Loading...
Correspondence McDonald's Corporation 5000 S.W. Meadows Road Suite 200 McDonald's Lake Oswego, Oregon 97035 .® 503/684 -9334 Fax: 503/624 -4105 J / -I4' ?- oco /3 RECEIVED JUN 2 5 1997 June 23, 1997 COMMUNITY DEVELOPMENT Mr. Jim Funk City of Tigard 13125 SW Hall Blvd. Tigard, OR. 97223 RE: Response to Site Plan Review Letter dated May 7, 1997 McDonald's Restaurant #97 -0013 Dear Mr. Funk, RE: Response to Building Plan Review dated June 11, 1997 McDonald's Restaurant #97 -0013 Please accept this letter of response in addition to my prior response letter. The following item, under the heading of Site Work, was responded to in the following manner: Item #7,8,9, and 11 See Westech Engineering response letter dated June 20, 1997. Item #10 /See attached structural calculations, with licensed engineers stamp, from Yesco Electric The following item, under the heading of Fire and Life Safety, was responded to in the following manner: Item #1 Attached you will find sheet SD4 showing . the development of a masonry trash corral, in accordance with UFC, secti!►n 1103.2.2. tigardreview. doc(06 /23/97 ) sir Page 2 McDonald's Tigard, OR. Item #2 See attached response letter from Westech Engineering, dated June 20, 1997. We have now responded to Mr. Bob Poskins comment letter, regarding the building review, and we anticipate a building permit shortly. Sincere , Loy Taylor, Construction Project Manager cc: Glenda Stratton tigardreview. doc(06 /23/97 ) McDonald's Corporation 5000 S.W. Meadows Road Suite 200 Lake Oswego Oregon 97035 McDonald's ® at 503/684 -9334 Fax: 503/624 -4105 )IT/ 1-000 5 June 3, 1997 Mr. Jim Funk City of Tigard 13125 SW Hall Blvd. Tigard, OR. 97223 RE: Response to Site Plan Review Letter dated May 7, 1997 McDonald's Restaurant #97 -0013 Dear Mr. Funk, The following items, under the heading of Sitework, was responded to in the following manner: Item # 1 This item was responded to by Wohler's Environmental, our soils testing engineer, by way of a letter sent directly to your office. A copy has been attached for your convenience. 4 tem #2 r This item was responded to by Reppeto & Associates, our land surveying representatives, via, phone conversation directly to your office. A copy of the documentation discussed with Reppeto is attached for your review. Item #3 This item was responded to by Westech Engineering. By way of recap, however, the buildings shown on our original survey are no longer existing. We did not remove these buildings, and we have no knowledge as to the responsible party. Item #4 This item was responded to by Westech Engineering. tigardreview. doc(06 /03/97 ) Page 2 McDonald's Site Plan Review Item #5 This item was responded to by Westech Engineering. Item #6 his item requires special soils inspections as required by City of Tigard Municipal Code. Please find the attached document known as "Soils Special Inspections ". From our conversation over the phone, I understand that Carlson Testing is a suitable contractor to provide the necessary documentation. Item #7 This was responded to by Westech Engineering. Item #8 This item was responded to by Westech Engineering. Item #9 This item was responded to by Westech Engineering. Vif ���l #10 is item was responded to by Young Electric Sign Company. � " ' Attached you will find a copy of the engineering for all signs over six „ ► feet high, which includes one 20 foot high road sign. Item #11 This item was responded to by Westech Engineering. The following item, under the heading Accessibility, was responded to in the following manner: Item #1 Signs designating accessible parking stalls will be mounted on standards and elevated to point 7 feet above finish grade. The following items, under the heading Fire Life Safety, was responded to in the following manner: tigardrevi ew. doc(06 /03/97 ) Page 3 McDonald's Site Plan Review C7 Item S ) v pose to install a trash compactor with a capacity of greater de' 1 f )7 than 1.5 cubic yards. Our trash enclosure is a wood structure with 7 foot high perimeter walls. Our trash compactor will be totally enclosed in steel. We would prefer no modifications to our trash enclosure. Item # h tem was responded to by Westech Engineering. Presently, Westech is working with Tualatin Valley Fire District to establish a location for a fire hydrant, which will meet or exceed the feed requirement. If you have any questions regarding the above information, please contact me at your soonest convenience. S ely, Loy Taylor, Construction Project Manager cc: Glenda Stratton tigardreview. doc(06 /03/97 )