Correspondence (36) 2 : • &le 49 OS C'
�2••/ I I l l 1 l
CITY OF TIGARD
October 31, 1996
O REGON
Tim Roth
12540 SW 68th Pkwy #B
Tigard OR 97223
TRAFFIC IMPACT FEE FOR WAYMIRE OFFICE BUILDING
Enclosed with this letter you will find a calculation sheet showing the computation
that has been performed to determine the amount of the Traffic Impact Fee (TIF) to
be paid for the project noted above. The amount of the TIF is $ 19,222.00.
You have three payment options available to you. The first is to pay the TIF at the
time you are issued a building permit. The second is to arrange for payment over
time by signing a promissory note (if you wish to exercise this second option please
contact me for additional details). The third option is to defer payment until
occupancy. Traffic impact fees are subject to an annual increase of up to 6% if not
paid or financed prior to July 1st of each year.
Please note that you may appeal the discretionary decisions made in determining the
appropriate category and the amount of the fee based on that category. A notice of
appeal must be received by the City Recorder no later than 5:00 p.m. on Nov. 14,
1996 and must be accompanied by the $625.00 appeal fee required by Washington
County. Although filed with the City Recorder, an appeal would be heard by the
Washington County Hearings Officer.
If you have any questions, or if I can be of further service, please contact me at 639-
4171.
��v�✓w� KAAaidi Mulhearn
Development Services Technician
c: TIF file
Building file ,
•
1:0STS3TIF DOT
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772
•
DATE: PUNS CHECK NO..
0 -1 C
PROJECT TITLE:
COUNTYWIDE 4 1 60 & 4 ' J. 1 . k/i ! �
TRAFFIC IMPACT FEE APPLICANT
WORKSHEET LING R4
MAILING ADDRESS: h
(FOR NON - SINGLE FAMILY USES) ‘ 2r' LI0 "DU.) I or— T �
CITY/ZIP /PHONE: •
co 223
RATE PER TAX MAP NO.:
LAND USE CATEGORY TRIP 29 IAA- qty
SITUS NO. ADDRESS: 7
RESIDENTIAL $169.00 1 Z5 O Su) I ca ICJ e . -
BUSINESS AND COMMERCIAL $42.00
yr $155.00
INDUSTRIAL $162.00
INSTITUTIONAL $70.00
PAYMENT METHOD:
CASH/CHECK
CREDIT INSTITUTIONAL ONLY:
BANCROFT (PROMISSORY NOTE) LAND USE CATEGORY DESCRIPTION GF WEEKDAY AVG. TRIP WEEKEND AVG. TRIP
DEFER TO OCCUPANCY 4err� yICSL
''l l ` USE e r`Fi..'e t I RAE RATE
• BASIS: - li nt Q Lp pI [aL ref'r' S DyA � , z 11 co o1 Ti c.2 bu..k I nt .
CALCULATIONS: T I F = '7 `i' Iry bele/ r ` x t, teKikt Ave rat ivt 1 (Zak Law,°(.U 60CE/cry
4.2_11 , c 16 . )1 = 1�Q of Tr' d
Aye1, 69,4 VYA") to -t-r' -} Immol,klv. k --malt U+na.
- 4-r X 4.2
Clr re 5 uA.ts \V. 4 2' 1 , {-r , � ,
PROJECT TRIP GENERATION:
\Zy.01 4 1S-5.C° _ ► zzl.s 4 ,q 12.
FEE:
FOR ACCOUNTING PURPOSES
CNLY
ADDITIONAL NOTES:
ROAD AMT.:
3
71 F - IT TR N � AII p0
?REPARE; 3Y:
_ ('nl_l t %.-
4(21/99 ;:100nim4o vnsiMPACT.*oc form /t10
C. WAS i4NGTCN CCUNiY
•
COUNTYWIDE TRAFFIC IMPACT FEE
APPEAL INFORMATION
Attached is a copy of the Director's decision on this Traffic Impact Fee assessment or Traffic Impact Fee
Credit /Offset request.
This decision may be appealed and a public hearing held by filing a signed petition for review (appeal)
within fourteen (14) calendar days of the date written notice is provided (date mailed),
APPEAL PERIOD: Date mailed: 10 3t 9 (v to 5:OOPM on 11 - Y - (0
Appeal Due Date
A motion for reconsideration also may be filed within seven calendar days of the date written notice of
the decision is provided (see Section 208 of the Washington County Community Development Code). A
motion for reconsideration does not stop the appeal period(s) from running and is available only as an
extraordinary remedy for whern,a mistake of law or fact has occurred. A motion for reconsideration
requires a filing fee of $ (p 25 -CO .
This decision will be final if an appeal is not filed by the due date(s), and a motion for reconsideration is
not granted by the Director.
The complete file is available at C t rt? 0 \ t ( X 2 - C i` -U C �uJ (3\ kid •, ��
for review. {{ J S
A petition for review (appeal) must contain the following:
1. The name of the applicant and the relevant casefile /building permit /other development
permit number;
2. The name and signature of the petitioner filing the petition for review (appeal). If a
group consisting of more than one person is filing a single petition for review, one
individual shall be designated as the group's representative for all contacts with the
Department. All Department commur, atiors regarding the petition, including
correspondence, shall be with this representative;
3. A statement of the interest of the petitioner;
4. The date the nutice of decision was sent as specified in the notice;
5. The petition for review (appeal) shall state the relevant facts, applicable ordinance
provisions, and relief sought; and
6. The fee of $625.00 for Director's decisions being appealed to the Washington County
Hearings Officer.
For further appeal information contact: / OTAV1 L e NAIA) ( V
forml3
,A
COUNTYWIDE CITY OF TIGARD
TRAFFIC IMPACT FEE ORE GON
PAYMENT OPTION FORM
Date Site Address
Project Name Plan Check #
I realize that I must make a decision on payment of the Traffic Impact Fee (TIF) at this time. Therefore,
I request the following (choose whichever option or options are applicable):
❑ Cash or Check
❑ Credit Voucher
❑ Bancroft or Installment Payments
and/or
❑ The Ordinance allows for deferral of payment of the TIF until issuance of the occupancy permit
if the TIF is greater than $5,000. If the TIF meets this requirement, I also request this option.
I understand the TIF must be paid prior to issuance of an occupancy permit. I also understand
that the TIF will be recalculated based on the prevailing rates at the time of payment. Please
be advised that TIF rates may increase up to six percent each July 1st. This rate increase is not
subject to appeal.
OWNER/APPLICANT OWNER/APPLICANT
c: Building Permit File
Payment Option Notebook
h:Uogin\dats$Usub
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171 TDD (503) 684 -2772