Loading...
Plans (697) t ( < 5) ado fROEIICH "*.C) \\ �`o. CONSULTING y ENGINEERS INC ���� ° � MAIN OFFICE ❑ CENTRAL. OREGON 0 6969 SW Hampton Street 745 NW Mt Washington Dr, Suite 204 Tigard, Oregon 97223 Bend, Oregon 97701 503 - 624 -7005 PH. 541 - 383 -1828 PH. 503 - 6249770 FAX 541- 383 -7696 FAX Plan Check Response To: Brian Blalock — City of Tigard From: Michael Peterson, P.E. Date: 9/5/06 Project: Dartmouth Square Jurisdiction Permit #: BUP2006 -00299 FCE Job #: 05 -T361 This memorandum is in response to the structural plan check comments by Miller Consulting Engineers for the City of Tigard. Since the plan check comments the building's structural system has changed extensively, such that some comments may no longer apply. An entire new set of structural drawings and calculations have been issued for your review. Please see below for a response to each numbered issue: 1. Pages containing calculations for the trash enclosure have been added to the package. The changes have been forwarded to the architect so that they can be added to architectural sheet A1.2. In addition the trash enclosure detail will be shown on the structural drawings as well. 2. We completed these calculations and the architect submitted them to the city with the rest of the engineering calculations. They probably did not get forwarded to Miller Consulting. Please forward them for review. 3. A note regarding the frequency of periodic special inspections has been added on sheet S1.1. 4. Veneer is 4" brick as called in the specifications. This allows standard veneer ties to be used per code as described on S1.1. 5. A page has been added, showing calculations for the self - drilling screws at the exterior walls. 6. The calculations have been revised to show a "d" of 9.5 ". 7. Details have been updated to show a connection between the studs and the track. 8. The calculations have been revised to show a 2" of cover on the toe side and 3" of cover on the soil side. Details have been revised to show the new wall changes. 9. Calculations have been update for the connection shown in the details. 10. Details have been updated to show the connections between the studs and the track as well as the connection between the track and the HSS header. 11. Detail has been added to the plans. This detail shows the connection of the floor beam to the concrete column. Please note that this particular beam is not part of a moment frame. The moment frame lateral system has been changed to a different braced frame system. 12. Calculation pages have been added which show the mass of the veneer as an included weight in the seismic calculations. The veneer is treated as a line Toad around the perimeter of the building. 13. Calculation pages have been added to the package showing the connection of the beams to the columns. Three beams had to be increased in size to allow for the proper number of bolts at the connections. 14. The detail has been updated to reference the correct detail. 15. Calculation pages have been added that show the method used for transferring load around the large opening. 16. The moment frame system has been changed to a braced frame system. The drag strut requirements have changed and are covered in the new calculation package. 17. New braced frame system instead of original moment frame system. 18. Calculation pages have been added to the package showing the uplift condition and checking for lateral bucking. 19. Details have been updated to show a weld connection between the angle and the HSS. 20. Special inspection testing laboratory will submit reports for the inspected items for review. A final approval letter will be provided. 21. We will provide structural observation for the listed items throughout the duration of the project. 22. This is a deferred submittal and will be presented prior to construction. 23. This is a deferred submittal and will be presented prior to construction. 24. This is a deferred submittal and will be presented prior to construction. 25. This is a deferred submittal and will be presented prior to construction. 26. This is a deferred submittal and will be presented prior to construction. 27. The proper sets will be presented to the city. These comments should answer the questions that were listed. If you have further questions or require more information please call. Regards, Michael Peterson, P.E. Rug 03 06 02:15p Froelich Consulting Eng 503 - 624 -9770 p.l ;: +�' July 28, 2006 CITY OF TIGARD OREGON Froelic Consulting Engineers, Inc. 6969 SW Hampton Street Portland, OR 97223 RE: STRUCTURAL PLAN REVIEW ONLY Project Information Building Permit: BUP2006 -00299 Occupancy Type: B Project Name: Dartmouth Square Construction Type: IIB Address: 11945 SW 70 Avenue Occupant Load: NA Area: 38,380 Sq Ft Stories: 3 To whom it may concern, Attached is the STRUCTURAL PLAN REVIEW performed by Miller Consulting Engineers, for the City of Tigard, under the State of Oregon Structural Specialty Code (OSSC) 2004 edition. • Please provide an item by item response to the review document and 2 copies of any revised plans, calculations or details. When submitting