Loading...
Report (492) TM - -- � A VLMK Consulting Engineers AX 3933 SW KELLY AVENUE, PORTLAND, OREGON 97201 -4393 /3/'�( d _ > -`4 (503) 222 -4453 / FAX (503) 248 -9263 / vlmk It vlmk.com PRINCIPALS ALFRED H. VAN DOMELEN, P.E. JAMES E. KNAUF, P.E. GREGORY J. BLEFGEN, P.E. JOHN T. BROOKS HAVLIN G. KEMP, P.E. KIMBERLY A. SCHOENFELDER FIELD REPORT Date: September 2, 1999 Job No: 98145_ Project: Tigard Corporate Center ermit No: 99 -00234 Address: 12447 SW 69 Avenue tractor: Baugh Location: Tigard, Oregon, 97223 Owner: Specht Development Weather: Sunny Temp/Time: Appx.80° at 3:00 p.m. Present at Site: John Lawrence, Baugh Construction Barney Davis, Baugh Construction Jim Knauf, VLMK Engineers The following was noted: The primary purpose of this site visit was to work out a method of assembling the reinforcing cages and panel footing embeds. This is a fairly congested area with the panel embed anchors lapping the vertical column reinforcing. The following steps were mutually worked out to make the panels constructable without sacrificing any structural integrity. The embed anchorage does not have to fall within the column tie area. It is acceptable for the anchorage bars to be outside of the tied cage as long as the embed is reasonably centered on the column. The tie spacing will begin approximately 16- inches from the bottom of the column to allow embed anchorage to be lapped with the vertical column reinforcing. The embed angles themselves are sufficient to confine the reinforcing in this area. Cc: Specht Properties, Bob Burns Baugh Construction, Job Site Baugh Construction, Gordon Childress City of Tigard, Bob Poskin JEK:tdc ,`` MB [,r K:\Field Reports \Tigard Corp Ctr 9 -2.Doc MEMBER