Bob, Thank you for meeting with representatives from Lowes HIW, JUB Eng.,
Continental Dirt Contr., Baugh Constr. OR and myself @ the Lowes HIW job
site on 12.13.00 at 10:30am. We discussed the landscape sheet flow at the
westerly PL were it meets Beveland Street and the adjacent property owner.
Per our meeting conversation/conclusion, I have instructed our Civil Eng.
(JUB Eng.) to provide drainage plan which would include the following:
1). ADD /INSTALL, 1- catch basin on Lowes' property that will tie into the
existing storm system.
2). CONSTRUCT, a landscape "V" ditch 1"-0" from the PL (on Lowes property)
at the southern portion of the of the westerly PL, that will provide a
positive flow in a northerly direction that will terminate into the proposed
catch basin (see item #1).
3). Finally, All site grading as needed to accomplish this proposal will
not exceed a 2:1 slope and will be hydro seeded and protected with jute
matting as needed.
This proposed grading plan will be forwarded to you for approval ASAP.
Thank you again for your prompt attention to resolve this matter.
Jim Bryan