revised drawings or additional information, please attach a copy of the enclosed City of Tigard, Letter of Transmittal. The letter of transmittal assists the City of Tigard in tracking and processing the documents. Resp �� / G i f % / !aria laloc RECEllVE Senior P Examiner L! JUL 31 2006 Froelich Consulting Engineers for; 6.G : f --rY(- L GQdup /1-FZcy Pre c7- 1 3125 SW Q6p myhxerc elltil ft(503) 639 -4171 TDD (503) 684 -2772 Rug 03 06 02:15p Froelich Consulting Eng 503 - 624 -9770 p.2 DARTMOUTH SQUARE OFFICE BUILDING: CITY OF TIGARD 11945 SW 70 AVENUE 13125 SW HALL BLVD JULY 25, 2006 TIGARD, OR 97223 SHEET 1 OF 3 Project No. 060841 STRUCTURAL PLAN REVIEW # 1 Plans Dated 6/19/06 Corr. Item Page No. Comments Code Section Made No. 1 Sheet A1.2 Submit calculations and details for trash 106.1.1 enclosure. 2 Sheets RW1 and RW2 Submit calculations for retaining walls. 106.1.1 3 Sheet S1.1 Submit the frequency of items noted as 1705.2 Special Inspection periodic. 4 Sheet S1.1 Submit calculations and details for metal or 1405.5.2 Masonry/Stone Veneer wire ties. (4) 5 Sheet S1.1 Submit calculations and details for self drilling 106.1.1 Light Gage Steel screws. Framing (3) 6 Sheet S2.1 Calculations page 507 note 11.5 inches for 106.1.1 Detail 6/S4.1 °d° on a 12 inch wall. Clarify. 7 Sheet S2.1 Submit calculations and details for track to 106.1.1 Detail 8/S4.1 stud connection. 8 Sheet S2.1 Calculation pages 509 thru 520 note 8.0 106.1.1 Detail 9/S4.1 inches for °d° on a 10 inch wall clarify. 9 Sheet S2.2 and S2.3 Submit calculations and details for brick 106.1.1 Details 15/S5.2, support. Note: Details not per calculation 17/S5.2, 18/S5.2, pages 524 and 525. 19/S5.2, 32/S5.3, 33/S5.3 10 Sheet S2.2 and S2.3 Submit calculations and details for HSS to 106.1.1 Details 15/S5.2, track and track to stud. 17/S5.2, 18/S5.2, 19/S5.2, 32/S5.3, 33/S5.3 11 Sheet S2.2 Submit calculations and details for 106.1.1 Details MF1 /S3.1 connections at grids 2 and A. 12 Sheet S2.2, S2.3, S3.1 Submit calculations and details for seismic 106.1.1 Lateral Calculations loading including brick weight. Note: pages 555 thru 640 Calculations are not the same as the items noted on drawings. 13 Sheet S2.2 and S2.3 Submit calculations for W14X, W16 106.1.1 Details 4/S5.1 connection of plate to HSS wail. Flue 03 06 02:15p Froelich Consulting Eng 503 - 624 -9770 p.3 DARTMOUTH SQUARE OFFICE BUILDING: CITY OF TIGARD 11945 SW 70TH AVENUE 13125 SW HALL BLVD JULY 25, 2006 TIGARD, OR 97223 SHEET 2 OF 3 Project No. 060841 STRUCTURAL PLAN REVIEW # 1 Plans Dated 6/19106 Corr. Item Page No. Comments Code Section Made No. 14 Sheet S2.2 and S2.3 Detail notes detail 15/S7.1. Detail 15/S7.1 to 106.1.1 Detail 331S5.3 be submitted. 15 Sheet S2.3 Submit calculations and details for method 106.1.1 used to transfer diaphragm forces around opening at grid 5 to 6. 16 Sheet S2.2, S2.3 and Submit calculations and details for 106.1.1 S2.4 method used to transfer lateral forces from diaphragm to special moment frames. 17 Sheet S2.2 and Submit calculations and details for base 106.1.1 Detail MF7 /S3.1 connection. 18 Sheet S2.5 Submit calculations (page 537) for uplift and 106.1.1 Details 211SS5.2, lateral buckling. 22/S5.2 and 24/S5.2 19 Sheet S3.28, S3.3 Submit calculations and details for 106.1.1 Detail 20/S5.2 connection of angles to HSS. 20 Special Inspection Special inspection is required for concrete, 1704, 1705, 1707, welding, reinforcing steel, bolting, welded 1708 studs, embed plates, bolts in concrete, structural steel fabrication and erection, epoxy anchors and floor and roof metal deck. 21 Structural Observation Structural observation is required for concrete foundation, steel moment frames, roof and floor diaphragms and at completion. 22 General Submit one set of reinforced steel shop drawings, which have been reviewed an initiated by the project engineer, to be filed with the City of Tigard before placement. 23 General Submit one set of miscellaneous steel shop drawings, which have been reviewed an initiated by the project engineer, to be filed with the City of Tigard before placement. 24 General Submit one set of light gage steel shop drawings, which have been reviewed an initialed by the project engineer, to be filed with the City of Tigard before placement. 25 General Submit one set of steel decking shop drawings, which have been reviewed an initialed by the project engineer, to be filed with the City of Tigard before placement. Rug 03 06 02:16p Froelich Consulting Eng 503 - 624 -9770 p.4 DARTMOUTH SQUARE OFFICE BUILDING: CITY OF TIGARD 11945 SW 70 AVENUE 13125 SW HALL BLVD JULY 25, 2006 TIGARD, OR 97223 SHEET 3 OF 3 Project No. 060841 STRUCTURAL PLAN REVIEW # 1 Plans Dated 6/19/06 Corr. Item Page No. Comments Code Section Made No. 26 General Submit one set of steel stair framing shop drawings, which have been reviewed an initialed by the project engineer, to be filed with the City of Tigard before placement. 27 General Approved resolution of the above terms shall be incorporated into submittal plans before a permit will be issued. Submit (4) sets of the revised plans to the city of Tigard