. arlson Vesting, Inc. GeotechnicalConsulting
P.O. Box 23814
)B NO. 97-3539 Tigard, Oregon 97281
, 199F: Phone (503) 684 -3460
REPORT OF IN -PLACE DENSIT TES F TS FAX (503) 684 -0954
:Iient IA •. - \ . . - - A - -.
Permit Ni:' . SIT97- 001 /t- - :UF' '7 -03S_'
'roject u A . - _ ■ ^ - _ • -'
11201 SW 72ND - TIGARD OR
.laterial Description 2./.4."-0 ROC': FROM TIGARD SAND u, GRAVEL
lax. Dry Density 122 - Ibs. /cu. ft. Optimum Moisture 1 =: - 7 % Method of Test ririSHTO T
ASTM D2922
;tar,d r Count Density: Moisture: Serille 341:)/'2cs::=: _
DATE OF TEST % ADJ. ELEV. FIELD IN -PLACE DENSITY %
TEST LOCATION COARSE MAX. MOISTURE (LBSJCU.FT.)
TEST NO DEPTH PARTICLES DENS. FT. % WET DRY COMPACTION
13C 25' ' FRO_IM THE SOUTH END - TOP -- ---
4
6-18 6. 134.4 126 1M+
)C)+
BC: 75' FROM THE SOUTH END TOP
5
6-18 7.6 1 2(x . 1 1 / . :3 , . /Fi
BC: 125' FROM THE SOUTH END TOP
r
6-18 8.1 1:30.2 120.4
•
aemarks: Density & Moisture Counts
95I REGIUIRED BC: 4
=c: CITY CIF TIGARD BUILDING DEPT BC: 5
YOUNG ELECTRIC SIGN BC 6
P PE
TECHNICAL DIRECTOR
rested by ( _ C0r IPER /CPW Rev i ewect By CARLSON TESTING INC.
'df('>tcnariSPantalneMel> `is b r 4r62uc F, dt keltw oZF'PRor'ia izaRrdrlYrbm this office.
Page No. 1 CASE HISTORY FOR CASE NO.: SIT97 -0013
MCDONALDS CORPORATION
11201 SW 72ND AVE
02/12/98
Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
SITC005 Application received / / / / 05/05/97 RECD DRA 07/07/97 DRA
SITC008 Permit Created / / / / 05/05/97 PASS BON 07/07/97 DRA
SITC010 Check for prcl. restrict. / / / / 05/05/97 Conditions of approval for a \SDR97 -0001 PEND BON 07/07/97 DRA
apply.
SITC011 DST /mail Land Use Condition Lt / / / / 05/05/97 SENT BON 07/07/97 DRA
SITC013 Plans Routed to Plans Examiner / / / / 05/05/97 PASS BON 07/07/97 DRA
SITC015 Plan Rev. Ltr Sent to Ofc Svcs / / / / 05/06/97 JHF 07/07/97 DRA
SITC018 Revised Plans Received / / / / 06/23/97 Everything in except decision on JHF 07/07/97 DRA
placement of fire hydrant 6/26/97
SITCO26 Plans approved by CPE / / / / 06/26/97 APPR JHF 07/22/97 JHF
SITCO30 Reviewed plans routed to DSTS / / / / 06/26/97 APPR JHF 07/22/97 JHF
SITCO32 DST Post - Review Completed / / / / 07/07/97 On hold till approval from planning & PASS DRA 07/22/97 JHF
engineering on SDR97 -0001.
Needs to identify contractor.
SITC080 (F) Ready to issue / / / / 07/30/97 PASS DRA 07/30/97 DRA
SITC092 (F) Issue permit / / / / 07/30/97 PASS DRA 07/30/97 DRA
SITC700 Erosion Control 07/07/97 / / / / 10/28/97 J *H
SITC702 Excavation Insp 07/07/97 / / 10/28/97 I guess the check mark means that the PASS TLP 10/28/97 J *H
report was received.
SITC710 Fill Inspection 07/07/97 / / 10/28/97 PASS TLP 10/28/97 J *H
SITC720 Grading Insp 07/07/97 / / 10/28/97 PASS TLP 10/28/97 J *H
SITC740 Strm Drain Insp 07/07/97 / / 10/16/97 PASS TLP 10/17/97 J *H
SITC750 San Sewer Insp 07/07/97 / / 10/16/97 PASS TLP 10/17/97 J *H
SITC757 Domestic water line inspect. 07/07/97 / / 10/16/97 note: TVW PASS TLP 10/17/97 J *H
SITC773 Reinforced concrete final rept 07/07/97 / / 10/28/97 I guess the check mark means he received PASS TLP 10/28/97 J *H
the report.
SITC775 Engineered grading final reprt 07/07/97 / / 10/28/97 I guess the check mark and approved PASS TLP 10/28/97 J *H
circled means this was completed.
SITC799 Final Inspection / / / / 06/26/97 Hold for location and installation of PASS JHF 10/28/97 J *H
fire hydrant.
Fire flow analysis provide by interface
engineers, 7/17/97 OK
Site work approved - final TLP, 102897
SITC800 Case Finaled / / / / 10/28/97 PASS TLP 10/29/97 J *H