i Boilers -- Gas -Fired and Oil -Fired [ l
4j Furnaces & Unit Heaters - -Gas- and Oil -Fired [
Lighting Form 5a Lighting -- General [ ✓l
5b Interior Lighting Power -- Occupancy [✓]
5c Interior Lighting Power - -Space [ ]
Worksheet 5a Lighting Schedule [✓]
5b Interior Lighting Power 111
5c Interior Control Credits [ ]
I 1 1
APPLICANTS 7. Name 1 10.Telephone 1( ) -
1 1 1
1 8. Company 1 11. Date 1 / /
1 1
1 9. Signature 1
1 1 I
Worksheet 3a Project: TRIANGLE OFFICE 3 Page: 1
WALL U- FACTORS 05/07/1998
6" precast 2x4 metl R -13
1 1 1
(a) (b) (c) (d)
Layer Description Detail R -Value
EXT 15 mph Air to Surface 0.17
A Concrete -light wt aggregate 6" thick, 114 lbs /cu.ft. 1.32
B Walls - Air Space 3/4" 0.94
C Metal Studs, 2X4 24" o.c. R -13 INS 7.20
• D Gypsum wallboard (drywall) 5/8" 0.50
INT Still Air to Wall 0.68
1 1
1. Total Column (d) 10.81
2. U- factor. Invert the amount in line 1 0.093
� I
Frame Wall w/ R -19 insul.
1 I 1
•
(a) (b) (c) (d)
Layer Description Detail R -Value
EXT 15 mph Air to Surface 0.17
A Face brick 4" solid 0.80
B Walls - Air Space 3/4" 0.94
C Plywood, Douglas fir 5/8" 0.77
D Metal Studs, 2X6 16" o.c. R -19 INS 7.10
E Gypsum wallboard (drywall) 5/8" 0.50
INT Still Air to Wall 0.68
l 1
1. Total Column (d) 10.96
2. U- factor. Invert the amount in line 1 0.091
I � I
Worksheet 3a (continued) Project: TRIANGLE OFFICE 3 Page: 2
WALL U- FACTORS 05/07/1998
SPANDREL
I 1 1 I
(a) (b) (c) (d)
Layer Description Detail R -Value
EXT 15 mph Air to face 0.17
A Mineral fiber batt insul. o 4" batt 9.20
INT Still Air to Wal 0.68
1 1
1. Total Coluil- d) 10.05
2. - actor. Invert the amount in line 1 0.100
1 I
spandrel glazing
I 1 1 1 I
(a) (b) (c) (d)
Layer Description Detail R -Value
EXT 15 mph Air to Surface 0.17
A Spandrel glass 0.07
B Walls - Air Space 1/2" 0.94
C Spandrel glass 0.07
D Walls - Air Space 3 -1/2" 0.91
E Metal Studs, 2X4 16" o.c. R -13 INS 6.00
F Gypsum wallboard (drywall) 5/8" 0.50
INT Still Air to Wall 0.68
_ I t
1. Total Column (d) 9.34
2. U- factor. Invert the amount in line 1 0.107
I 1 I
Worksheet 3b Project: TRIANGLE OFFICE 3 Page: 1
ROOF U- FACTORS 05/07/1998
built up w/ rigid insul
1 1 1 1 I
(a) (b) (c) (d)
Layer Description Detail R -Value
EXT 15 mph Air to Surface 0.17
A Built -up roofing 3/8" 0.33
B Plywood, Douglas fir 5/8" 0.77
C Rigid insulation polyisocyanurate 19.00
D metal deck 0.00
INT Still Air to Ceiling 0.61
1 1
1. Total Column (d) 20.88
2. U- factor. Invert the amount in line 1 0.048
I 1
Form 3d Project: TRIANGLE OFFICE 3 Page: 1
STA GENERAL (Calculations) 05/07/1998
I 1 I
1. Conditioned Floor Area (sq ft) 134,317.0
1
2. Does this project contain any mass walls? N
(Walls weighing greater than 50 lbs /sq ft)
3. Number of Floors above grade in building 5
4. Number of Floors below grade in building 1
5. Floor to ceiling height, ft
(applies only to single -story buildings)
