Report JUL 1 1 Main Office Salem Office Bend Office
000 P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918
Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708
Ca on Test n g Inc • Phone (503) 684 -3460 Phone (503) 589 -1252 Phone (541) 330 -9155
FAX (503) 684 -0954 FAX (503) 589 -1309 FAX (541) 330 -9163
Moisture - Density Relationship
Permit No.: SIT - 2000 -00014
Client: McDonalds Corp - Loy Taylor 07/03/00
Project: McDonalds Parking Lot Improvement - Tigard Job Number: T0004729
Material Type: Native Brown Silty Clay Location: On - Site (Test 1 and 2)
Test Method: AASHTO T -180 A, T -27, T -265 Date Sampled: 06/23/00
Sample Method: AASHTO T -2 Date Tested: 06/26/00
Preparation Method: Moist Oversized Material: Removed
Compacting Method: Manual Hammer Type: Circular
112
111
110
Q 109
Z.',
c
p 108
t' Ori\a
fa
107
106
105
11 12 13 14 15 16 17
Moisture Content ( %)
Zero Air Voids Line = 2.500
Optimum Moisture: I 13.9% I Max. Dry Density: I 110.0 I Ibs /ft'
Percent Passing #4 Sieve: 98.9%
cc: City of Tigard
Stolle Construction
Reviewed By:
Our reports pertain to the material tested /inspected only. Information contained her •' is not to be
reproduced, except in full, without prior authorization.
O 1 7 ' , r44 Main Office Salem Office Bend Office
1 I P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918
Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708
ting one (503) 684 -3460 Phone (503) 589 -1252 Phone (541) 330 -9155
• P.1 • Inc. • FAX (503) 684 -0954 FAX (503) 589 -1309 FAX (541) 330 -9163
`.
JUN 3 0 2000 Moisture - Density Relationship
Permit No.: SIT - 2000 -00014
$Y: . ' co onalds Corp - Loy Taylor 06/28/00
Project: McDonalds Parking Lot Improvement - Tigard Job Number: T0004729
Material Type: 3/4 " -0 Reject Rock from CC Meisel - Location: On -Site (Stockpile)
Town Quarry
Test Method: AASHTO T -180 D, T -27, T -265 Date Sampled: 06/19/00
Sample Method: AASHTO T -2 Date Tested: 06/22/00
Preparation Method: Moist Oversized Material: Removed
Compacting Method: Manual Hammer Type: Circular
116
115
114
113
112
111
110
109
14 15 16 17 18 19 20 21 22 23
Moisture Content ( %)
Optimum Moisture: I 18.3% I Max. Dry Density: I 114.2 I Ibs /ft'
Percent Passing 3/4" Sieve: 99.9%
cc: City of Tigard
Stolle Construction
Reviewed By:
Our reports pertain to the material tested /inspected only. Information contained herein is not to be
reproduced, except in full, without prior authorization.
RED':ETV
C arlson Testing, JUl 1 2 20Q� Co nstruction Inspection &Related I nc. Geotechnical Consulting
P.O. Box 23814
JOB NO. T0004729 Tigard, Oregon 97281
.:f u n 3 0, 200 0 Phone (503) 684 -3460
REPORT OF IN -PLACE DENSITY TESTS FAX (503) 684 -0954
Client MCDONALDS CORP - LOY TAYLOR
Permit No: SIT - 2000 -00014
Project MCDONALDS PARKING LOT IMPROV MENT - TIGARD
11201 SW 72ND TIGARD OR
Material Description 3/4 " -0 REJECT ROCK FROM CC MEISEL - TOWN QUARRY
Max. Dry Density 1 14 . 2 lbs. /cu. ft. Optimum Moisture 18.3 % Method of Test AASHTO T180
ASTM D2922,D3017
Standard Count Density: 2780 Moisture: 577 Seria> #oiler 14489 NUC 3440
DATE OF TEST CO MAX ELEV. MOISTURE IN-PLACE
(LBSJCU.FT.) DENSITY
TEST NO TEST LOCATION DEPTH PARTICLES DENS. FT. % WET DRY COMPACTION
SF SOUTH END OF KEYSTONE WALL -11
6
6 -22 19.1 129.6 108.8 95
SF OUTSIDE OF WALL ON FUTURE SITE -10
7
6 -22 17.8 130.6 110.9 97
SF OUTSIDE OF WALL ON FUTURE SITE -10
8
6 -22 16.0 130.9 112.8 99
Remarks: Den:•; i ty & Moisture Counts
95% REQUIRED SF 6 3167, 214
cc: CITY OF TIGARD SF 7 1487, 204
STOLL.E CONSTRUCTION SF 8 1477, 188
C ;;1::PW '
Reid F. Kenner
Tested by M. VEDDER /KAM Reviewed By Projec sll r c
,O,ur reports pprta j n to the nat�ria l ; t���teci�/ i nspectc�c on l .
rnm thic nfTice
RECFJVF,D
i
Jut_ ,Jut_ 1 2 2 000 Construction inspection & Related Tests
Carlson Testing, Inc. Geotechnical Consulting
P.O. Box 23814
JOB NO. T0004729 Tigard, Oregon 97281
Jun 3 0, 2000 Phone (503) 684 -3460
REPORT OF IN -PLACE DENSITY TESTS FAX (503) 684 -0954
Client MCDONALDS CORP - LOY TAYLOR
Permit No: SIT -2000 -00014
Project MCDONAI DS PARKING I OT TMPROVFMFNT - TIGARD
11201 SW 72ND TIGARD OR
Material Description .3 /4 " -fl RF,TFC.T ROCK FROM CC MFTSFI - TOWN QUARRY
Max. Dry Density 1 1 4 2 lbs. /cu. ft. Optimum Moisture 1R . 3 % Method of Test AASHTO T IRO
ASTM D2922,D3017
Standard Count Density: 2758 Moisture: 601 Seria lFnx 1 hr 144119 Nl1C 3440
DATE OF TEST % ADJ. ELEV. FIELD IN -PLACE DENSITY
TEST NO
TEST L O C AT I O N DEPTH PARTICLES DENS. FT MOISTURE WET BSJCU. DRY COMPACTION
SF STREET STATION 0 +50 AND 15' -11
1 OFF WALL
6 -23 15.8 126.4 109.2 96
SF STREET STATION 0 +20 AND 40' -11
2 OFF WALL
6 -23 11.4 125.1 112.3 98
SF STREET STATION 0 +20 AND 20' 10.5
3 OFF WALL
6 -23 19.0 129.7 109.0 95
SF STREET STATION 0 +65 AND 10' 10.5
4 OFF WALL
6 -23 19.7 133.2 111.3 97
SF STREET STATION 0 +50 AND 35' -10
5 OFF WALL
6 -23 10.8 124.5 112.4 98
Remarks: Density & Moisture Counts
95% REQUIRED SF 1 1671, 188
cc: CITY OF TIGARD SF 2 1741, 144
STOLLE CONSTRUCTION SF 3 1525, 222
SF 4 1388,
SF 5 1775,
Reid F. Kenner
Project Field Manager
Tested by M. VEDDER /KAM Reviewed By CgRL,SQN T €anN I,_,
,Our reports pertain to ,the r ratirial /inspect1'J. only_ _ ,_; «.