May 17, 2000
Consulting Engineers
and Geoscientists
Specht Properties, Inc. Offices in Washington,
15400 Southwest Malian Way Oregon, and'Alaska
Beaverton, Oregon 97006
Attention: Mr. Bob Burns
Summary Completion Report
Tigard Triangle Project
Southeast 69th and Dartmouth
Tigard, Oregon
File No. 4217 -013-01
GeoEnginccrs has provided on-call geoteclmicat monitoring and testing services during
construction of the Tigard Triangle Project This letter summarizes our observations and testing
for the building foundation and associated site work. Geofingineera prepared a geotechaical
engineering report for this site titled "Report of Geoteclmical Engineering Services, Proposed
Tigard Triangle Development, Tigard, Oregon," dated May 8,1998.
A GeoEngineers representative observed stripping, subgrade preparation, and excavation for
the building between May 21, 1999 and June 14, 1999. The subgrade was proofiolled using
heavy construction equipment Based on our observations, the native soils containing vegetation
and roots were stripped and the building and paxidng area subgrades were prepared in accordance
with the project specifications and the recommendations in ow geotechnieal report.
A GeoFngineers representative observed placement and compaction of struetural fill to raise
site grades. Placed and compacted fill was 1 to 2 feet thick in the southeast portion of the site and
up to 18 feet in the northwest portion of the site. A GooEngineers representative observed
material types and conducted nuclear density testing and/or observed proofrof of in -place
material. GeoEngineers reviewed settlement data provided by Baugh Construction for the fill
placed in building areas. Based on our observations, the fill was placed and compacted in
accordance with project requirements and recommendations.
A eoEnginee s representative performed in place nuclear density tests on crushed rock base
placed beneath the floor slab, and in utility trenches. Areas where the test results indicated
inadequate relative compaction were generally reworked and =compacted. Based on ow testing
and observations, the subgrade and base rock hi the building pads were prepared in accordance
with project plans and specifications and the recommendations in ow geotechnical report
,Inc
7504 SW Bridgeport Rnad
Portland, OR 97224
Tcicptwne (503) 6249274
Fax (503) 620.5940
i
yy4 .. .
���� TP� N • "t..Pe1 �, r•i�� �111r � •'.�,, ; a . ,. , �'..� � J � -.. i�. � ,.rl� � . .•� �..
�d t41ll�•r' °:°r5', t• 4111 IINIM VIII . .. :� .,irtitif #01 - 0 4 Y iPi • 'lt.
08/10/00 THU 15:11 FAX 15034432291 Baugh:Tigard • 0 002
Specht Properties, Inc.
• • May 17, 2000
Page 2
GeoEngineers invol'iement during construction was limited to testing and observing activities
pertaining to geotechnical engineering. Our involvement did not include supervising or directing
the actual work of the • contractor, the contractor's employees or agents. We trust that this
information meets your current needs. Please call if you have any questions or if you need more
information. •
Yours very truly,
.1/40PRN GeoEngineers Inc.
• 1 o C. vela, P.E., Ph.D.
Project
:,Tri
ot 13.1
1 Cs: 610.E David L. Thielen, P.E.
Principal
JCV:DLT:oft
Document ID: 421701301CompltptLAoc
cc: Mr. John Lawrence
Baugh Construction Oregon
Geo6ngi File No. 4217 -013-01 -2130
08/10/00 THU 15:11 FAX 15034432291 Baush:T1gard fb001
r J
.
May 17. 2000 FI[ COPY
consulting Engineers
and Geosdenflsts
Specht Properties, Inc. affixes in Washington,
15400 Southwest Millikan Way Oregon, and Alaska
Beaverton, Oregon 97006
Attention: Mr. Bob Burns
Summery Completion Report
Tigard Triangle Project
Southeast 69th and Dartmouth
Tigard, Oregon
File No. 4217 -013-01
GeoEngincers has provided on-call geoteclmical monitoring and testing services during
construction of the Tigard Triangle Project. This letter summarizes our observations and testing
for the building foundation and associated site wok. GeaBngineers prepared a geotechnical
engineering report for this site titled "Report of Geoteelmical Engineering Services, Proposed
Tigard Triangle Development, Tigard, Oregon," dated May 8,1998.
A GeoEngineers representative observed stripping, subgrade preparation, and excavation for
the building between May 21, 1999 and nine 14, 1999. The subgrade was proofrolled using
heavy construction equipment Based on our observations, the native soils containing vegetation
and roots were stripped and the building and parking area subgrades were prepared in accordance
with the project specifications and the recommendations in our geotechnical report.
A GeoEngineers representative observed placement and compaction of structural fill to raise
site grades. Placed and compacted fill was 1 to 2 feet thick in the southeast portion of the site and
up to 18 feet in the northwest portion of the site. A GeoEngineers representative observed
material types and conducted . nuclear density testing and/or observed proofroll of in -place
material. GeoEngineers reviewed settlement data provided by Baugh Constriction for the fill
placed in building areas. Based on our observations, the fill was placed and compacted in
accordance with project requirements and ree0Mmendations.
A GeoEnginecrs representative performed in place nuclear density tests on crushed rock base
placed beneath the floor slab, and in utility trenches. Areas where the test results indicated
inadequate relative compaction were generally reworked and recomputed. Based on our testing
and observations, the subgradc and base rock in the building pads were prepared in accordance
with project plans and specifications and the recommendations in our geotechnical repeat
GeoEnghwers, Inc
7504 5W Bridgeport Road
Portland, OR 97224
Telephone (5o3) 6249274
fax (503) 620-5940
. +.•rr�c °7 1 rl
• � ., `.. � r���.it>Z #44�j�.�5Y1�1+�,��...' •�., ����s.r�r,t�.��i�ii�Ev�tl
- 08/10/00 THU 15:11 FAX 15034432291 Baugh:Tigard _l 002
• Specht Properties, Inc.
' May 17, 2000
Page 2
GeoEngineers involvement during constriction was limited to testing and observing activities
pertaining to geotecbnical engineering. Our involvement did not include supervising or directing
the actual work of the contractor, the contractor's employees or agents. We trust that this
information meets your current needs. Please call if you have any questions or if you need more
information.
Yours very truly,
.t 6 F t . Ge°l ngineaa Inc.
ois t---e --- „,e,-----
. . :.J.: vela, P.E., Ph.D.
12,, I titi• 13, Wa '
-IbLe.010 CI) (,) of ? L.
EXPtfi 6 i o• ap David L. Thielen, P.E.
Principal
JCV:DLT:mIo
Dooment m: 42170130lCo paptl.Aoc
cc: Mr. John Lawrence
Baugh Construction Oregon
GeoBngineers File No. 4217 -0I3-012I30