Loading...
Plans / 9 V 5 2( e6t_ O ey 0 .61 oa CI C 7 — 0-36 3s f a = 3° /1-Yt— voo I/4 Ys" AL—e-p/itL—' 7 ?, -2 4'7 4-7/2-4-- ^ 74 `" = / Y 62, e5,4_0-_. - �? / 39/, 4 4._ ilk fuJL--tx u/teil 43/ -9 rte' 4/4-a_ , c v— , 4047 — C Yee ,4 4 ; Le■ Fa -) p 15 b 1 °° 15 // jeliO Electrical Contractors, Inc. April 13 , 1997 The City of Tigard 13125 SW Hall Blvd. Tigard , OR 97220 Attn. Inspector Rudd Re: Load calculation for the Roth Construction Co. for the two story R.W. building at 12570 SW 69 Ave. Tigard. Proposed Service: 600Amp 208V Three Phase One 200 Amp Main Brker Three Phase Panel for each Floor One 100 Amp Three Phase Fuse disconnect for Elevator Eq. First Floor Sq. footage 3,984 Second Floor Sq. footage 4,233 Total Sq. footage 8,217 Gen. Lt. Load: 8217 Sq.ft.x 4.5 VA = 36,976.50 VA Sign Circuit - 1200 VA Total Continuos load - 38,176 VA Receptacle Load: 66 Receptacles @ 180 VA each - 11,880 VA 10,000 VA @ 100% - 10,000 VA 1,880 VA @ 50% = 940 VA Total Receptacle Load - 10,940 VA Motor Loads: Elevator 20 HP @ 208 Three Phase = 12,896 VA Gas Heat HVAC 8 -3 Ton Single Phase units @ 26.7 FLA each. 26.7 Amps x 8 = 213.6 Amps = 44,928 VA Largest of the two = 44,928 VA Continuos load from above 38,176 x 25% = 47,720 VA Non Continuos load - 10,940 VA Largest Motor Load - 44,928 Total VA 103,588 VA 103,588VA divided x 208x1.73 = 287.74 Amps Thank You, 5" ',A Don Rife 1901 Northeast 134th Place • Portland, Oregon 97230 • (503) 293 -8243, (503) 257 -4855 (fax)