6. Is this a highrise building with identical middle floors
6a. How many floors are identical
6b. Floor that is duplicated
Exceptions and special conditions
7. Does this building contain more than one occupancy?
7a. Occupancy Group (if only one occupancy /description) B
7b. Description: Offices
8. Does this building contain coil -type rollup doors?
9. Does this building contain merchandise glazing?
10. Does this building contain opaque smoke vents?
I �
FLOOR AREA AND CEILING HEIGHT
I 1 I 1
(a) (b) (c)
Floor Floor Area Ceiling Height
No (sf) (ft)
1 23,463 13.50
2 24,037 13.50
3 24,512 13.50
4 24,512 13.50
5 24,512 16.00
-1 13,281 12.00
1. Total Area 134,317
2. Total Volume 1,854,638
I 1 1
Form 3d (continued) Project: TRIANGLE OFFICE 3 Page: 2
STA GENERAL (Calculations) 05/07/1998
Simplified Trade -off Approach (STA) Calculation Results
t i t
1. STA Project Name TRIANGLE OFFICE 3
2. STA Weather Zone 1
3. STA Run Date 05/04/1998
4. STA Run Time 11:57:18
5. STA Software Version Number 3.02c
6. STA Verification Signature I c1f3d808 4df258fe 5beac890 b4lbbffc d20b9f0
Load Baseline Design
7. Cooling 3,250.0 3,203.4 1 PASS
8. Heating 1,685.8 1,675.6 1 PASS
I � I
Form 3e Project: TRIANGLE OFFICE 3 Page: 1
GLAZING DESCRIPTIONS 05/07/1998
1 1 1 1 1 1 1 1 1
(a) (b) (c) (d) (e) (f) (g) (h)
Type Description Frame Air Spacer U Shade From
Type Space Material factor coeff Table
G E, S, N Double pane glas Alum w /tb 1/2" insul 0.440 0.35
G west side glass Alum w /tb 1/2" Insul 0.540 0.52
1 1 1 1 1 1 1 1
Form 3g Project: TRIANGLE OFFICE 3 Page: 1
WALLS, WINDOWS, DOORS, AND OPENINGS 05/07/1998
East Elevation
► ► ► ► ► 1 ► ►
M Ins
(a) a L (b) (c) (d) (e) (f) (g) (h) (i)
Type s o Component Name Floor Area U Mass Shading Work
s c (sf) factor # /sf coef Modl shet
► ► _
G E, S, N Double pane glas 1 1,405 0.440 0.35 Y
W 6" precast 2x4 metl R -13 1 1,684 0.093 59
W spandrel glazing 1 340 0.107 2
G E, S, N Double pane glas 2 1,405 0.440 0.35 Y
W 6" precast 2x4 metl R -13 2 670 0.093 59
W Frame Wall w/ R -19 insul. 2 1,014 0.091 30 Y
W spandrel glazing 2 340 0.107 2
G E, S, N Double pane glas 3 1,389 0.440 0.35 Y
W Frame Wall w/ R -19 insul. 3 1,432 0.091 30 Y
W spandrel glazing 3 608 0.107 2
G E, S, N Double pane glas 4 1,389 0.440 0.35 Y
W Frame Wall w/ R -19 insul. 4 1,432 0.091 30 Y
W spandrel glazing 4 608 0.107 2
G E, S, N Double pane glas 5 1,486 0.440 0.35 Y
W Frame Wall w/ R -19 insul. 5 1,873 0.091 30 Y
W spandrel glazing 5 705 0.107 2
1 1 1 1 1
1. Total Area (sf) 17,780
2. Average U- factor 0.232
3. Average Shading Coefficient (Glass) 0.35
4. Percent Glass 39.78
1 ► ► 1 1 I
Warning: 2 non - MassWall entries had a weight >= 50 # /ft2
Form 3g (continued) Project: TRIANGLE OFFICE 3 Page: 2
WALLS, WINDOWS, DOORS, AND OPENINGS 05/07/1998
North Elevation
1 I 1 1 1 1 1
M Ins
(a) a L (b) (c) (d) (e) (f) (g) (h) (i)
Type s o Component Name Floor Area U Mass Shading Work
s c (sf) factor # /sf coef Modl shet
1 1 1 -
G E, S, N Double pane glas 1 611 0.440 0.35 Y
