Correspondence McDonald's Corporation
5000 S.W. Meadows Road
Suite 200
McDonald's Lake Oswego, Oregon 97035
.® 503/684 -9334
Fax: 503/624 -4105
J / -I4' ?- oco /3
RECEIVED
JUN 2 5 1997
June 23, 1997
COMMUNITY DEVELOPMENT
Mr. Jim Funk
City of Tigard
13125 SW Hall Blvd.
Tigard, OR. 97223
RE: Response to Site Plan Review Letter dated May 7, 1997
McDonald's Restaurant #97 -0013
Dear Mr. Funk,
RE: Response to Building Plan Review dated June 11, 1997
McDonald's Restaurant #97 -0013
Please accept this letter of response in addition to my prior response
letter.
The following item, under the heading of Site Work, was responded
to in the following manner:
Item #7,8,9, and 11
See Westech Engineering response letter dated June 20, 1997.
Item #10
/See attached structural calculations, with licensed engineers stamp,
from Yesco Electric
The following item, under the heading of Fire and Life Safety, was
responded to in the following manner:
Item #1
Attached you will find sheet SD4 showing . the development of a
masonry trash corral, in accordance with UFC, secti!►n 1103.2.2.
tigardreview. doc(06 /23/97 )
sir
Page 2
McDonald's
Tigard, OR.
Item #2
See attached response letter from Westech Engineering, dated June
20, 1997.
We have now responded to Mr. Bob Poskins comment letter,
regarding the building review, and we anticipate a building permit
shortly.
Sincere ,
Loy Taylor, Construction Project Manager
cc: Glenda Stratton
tigardreview. doc(06 /23/97 )
McDonald's Corporation
5000 S.W. Meadows Road
Suite 200
Lake Oswego Oregon 97035
McDonald's
® at 503/684 -9334
Fax: 503/624 -4105
)IT/ 1-000 5
June 3, 1997
Mr. Jim Funk
City of Tigard
13125 SW Hall Blvd.
Tigard, OR. 97223
RE: Response to Site Plan Review Letter dated May 7, 1997
McDonald's Restaurant #97 -0013
Dear Mr. Funk,
The following items, under the heading of Sitework, was responded
to in the following manner:
Item # 1
This item was responded to by Wohler's Environmental, our soils
testing engineer, by way of a letter sent directly to your office. A
copy has been attached for your convenience.
4 tem #2
r This item was responded to by Reppeto & Associates, our land
surveying representatives, via, phone conversation directly to your
office. A copy of the documentation discussed with Reppeto is
attached for your review.
Item #3
This item was responded to by Westech Engineering. By way of
recap, however, the buildings shown on our original survey are no
longer existing. We did not remove these buildings, and we have no
knowledge as to the responsible party.
Item #4
This item was responded to by Westech Engineering.
tigardreview. doc(06 /03/97 )
Page 2
McDonald's
Site Plan Review
Item #5
This item was responded to by Westech Engineering.
Item #6
his item requires special soils inspections as required by City of
Tigard Municipal Code. Please find the attached document known
as "Soils Special Inspections ". From our conversation over the
phone, I understand that Carlson Testing is a suitable contractor to
provide the necessary documentation.
Item #7
This was responded to by Westech Engineering.
Item #8
This item was responded to by Westech Engineering.
Item #9
This item was responded to by Westech Engineering.
Vif ���l #10
is item was responded to by Young Electric Sign Company.
� " ' Attached you will find a copy of the engineering for all signs over six
„ ► feet high, which includes one 20 foot high road sign.
Item #11
This item was responded to by Westech Engineering.
The following item, under the heading Accessibility, was responded
to in the following manner:
Item #1
Signs designating accessible parking stalls will be mounted on
standards and elevated to point 7 feet above finish grade.
The following items, under the heading Fire Life Safety, was
responded to in the following manner:
tigardrevi ew. doc(06 /03/97 )
Page 3
McDonald's
Site Plan Review
C7 Item S ) v
pose to install a trash compactor with a capacity of greater de' 1 f )7
than 1.5 cubic yards. Our trash enclosure is a wood structure with 7
foot high perimeter walls. Our trash compactor will be totally
enclosed in steel. We would prefer no modifications to our trash
enclosure.
Item #
h tem was responded to by Westech Engineering. Presently,
Westech is working with Tualatin Valley Fire District to establish a
location for a fire hydrant, which will meet or exceed the feed
requirement.
If you have any questions regarding the above information, please
contact me at your soonest convenience.
S ely,
Loy Taylor, Construction Project Manager
cc: Glenda Stratton
tigardreview. doc(06 /03/97 )