Permit • CITY OF TIGARD MECHANICAL PERMIT
SI DEVELOPMENT SERVICES PERMIT #: MEC1999 -00388
ll DATE ISSUED: 09/30/1999
13125 SW Hall Blvd., Tigard, OR 97223 (503) 639 -4171
PARCEL: 2S 101 AA -TTOOC
SITE ADDRESS: 12447 SW 69TH AVE
SUBDIVISION: TIGARD CORPORATE CENTER ZONING: MUE
BLOCK: LOT: 00C JURISDICTION: TIG
CLASS OF WORK: NEW FLOOR FURN: EVAP COOLERS:
TYPE OF USE: COM UNIT HEATERS: VENT FANS:
OCCUPANCY GRP: B VENTS W/O APPL: VENT SYSTEMS:
STORIES: 2 BOILERS /COMPRESSORS HOODS:
FUEL TYPES 0 - 3 HP: 2 DOMES. INCIN:
GAS 3 - 15 HP: COMML. INCIN:
MAX INPUT: BTU 15 - 30 HP: REPAIR UNITS:
FIRE DAMPERS ?: 30 - 50 HP: WOODSTOVES:
GAS PRESSURE: M 50 + HP: CLO DRYERS:
FURN < 100K BTU: AIR HANDLING UNITS OTHER UNITS: 31
FURN > =100K BTU: 2 <= 10000 cfm: GAS OUTLETS: 1
> 10000 cfm: 2
Remarks: Mechanical shell
Owner: FEES
TIGARD CORPORATE CENTER LP Type By Date Amount Receipt
15400 SW MILLIKAN WAY PRMT DST 09/30/19E $303.75 99- 318744
BEAVERTON, OR 97 PLCK DST 09/30/19E $75.94 99- 318744
5PCT DST 09/30/19E $21.26 99- 318744
Phone: Total $400.95
Contractor:
MACDONALD- MILLER COMPANY
1240 SE 12 TH
PORTLAND, OR 97214 REQUIRED INSPECTIONS
Gas Line Insp
Phone: 503 - 230 -8991 Mechanical Insp
Reg #: LIC 00063593 Heating Unt Insp
PLM 37 -64PB Duct Inspection
S.D. Shut -down
Final Inspection
ORIGINAL
This permit is issued subject to the regulations contained in the Tigard Municipal Code, State of Ore.
Specialty Codes and all other applicable laws. All work will be done in accordance with approved
plans. This permit will expire if work is not started within 180 days of issuance, or if work is suspended
for more than 180 days.' ATTENTION: Oregon law requires you to follow rules adopted in the Oregon
Utility Notification Center. Those rules are set forth in OAR 952 - 001 -0010 through OAR 952 - 001 -0080.
You may obtain pies • t : -' se or direct questions to OU • ,;callin ( ,�4• -9189.
Issue By: /i / _ % ..ij -Permittee Signature•__ I ` k i k
Call (503) 639-4 75 by 7:00 P.M. for inspections needed the next business day
.09/13+99 MON 14:39 FAX 503 598 1960 CITY OF TIGARD (002
•
Plan Check # 9 3CC
. CITY OF TIGARD Mechanical Permit Application i ,d By
13125 SW HALL BLVD. . Commercial and Residential Date Recd -
TIGARD, OR 97223 7
(503) 639 -4171, x304 � `' � PERM S� 8 Date to DST 9-2
Print sr Type Permit #MEC - - 5
Incomplete or illegible applications will net be accepted Called '1"
Name of DevebpmenUProject Description
T able 1A Mechanical Code
/ CDR Po Q ATE G6nJTFP Qty Price Amt
Job Street Address Suttee A) Permit Fee gi ., 16.00
Address /a ii 4/7 5& 67 rN 1) Furnace to 100,000 BTU
including ducts & vents see footnote 1,2 9.65 •
Bldgre City/State Zip 2) Furnace 100,000 BTU+
Cr . 71.41Rb of 17 ZI 3 including ducts & vents see footnote 1,2 iz 12.00 14"
Name (or name of business) 3) Floor Furnace
Owner SPE& N r PR oPCRT/ ES including vent see footnote 1,2 9.65 •
Marling Address 4) Suspended heater, wall heater
/C SW �, L/ or floor mounted heater see footnote 1,2 9.65
/(A/t/ it/n 5) Vent not included in appliance permit 4.75
ctty /State Zip Phone Check all that apply: *Boiler Heat. Air
BEAvEitr'V p/ f 7006 .vL- LZo Z For Items 6 -10, see or Pump Cond Qty Price Amt
Name (or name of business) footnotes 1,2 Comp
6) <3HP;absorb unit to C13°
•
Occupant Mailing Address 100-1 BTU 9.65
7) 3-15 HP;absorb unit
100k to 500k BTU 17.65
City/state zp Phone 8) 15-30 HP; absorb
unit .5-1 mil BTU 24.15
9) 30-50 HP; absorb
Contractor Name unit 1 -1.75 mil BTU 36.00
01 *c 01.. s 4 A? /LCE4 • 10) >50HP; absorb unit
Prior to permit Mailing Address >1.75 mil BTU
issuance, a copy S7 /1 S6J WO OP 11 Air handling unit to 10,000 CFM - 60.15
of all licenses dy/State Zip Phone
are required if rO(T .4-'a OR. L 2So 7.00
Y7 ( 12 ) Air handling link 10,000 CFM+
expired in COT Oregon Const Cont. Board Lice Exp. Date 2 11.85 Z3
database /3 (o/ZZ1 03 13) Non - portable evaporate cooler
Architect NamQ 7.00
Z. RS 14) Vent fan connected to a single duct
or Meiling Address .