W 6" precast 2x4 metl R -13 1 759 0.093 59
W spandrel glazing 1 41 0.107 2
G E, S, N Double pane glas 2 604 0.440 0.35 Y
W 6" precast 2x4 metl R -13 2 95 0.093 59
W Frame Wall w/ R -19 insul. 2 582 0.091 30 Y
W spandrel glazing 2 238 0.107 2
G E, S, N Double pane glas 3 636 0.440 0.35 Y
W Frame Wall w/ R -19 insul. 3 537 0.091 30 Y
W spandrel glazing 3 238 0.107 2
G E, S, N Double pane glas 4 636 0.440 0.35 Y
W Frame Wall w/ R -19 insul. 4 537 0.091 30 Y
W spandrel glazing 4 238 0.107 2
G E, S, N Double pane glas 5 636 0.440 0.35 Y
W Frame Wall w/ R -19 insul. 5 728 0.091 30 Y
- W spandrel glazing 5 308 0.107 2
1 1 1 1 1
1. Total Area (sf) 7,424
2. Average U- factor 0.240
3. Average Shading Coefficient (Glass) 0.35
4. Percent Glass 42.06
1 1 1 1 1
Warning: 2 non - MassWall entries had a weight >= 50 # /ft2
Form 3g (continued) Project: TRIANGLE OFFICE 3 Page: 3
WALLS, WINDOWS, DOORS, AND OPENINGS 05/07/1998
South Elevation
i 1 1 1 1 1 1 I
M Ins
(a) a L (b) (c) (d) (e) (f) (g) (h) (i)
Type s o Component Name Floor Area U Mass Shading Work
s c (sf) factor # /sf coef Modl shet
1 1 1
G E, S, N Double pane glas 1 611 0.440 0.35 Y
W 6" precast 2x4 metl R -13 1 759 0.093 59
W spandrel glazing 1 41 0.107 2
G E, S, N Double pane glas 2 604 0.440 0.35 Y
W 6" precast 2x4 metl R -13 2 95 0.093 59
W Frame Wall w/ R -19 insul. 2 582 0.091 30 Y
W spandrel glazing 2 238 0.107 2
G E, S, N Double pane glas 3 636 0.440 0.35 Y
W Frame Wall w/ R -19 insul. 3 537 0.091 30 Y
W spandrel glazing 3 238 0.107 2
G E, S, N Double pane glas 4 636 0.440 4 0.35 Y
W Frame Wall w/ R -19 insul. 4 537 0.091 30 Y
W spandrel glazing 4 238 0.107 2
}
G E, S, N Double pane glas 5 636 0.440 0.35 Y
W Frame Wall w/ R -19 insul. 5 728 0.091 30 Y
- W spandrel glazing 5 308 0.107 2
}
, 1 1 1 1
1. Total Area (sf) 7,424
2. Average U- factor 0.240
3. Average Shading Coefficient (Glass) 0.35
4. Percent Glass 42.06
1 1 1 1 1 1
Warning: 2 non - MassWall entries had a weight >= 50 # /ft2
Form 3g (continued) Project: TRIANGLE OFFICE 3 Page: 4
WALLS, WINDOWS, DOORS, AND OPENINGS 05/07/1998
West Elevation
1 1 1 1 1 1
M Ins
(a) a L (b) (c) (d) (e) (f) (g) (h) (i)
Type s o Component Name Floor Area U Mass Shading Work
s c (sf) factor # /sf coef Modl shet
1 -
G west side glass 1 2,117 0.540 0.52 Y
W 6" precast 2x4 metl R -13 1 1,244 0.093 59
W spandrel glazing 1 68 0.107 2
G west side glass 2 1,316 0.540 0.52 Y
W 6" precast 2x4 metl R -13 2 1,049 0.093 59
W Frame Wall w/ R -19 insul. 2 720 0.091 30 Y
W spandrel glazing 2 344 0.107 2
G west side glass 3 1,389 0.540 0.52 Y
W Frame Wall w/ R -19 insul. 3 1,432 0.091 30 Y
W spandrel glazing 3 608 0.107 2
G west side glass 4 1,389 0.540 0.52 Y
W Frame Wall w/ R -19 insul. 4 1,432 0.091 30 Y
W spandrel glazing 4 608 0.107 2
G west side glass 5 1,486 0.540 0.52 Y
W Frame Wall w/ R -19 insul. 5 1,873 0.091 30 Y
- W spandrel glazing 5 705 0.107 2
1
1 1 1 1 1
1. Total Area (sf) 17,780
2. Average U- factor 0.288
3. Average Shading Coefficient (Glass) 0.52
4. Percent Glass 43.29
