Report 8/16/00 Activities for Case #: MST2000 -00245 e •
3:53:34 PM '
t
Assigned Hold Updated
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes
MSTA005 Application received 7/13/00 DLH DONE No Hold BT2 7/28/00
MSTA008 Permit Created 7/22/00 BT2 DONE No Hold BT2 7/28/00 : f
MSTA010 Check for prcl. restrict. 7/28/00 BT2 No Hold BT2 7/28/00
a
MSTA012 Plans routed to Plans Examiner 7/22/00 BT2 DONE No Hold BT2 7/28/00
MSTA026 Plans approved by Pln Examiner 7/28/00 BT2 DONE No Hold BT2 7/28/00
MSTA030 Reviewed plans routed to DSTS - 7/28/00 BT2 DONE No Hold BT2 7/28/00
MSTA700 Erosion 844 -8444 No Hold BT2 7/28/00
MSTA704 Sewer Inspection No Hold BT2 7/28/00
MSTA705 Footing Insp No Hold BT2 7/28/00
MSTA706 Foundation Insp No Hold BT2 7/28/00
MSTA707 Slab Insp No Hold BT2 7/28/00
MSTA709 Wtr Proofing Bsm't Walls No Hold BT2 7/28/00
MSTA710 Post/Beam Structural No Hold BT2 7/28/00
MSTA711 Post/Beam Mechanical No Hold BT2 7/28/00
MSTA712 Underfloor insulation No Hold BT2 7/28/00
MSTA713 Crawl Drain /Backwater valve No Hold BT2 7/28/00
MSTA714 Footing /Foundation Drain No Hold BT2 7/28/00
MSTA715 Plm/undslab Insp No Hold BT2 7/28/00
MSTA71• PLM /Underfloor No Hold BT2 7/28/00
MSTA718 Ftng Drain Bsm't Walls • No Hold BT2 7/28/00
MSTA720 Mechanical Insp No Hold BT2 7/28/00 "B 'Vent for water heater
MSTA720 Mechanical Insp No Hold BT2 7/28/00
MSTA722 Plumb Top Out No Hold BT2 7/28/00
MSTA723 Electrical Service No Hold BT2 7/28/00
MSTA724 Electrical Rough In No Hold BT2 7/28/00 '
MSTA725 Framing Insp No Hold BT2 7/28/00
MSTA726 Shear Wall Insp No Hold BT2 7/28/00 R
MSTA727 Exterior Sheathing Insp No Hold BT2 7/28/00
MSTA728 Low Voltage No Hold BT2 7/28/00 - ... .
MSTA735 Gas Line Insp No Hold BT2 7/28/00 r
MSTA736 Gas Fireplace No Hold BT2 7/28/00 •1 •+ •
i •
• Page 1 of 2 r
8/16/00 Activities for Case #: MST2000 -00245
3:53:34 PM
Assigned Hold Updated ' ' • • .
Activity Description Date 1 Date 2 Date 3 To Done By Disp. Level By Updated Notes ..
MSTA740 Insulation Insp No Hold BT2 7/28/00 •
•
MSTA752 Rain drain Insp No Hold BT2 7/28/00 • '
MSTA760 Water Line Insp No Hold BT2 7/28/00
•
MSTA765 Appr /Sdwlk Insp No Hold BT2 7/28/00
MSTA790 Electrical Final No Hold BT2 7/28/00
MSTA795 Mechanical Final No Hold BT2 7/28/00
MSTA797 Plumb Final No Hold BT2 7/28/00
MSTA798 Final inspection No Hold BT2 7/28/00
MSTA799 Building Final
No Hold BT2 7/28/00
MSTA032 DST Post- Review Completed . 8/2/00 GWL DONE No Hold GWL 8/2/00
MSTA080 (F) Ready to issue 8/2/00 GWL DONE No Hold GWL 8/2/00
MSTA092 (F) Issue combination permit 8/3/00 JMT DONE No Hold JMT 8/3/00
MSTA095 Issue plumbing signature form 8/3/00 JMT DONE No Hold JMT 8/3/00
MSTA097 Issue electric signature form 8/3/00 JMT DONE No Hold JMT 8/3/00
MSTA093 (F) Reprint Permit 8/9/00 ZZZ DONE No Hold ZZZ 8/9/00
f .
-
. 0t
t • .
Pagel 2 of 2