Loading...
Plans (706) DARTMOUTH SQUARE OFFICE BUILDING: . CITY OF TIGARD 11945 SW 70 AVENUE 13125 SW HALL BLVD October 19, 2006 TIGARD, OR 97223 SHEET 1 OF 3 ) f 0 zw6 Go v i Project No. 060841 STRUCTURAL PLAN REVIEW # 2 Plans Dated 10/10/06 • Corr. Item Page No. Comments,, '� �� y ' Section Made No. `_ , •- 1 Sheet A1.2 Submit calculations and details trash, ' 106.1.1 enclosure. � �• 2 Sheets RW1 and RW2 Submit calculations for retaining walls: 106.1.1 10/18/06 3 Sheet S1.1 Submit the frequency of items noted as 1705.2 Special Inspection periodic. 10/18/06 4 Sheet S1.1 Submit calculations and details for metal or 1405.5.2 Masonry/Stone Veneer wire ties. (4) 5 Sheet S1.1 Submit calculations and details for self drilling 106.1.1 Light Gage Steel screws. Framing (3) 10/18/06 6 Sheet S2.1 Calculations page 507 note 11.5 inches for 106.1.1 Detail 6/S4.1 "d" on a 12 inch wall. Clarify. 10/18/06 7 Sheet S2.1 Submit calculations and details for track to 106.1.1 Detail 8/S4.1 stud connection. 10/18/06 8 Sheet S2.1 Calculation pages 509 thru 520 note 8.0 106.1.1 Detail 9/S4.1 inches for "d" on a 10 inch wall clarify. 10/18/06 9 Sheet S2.2 and S2.3 Submit calculations and details for brick 106.1.1 Details 15/S5.2, support. Note: Details not per calculation 17/S5.2, 18/S5.2, pages 524 and 525. 19/S5.2, 32/S5.3, 33/S5.3 10/18/06 10 Sheet S2.2 and S2.3 Submit calculations and details for HSS to 106.1.1 Details 15/S5.2, track and track to stud. 17/S5.2, 18/S5.2, 19/S5.2, 32/S5.3, 33/S5.3 10/18/06 11 Sheet S2.2 Submit calculations and details for 106.1.1 Details MF1 /S3.1 connections at grids 2 and A. 10/18/06 12 Sheet S2.2, S2.3, S3.1 Submit calculations and details for seismic 106.1.1 Lateral Calculations loading including brick weight. Note: pages 555 thru 640 Calculations are not the same as the items noted on drawings. 10/18/06 13 Sheet S2.2 and S2.3 Submit calculations for W14X, W16 106.1.1 Details 4/S5.1 connection of plate to HSS wall. DARTMOUTH SQUARE OFFICE BUILDING: CITY OF TIGARD 11945 SW 70 AVENUE 13125 SW HALL BLVD October 19, 2006 TIGARD, OR 97223 SHEET 2 OF 3 Project No. 060841 STRUCTURAL PLAN REVIEW # 2 Plans Dated 10/10/06 Corr. Item Page No. Comments Code Section Made No. 10/18/06 14 Sheet S2.2 and S2.3 Detail notes detail 15/S7.1. Detail 15/S7.1 to 106.1.1 Detail 33/S5.3 be submitted. 15 Sheet S2.3 Submit calculations and details for method 106.1.1 used to transfer diaphragm forces around opening at grid 5 to 6. 16 Sheet S2.2, S2.3 and Submit calculations and details for 106.1.1 S2.4 method used to transfer lateral forces from diaphragm to special moment frames. 10/18/06 17 Sheet S2.2 and Submit calculations and details for base 106.1.1 Detail MF7 /S3.1 connection. 10/18/06 18 Sheet S2.5 Submit calculations (page 537) for uplift and 106.1.1 Details 21/SS5.2, lateral buckling. 22/S5.2 and 24/S5.2 10/18/06 19 Sheet S3.28, S3.3 Submit calculations and details for 106.1.1 Detail 20/S5.2 connection of angles to HSS. 20 Special Inspection Special inspection is required for concrete, 1704, 1705, 1707, welding, reinforcing steel, bolting, welded 1708 studs, embed plates, bolts in concrete, structural steel fabrication and erection, epoxy anchors and floor and roof metal deck. 21 Structural Observation Structural observation is required for concrete foundation, steel moment frames, roof and floor diaphragms and at completion. 22 General Submit one set of reinforced steel shop (Deferred Submittal) drawings, which have been reviewed an initialed by the project engineer, to be filed with the City of Tigard before placement. 23 General Submit one set of miscellaneous steel shop (Deferred Submittal) drawings, which have been reviewed an initialed by the project engineer, to be filed with the City of Tigard before placement. 24 General Submit one set of light gage steel shop (Deferred Submittal) drawings, which have been reviewed an initialed by the project engineer, to be filed with the City of Tigard before placement. 25 General Submit one set of steel decking shop (Deferred Submittal) drawings, which have been reviewed an initialed by the project engineer, to be filed with the City of Tigard before placement. DARTMOUTH SQUARE OFFICE BUILDING: CITY OF TIGARD 11945 SW 70 AVENUE 13125 SW HALL BLVD October 19, 2006 TIGARD, OR 97223 SHEET 3 OF 3 Project No. 060841 STRUCTURAL PLAN REVIEW # 2 Plans Dated 10/10/06 Corr. Item Page No. Comments Code Section Made No. 26 General Submit one set of steel stair framing shop (Deferred Submittal) drawings, which have been reviewed an initialed by the project engineer, to be filed with the City of Tigard before placement. 27 General Approved resolution of the above terms shall be incorporated into submittal plans before a permit will be issued. Submit (4) sets of the revised plans to the city of Tigard 28 Sheet S1.1 Submitted plans note special concentric 106.1.1 Structural Steel braced frames. Structural notes detail special Item 14 moment resisting frames. Clarify.