I i 1 1 1 1 I
Warning: 2 non - MassWall entries had a weight >= 50 # /ft2
Form 3g (continued) Project: TRIANGLE OFFICE 3 Page: 5
WALLS, WINDOWS, DOORS, AND OPENINGS 05/07/1998
;
North Elevation: WALL Summary
i 1 1 1 1
Total Average Average Percent
Type Description Area U Shade of
(sf) factor Coeff Area
W Opaque Walls (Masonry and Frame) 4,301 0.095 57.93
G Windows 3,123 0.440 0.35 42.06
Total for all Wall Components 7,424 0.240 0.35
East Elevation: WALL Summary
Total Average Average Percent
Type Description Area U Shade of
(sf) factor Coeff Area
W Opaque Walls (Masonry and Frame) 10,706 0.095 60.21
G Windows 7,074 0.440 0.35 39.78
Total for all Wall Components 17,780 0.232 0.35
I 1 1 1
South Elevation: WALL Summary
1 i 1
Total Average Average Percent
_ Type Description Area U Shade of
(sf) factor Coeff Area
- W Opaque Walls (Masonry and Frame) 4,301 0.095 57.93
G Windows 3,123 0.440 0.35 42.06
Total for all Wall Components 7,424 0.240 0.35
Form 3g (continued) Project: TRIANGLE OFFICE 3 Page: 6
WALLS, WINDOWS, DOORS, AND OPENINGS 05/07/1998
West Elevation: WALL Summary
1 1 1 1 1 1 I
Total Average Average Percent
Type Description Area U Shade of
(sf) factor Coeff Area
W Opaque Walls (Masonry and Frame) 10,083 0.095 56.71
G Windows 7,697 0.540 0.52 43.29
1 1
Total for all Wall Components 17,780 0.288 0.52
1 1 1 1 1
Total WALL Summary (all orientations)
1 1 1 1 1 1 I
Total Average Average Percent
Type Description Area U Shade of
(sf) factor Coeff Area
W Opaque Walls (Masonry and Frame) 29,391 0.095 58.30
G Windows 21,017 0.477 0.41 41.69
1 1
Total for all Wall Components 50,408 0.254 0.41
1 1 1 1 I
Warning: No opaque or glazed entry /exit door entries were found in Form 3g
Form 3h Project: TRIANGLE OFFICE 3 Page: 1
WALLS BELOW GRADE 05/07/1998
1 1 I I 1 1
(a) (b) (c) (d) (e) (f)
Component Name Floor Area U Mass Work
or Description (sf) factor ( # /sf) 3a
basement wall -1 5,724 0.095 98 Y
I 1
1. Total Area (sf) 5,724
2. Average U- factor 0.095
•
Form 3i Project: TRIANGLE OFFICE 3 Page: 1
ROOFS AND SKYLIGHTS 05/07/1998
1 1 1
(a) (b) (c) (d) (e) (f) (g) (h) (i)
Component Name Type Floor Orient Tilt Area U Shade Work
(sf) factor coeff sheet
built up w/ rigid insul R 5 24,512 0.048 Y
1 1 1 1
1. Total Area (sf) 24,512
2. Average U- factor 0.048
I i i i I
ROOF Summary
I 1 I 1 1
Total Average Average Percent
Type Description Area U Shade of
(sf) factor Coeff Area
R Opaque Roofs 24,512 0.048 100.00
i 1
Total for all Roof Components 24,512 0.048
1 1 1 1 i
Form 3j Project: TRIANGLE OFFICE 3 Page: 1
FLOORS OVER UNHEATED SPACE AND SLAB EDGE 05/07/1998
1 1 1 1 r 1 1 1 I
(a) (b) (c) (d) (e) (f) (g) (h)
Component Name Type Floor Area U Length R Work
(sf) factor (ft) value sheet
slab perimeter no insulation E 1 710 0.00
1 1
3. Total Slab Perimeter Edge (feet) 710.0
4. Average Slab Perimeter R -value 0.00
1 1 1 1 1 1 1
FLOOR Summary
Total lAverage l Total lAveragel
Type' Description Area U Length R
(sf) 1 factors (1f) 1 value 1
E 1 Perimeter Slab Edge ` 710.01
1 1 1 1 1 1