Report (22) Page No. 2 CASE HISTORY FOR CASE NO.: BUP97 -0225
MCDONALDS CORPORATION
11201 SW 72ND AVE
02/12/98
Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
BUPC760 Gyp Board Inap 07/01/97 / / 09/29/97 1. Three one -hour shafts, not fire -rated PASS KS 09/29/97 J *H
at this time. 2. This inspection also
includes last interior shear walls, B &
E.
BUPC762 Susp Ceilng Insp / / / / 10/13/97 Conditonal approval: Electrical cover to COND TLP 10/14/97 J *H
be approved.
BUPC790 Appr /sdwlk Inap 07/01/97 / / / / 07/01/97 RDP
BUPC792 Misc. Inspection 07/01/97 / / / / 07/01/97 RDP
BUPC802 Final Inspection 07/01/97 / / 10/28/97 Needs special reports as on permit (to PASS TLP 02/11/98 JT
be sent within 5- days).
AS PER TOM PLESCHERS INSTRUCTIONS, THIS
DATE "I AM FINISHED WITH THIS PROJECT"
CONCRETE REPORT RECEIVED 2/10/98
I CHANGED "FAIL" TO "PASS" THIS DATE PER
TOM'S INSTRUCTIONS.
2/10/98 TO JILL
BUPC950 (F) Issue Cert. of Occupancy / / / / 10/28/97 PER BRIAN R. 2/11/98 UG FEES WERE PAID, MAIL JT 02/11/98 JT
BUT HE DOES NOT HAVE THE RECEIPT #
mailed c/o 2/11/98 ;
Page No. 2 CASE HISTORY FOR CASE NO.: BUP97 -0225
MCDONALDS CORPORATION
11201 SW 72ND AVE
02/10/98
Action Description Req/ Scbd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
BUPC760 Gyp Board Inap 07/01/97 / / 09/29/97 1. Three one -hour shafts, not fire -rated PASS RS 09/29/97 J *H
at this time. 2. This inspection also
includes last interior shear walls, B &
E.
BUPC762 Susp Ceilng Inap / / / / 10/13/97 Conditonal approval: Electrical cover to COND TLP 10/14/97 J *H
be approved.
BUPC790 Appr /sdwlk Insp 07/01/97 / / / / 07/01/97 RDP
BUPC792 Misc. Inspection 07/01/97 / / / 97 RDP
BUPC802 Final Inspection 07/01/97 / / 0/28/97 Needs special reports as on permit (to FAIL TLP 02/10/98 JT
sweat within 5 -d
AS PER TOM PLESCHERS INSTRUCTIONS, THIS
DATE "I AM FINISHED WITH THIS PROJECT"
CONCRETE REPORT RECEIVED 2/10/98
2/10/98 TO JILL
�r
4 ►� I
1 I /1
Page No. 1 CASE HISTORY FOR CASE NO.: BUP97 -0225
MCDONALDS CORPORATION
11201 SW 72ND AVE
02/10/98
Action Description Req/ Schd/ End/ Action Notes Diep By Update Upd
Code Sent Done Done Date By
BUPC005 Application received / / / / 05/01/97 RECD DRA 05/05/97 DRA
BUPC008 Permit created / / / / 05/05/97 PASS DRA 05/05/97 DRA
BUPC010 Check for prcl. restrict. / / / / 05/05/97 PASS DRA 05/05/97 DRA
BUPC011 DST /mail Land Use Condition Lt / / / / 05/05/97 PASS BON 05/05/97 DRA
BUPC012 Plans routed to Plans Examiner / / / / 05/08/97 PASS DRA 05/08/97 DRA
BUPC015 Plan Review Ltr. to Ofc. Svcs. / / / / 05/28/97 PETD RDP 05/28/97 RDP
BUPCO26 Approved Plans routed to DST's 07/01/97 / / 07/01/97 APPR RDP 07/01/97 RDP
BUPCO29 DST Poet Review Completed / / / / 07/09/97 PASS B 07/09/97 BON
BUPC060 Other agency review 06/16/97 / / / / PLM97 -0162 and SWR97 -0140 are in the NOTE JSD 11/23/97 JT
hold area. Both can be made "ready to
issue" as soon as this BUP is made
"ready ". jed
BUPC070 HOLD FOR (Note in Action Memo) / / / / 11/06/97 e-mail this date to jean,tom,brian HOLD JT 01/15/98 JT
regarding jean's note and condition #20
on sdr97 -0001.
11/17/97, per Brian R., fee still not
paid. Do not issue C /O.
1/15/97 ok with brian for C /O, e-mail to
Tom;" did you get report? holding c/o
for your confirmation ". jeanne t.
BUPC090 (F) Ready to issue / / / / 07/30/97 PASS DRA 07/30/97 DRA
BUPC100 (F) Issue permit / / / / 07/30/97 PASS DRA 07/30/97 DRA
BUPC460 Devel review cond. met / / / / 01/15/98 PASS JDA 01/29/98 JDA
BUPC705 Foot /Found Insp 07/01/97 / / 08/13/97 PASS TLP 08/15/97 J *H
BUPC716 Reinf Steel Inep 07/01/97 / / 08/26/97 1. Submit letter from Engineer PART GS 08/28/97 J *H
addressing 92% compaction at building
pad east end. Approved subject to
above.
