Report Page No. 1 CASE HISTORY FOR CASE NO : PLM97 -0166
MCDONALDS CORPORATI
11201 SW 72ND AVE
02/12/98
Action Description Req/ Schd/ End/ Action Notes Disp By Update Upd
Code Sent Done Done Date By
PLMC003 Application received / / / / 05/01/97 RECD DRA 05/07/97 BON
PLMC005 Permit Created / / / / 05/07/97 PASS B 05/07/97 BON
PLMC007 Plans routed to Plans Examiner / / / / 05/07/97 PASS B 05/07/97 BON
PLMC008 Plans Approved /Routed to DST / / / / 06/05/97 PASS MS 06/05/97 MRS
PLMC015 DST Post Review Complete / / / / 06/13/97 In the hold area. Can be made ready as HOLD JSD 06/13/97 JD
soon as BUP97 -0225 is made ready. jsd
PLMCO50 (F) Issue permit / / / / 07/30/97 PASS B 07/30/97 BON
PIMC705 Sewer Inspection 06/05/97 / / 08/22/97 Partial system approval: Sanitary okay PASS MS 08/22/97 J *H
at grease trap.
PLMC705 Sewer Inspection / / / / 09/05/97 grease trap connection approved. PASS RAB 09/11/97 J *H
PLMC710 Water Line Inap 06/05/97 / / 08/22/97 PASS MS 08/22/97 J *H
PLMC711 Water Service Inap 06/05/97 / / 08/22/97 2 -in. copper service underground end of PASS MS 08/22/97 J *H
building, pressure test okay.
PLMC711 Water Service Insp / / / / 09/04/97 #1 Yard hydrant in trash area will PASS RAB 09/04/97 RAB
require a vacuum breaker on hose bibb
and a double check at connection to
main.
PLMC720 PLM /Underfloor 06/05/97 / / 08/19/97 DWV for regular sewerage. Grease lines PART RAB 08/20/97 RAB
still to come.
PLMC720 PLM /Underfloor / / / / 08/20/97 Grease lines to interceptor not FAIL RAB 08/20/97 RAB
completed yet.
PLMC720 PLM /Underfloor / / / / 08/21/97 Water under floor still to come. PASS RAB 08/21/97 RAB
PLMC725 Top -out Inap 06/05/97 / / 09/22/97 PASS MS 09/25/97 J *H
PLMC730 Storm Drain Inap 06/05/97 / / 09/03/97 Partial from manhole at STA south that PART RAB 09/03/97 J *H
top MH to bioswale and to end of future
12 -in 3034.
PLMC735 Rain Drain Insp 06/05/97 / / 08/22/97 Catch basins approved pending PASS MS 08/22/97 J *H
corrections: Manhole inlets and outlets
can't be at the same level.
PLMC735 Rain Drain Inap / / / / 08/22/97 PASS MS 08/22/97 J *H
PLMC735 Rain Drain Inap / / / / 09/05/97 Provide proper bedding for pipe along PASS RAB 09/11/97 J *H
building.
PLMC735 Rain Drain Insp / / / / 09/22/97 interior roof rain drain PASS MS 09/25/97 J *H
PLMC799 Final Inspection / / / / 10/16/97 PASS TLP 10/17/97 J *H