Plans (705) "✓ J o 00 2 -5`7
f ROELICH '� ece
CONSULTING ocr
ENGINEERS INC • t)0 /)
MAIN OFFICE ❑ CENTRAL OREGON ❑ //^
6969 SW Hampton Street 231 SW Scalehouse Loop, Suite 101 W 49 4 Tigard, Oregon 97223 Bend, Oregon 97702
503.624- 7005/503.624 -9770 FAX 541.383- 1828/541.383 -7696 FAX
Structural - Final Summary Letter
October 2, 2008
FCE Project No.: 05 -T361
City of Tigard
13125 SW Hall Blvd
Tigard, OR 97223 -8199
RE: Dartmouth Square 11.E COPY
11945 SW 70 Street
Tigard, OR
Permit No.: BUP2006 -00299
This letter is to confirm that Froelich Consulting Engineers have performed Structural Observations in
accordance with the 2007 OSSC, Chapter 17, Section 1709. To the best of our knowledge the
construction of the structural portions of the Dartmouth Square building are in conformance with the
approved construction documents.
Please feel free to contact our e ice if you have any questions. S'� oor L4
( � . p Pao e
15 /
Stncerel , l; — cc
me
I II
GON
, Q v / gq\
Bean Azimi, S.E. 17 '982 5 A
!EXPIRES: )2/31 / °\ J
Cc: File
Myhre Group – Steve Pearson
SI Grace – Larry Brooks