BUPC725 Slab Insp 07/01/97 / / / / See addendum to plans detail 2/S1 07/31/97 RDP
approved on 7/31/97 by Bob P
BUPC740 Framing Insp 07/01/97 / / 09/15/97 framing /trusses PASS TLP 09/16/97 J *H
BUPC740 Framing Insp / / / / 09/22/97 Framing inspection approved, shear wall PASS PDC 09/23/97 J *H
hold -downs approved on interior and
exterior walls, fireblocking ok.
Paul D. Craig /LP2A
BUPC742 Roof nailng Insp / / / / 09/15/97 N/R TLP 09/16/97 J *H
BUPC750 Insulation Insp 07/01/97 / / / / 07/01/97 RDP
BUPC757 Shear Wall Insp 07/01/97 / / 09/29/97 shear walls B & E approved. PASS RS 09/29/97 J *H
Received: from CD8 by tig101.ci.tigard.or.us with SMTP (Microsoft Exchange Internet Mail Service Version 5.0.1458.49)
id DSX8VZ30; Tue, 10 Feb 1998 12:25:05 -0800
Comments: Authenticated sender is <tom @[192.168.100.245]>
From: "Tom Plescher" <tom.ci.tigard.or.us>
To: jeanne@ci.tigard.or.us
Date: Tue, 10 Feb 1998 12:16:28 +0000
MIME- Version: 1.0
Content -type: text/plain; charset =US -ASCII
Content- transfer- encoding: 7BIT
Subject: Re: URGENT MESSAGE
Reply -to: tom@ci.tigard.or.us
X- Confirm- Reading -To: tom @ci.tigard.or.us
X- pmrqc: 1
Return - receipt -to: tom @ci.tigard.or.us
Priority: normal
X- mailer: Pegasus Mail for Windows (v2.54)
X- PMFLAGS: 34087040 0
> From: "Jeanne Temple" <JEANNE.COT>
> To: HAP, TOM
> Date: Tue, 10 Feb 1998 10:44:03 +0000
> Subject: URGENT MESSAGE
> Reply -to: jeanne@ci.tigard.or.us
> RE: McDONALDS, 11201 72ND, CIO.
> BUP97 -0225
> SEE MY NOTES AND TOM'S NOTES. I HAVE NOT RECEIVED CONFIRMATION THAT
> TOM GOT REPORT(S).
> TODAY, CONTRACTOR CAME IN WANTING C /O. $40,000 PAYMENT NEEDS TO BE
> MADE. I GAVE HIM INFO I HAD. HE WENT TO CARLSON & GOT COPY OF FINAL
> SUMMARY /SPECIAL INSPECTION, REINFORCED CONCRETE. HOWEVER, THE REPORT
> REFERS TO BUP97 -0353, WHICH IS THE SIGN. BUT, CARLSON DOES NOT
> ALWAYS REFER TO THE CORRECT PERMIT #.
> REPORT STATES: REINFORCED CONCRETE. NOTE: NO STRUCTURAL STEEL SPECIAL
> INSPECTION WAS PERFORMED.
> I NEED TO KNOW IF THIS IS THE REPOR_ _ • n =rd:a° Dninn�„ i
> CONTRACTO' H WO . D B C-K TODAY.
o aware of a special test report except concrete . You might ask who put it on the inspection
it on the computer if it was required. lam finished with this
project.
Jeanne Temple —1 — Tue, 10 Feb 1998 12:34:48
Construction In & Related Tests
Carlson Testing, Inc. Geatechnicat Consulting
Special Inspection P.O. Box 23814
FINAL SUMMARY LETTER Tigard, Oregon 97281
Phone (503) 6843460
November 7 , 1997 FAX (503) 684 -0954
#97- 8539.CTI
City of Tigard Building Dept.
13125 SW Hall Blvd
Tigard, OR 97223 -8199
Attn: Robert Poskin, CBO
Re: McDonalds - Tigard
11201 SW 72nd, Tigard, OR
Permit No.: B
r - 0353/SIT97 -0013
Dear Mr. Poskin: \ a
This is to certify that in accordance with Section 306 of the State
Building Code, we have performed special inspection of the
following item(s) per our inspection reports only:
Reinforced Concrete
Note: No structural steel special inspection was
performed
All inspections and tests were performed and reported according to
the requirements of Project Documents and, to the best of our
knowledge, the work was in conformance with the approved plans and
specifications, approved change orders and applicable workmanship
provisions of the State Building Code and Standards, as well as the
structural engineer's design changes, approvals and verbal
instructions.
Our reports pertain to the material tested /inspected only.
Information contained herein is not to be reproduced, except in
full, without prior authorization from this office.
If there are any further questions regarding this matter, please do
not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING, INC.
James Hietpas
Quality Control Manager
JH:cw
cc: McDonalds Corp - Loy Taylor
Young. Electric Sign
Westech Engineering - Chris Budeski
Ordell Construction - Duane Carver