Correspondence (153) He WESTECH ENGINEERING, INC. k 9 /. 7- -000/3
CONSULTING ENGINEERS & PLANNERS 1'
June 20, 1997 RECEIVED
Mr. Jim Funk JUN 2 3 1997
Plans Examiner
City of Tigard Cf1oe
13125 SW Hall Blvd.
Tigard, OR 97223
RE: Site Plan Review, McDonald's Restaurant - Highway 99 & 72nd
J.O.# 1742.057.0
Dear Mr. Funk:
We have reviewed the submitted site plan review comments and have revised the site plan
and civil drawings accordingly. Following is our response to each comment and action
taken:
Site Work
2. The site is not proposed to be divided. The McDonald's site is a leased site. The
. property lines shown are lease lines. The entire property is shown on the survey.
3. The house shown on the site plan and civil drawings was removed after the survey
was completed. We have removed the house and garage from the drawings. We do
not know who removed the structures.
4. The total square footage of the site is as follows:
Total Area Disturbed: 66,407 s.f.
Total Area Leased: 39,885 s.f.
•
Impervious Area:
Within lease area: 32,010 O.
•
Total 37,622 s.f.
Landscaped Area:
• Within lease area: 7,875 s.f.
Total 28,785 O.
5. The total cubic yards of material excavated, filled or relocated are as follows:
Excavated and removed from site: 3,000 c.y.
Excavated and relocated on site: 3,600 c.y.
Imported fill material: 4,400 c.y.
The totals shown have been provided from the contractor.
3841 Fairview Industrial Dr. S.E., Suite 100, Salem, Oregon 97302
Phone: (503) 585 -2474 Fax: (503) 585 -3986
June 20, 1997
Mr. Jim Funk
Page 2
7. Clean outs have been included on the drawings at 100' intervals.
The existing waterline, which is shown to the north of our building is being relocated.
The engineered drawings have been submitted, reviewed, and approved by Tualatin
Valley Water District.
Number 8 of the Notice of decision required additional right of way be granted to
the City to provide for a 40 R.O.W. from centerline to property line. This additional
R.O.W. has been shown on the drawings and the building set accordingly.
9. No retaining walls are shown or proposed for this project.
lg. P P P J
The detention pond is drained through an area drain at the bottom of the pond as
shown on the civil drawings. See Storm Water Detention and Water Quality Detail
Au , on Sheet 3.
Fire and Safety
2. We have submitted the drawings to Tualatin Valley Fire and Rescue (TVFR)
review. Mr. Gene Burchill, from TVFR is reviewing the drawings for placement of
a fire hydrant, if required by TVFR. Once we receive Mr. Burchill's comments we
will revise the drawings accordingly. We anticipate receiving his comments the week
e . - - 7.
This concludes our comments. As requested, we are resubmitting 4 sets of revised drawings
for your review. If you have any questions or need any additional information regarding this
project, please contact us at (503) 585 -2474.