/ /21 six) S41-MOa 15) Ventilation system not included in
appliance permit . 1
Engineer City/State As P hone 16) Hood served by mechanical exhaust .:
AMIT74 o/e 91zoS zil- /1Z1 _ 7.00
Describe work to be done: 17) Domestic incinerators
12.00
New • Repair O Replace with like kind: Yes O No O 18) Commercial or industrial type incinerator
Residential 0 Commercial 0 48.25
19) Repair units •
Additional information or description of work 8.40
20) Wood stove/gas FP /other units/clothe dryer/etc.
31 7.00 Ai/-
NOTE: For Commercial projects only; Units over 400 lbs. require 21) Gas piping one to four outlets / 2' �
structural gas calcs. See footnote 1 3.75 7
Type of fuel: oil 0 natural gas • LPG 0 electric • 22) More than 4 -per outlet (each) .75 �
• Minimum Permit' Fee $50.00 SUBTOTAL t,'1"_:'°z�t 3 ri'r 1'
1 hereby acknowledge that I have read this application, that the information _ 7% SURCHARGE cam`- = : r;i_..'ti ;1 • r • -" GO
given is correct. that I am the owner or authorized agent of PLAN REVIEW 25% OF SUBTOTAL 1 I i ' ii9 .4
the owner, that plans submitted are in compliance with Oregon State laws. Required for ALL commercial permits only 'a z¢ ,�' I -� G 1 _
wn TOTAL = ' w; tti O` i '-10
Signature of Owner /Agent Date ';t �aG, i .�" O` .
�j
LL ether Inspections and Fees:
�,r... b- . - 040 'i9�l Viii 99 1. Inspections outside of normal business hours (mininum charge -two
Contact Person Name Phone hours) $50.00 per hour
2. Inspections for which no fee is specifically Indicated (minimum
igoei 44) ,* 4 1 "- t ti e4- 2 3 b- $ charge -half hour) $50.00 per hour
Foonotes for commercial projects only: 3. Additional plan review required by changes, additions or revisions to
1. Provide full schematic of existing and proposed gas line and pressure. plans (minimum charge - one -half hour) $50.00 per hour
2. Provide drawings to scale showing existing and proposed mechanical 'State Contractor Boiler Certification required
units.
**Residential A/C requires site plan showing placement of unit
•
l :lmechperm.doc rev 7/19/99
TI G-A1R 7
Form 4a Project Name: coR (ORATE cT X Page: I
SYSTEMS - GENERAL
Exceptions 1. Exceptions (Section 1313)
Discussion of CI No HVAC. The building plans do not call for an HVAC system. Skip to Item 12 below.
qualifying excep- ❑ Exception. The building or part of the building qualifies for an exception from HVAC code
lions on page 4 -14 requirements. The applicable code exception is Section 1313, Exception . Portions of the
building that qualify:
See page 4 -14 fora 2 • Simple or Complex Systems (Section 1313.2 or 1313.3)
discussion of simple ❑ Simple System. The planned HVAC system qualifies as a Simple System. If true, complete this
vs. complex form (4a) and equipment efficiency worksheets as required. Form 4b is not required.
systems.
Complex System. The planned HVAC system is a Complex System. Complete this form (4a),
Form 4b and equipment efficiency worksheets as required.
Exceptions 3. Economizer Cooling (Section 1313.1.2)
Complex Systems CI No Cooling. The building plans do not call for a new fan system with mechanical cooling.
may claim the same Ai Complies. The new fan system has an air economizer capable of modulating outside -air and
exceptions allowed return -air dampers to provide up to 85 percent of the design supply air as outdoor air.
for Simple Systems,
plus three excep- ❑ Exception — Simple Systems. The new fan system qualifies for an exception. The applicable
tions allowed in code exception is Section 1313.1.2, Exception , or Section 1313.2.1. Portions of the
Section 1313.1.2. building that qualify:
See page 4 -15 for a
discussion of these ❑ Exception — Complex Systems. The new fan system qualifies for an exception. The applicable
exceptions. code exception is Section 1313.1.2, Exception , or 1313.3.1, Exception . Portions of
the building that qualify:
4. Economizer Cooling — Overpressurizing (Section 1313.1.2)
❑ No Economizer. The building plans do not call for a new fan system with an economizer.
■
} Complies. The drawings specifically identify a pressure relief mechanism for each fan system
that will exhaust the extra air introduced by the economizer, and the economizer system is
capable of providing partial cooling even when additional mechanical cooling is required to meet
the remainder of the load.
5. System and Zone Controls (Sec. 1313.1.3.1 8s 1313.1.3.2)
Complies. All new HVAC systems include at least one temperature control device responding to
temperatures within the zone.
❑ Exception. The new HVAC system qualifies for an exception from the zone control require -
Exceptions ments. The applicable code exception is Section 1313.1.3.2, Exception 1 and 2. Portions of the
Discussion of building that qualify:
qualifying excep-
tions on page 4-16. 6. Control Capabilities (Sec. 1313.1.3.2.1)
Complies. Zone thermostats are capable of being set to the temperatures described in Sec.
1313.1.3.2.1. Where used to control both heating and cooling, zone controls shall be capable of
providing a temperature range or deadband of at least 5 degrees F within which the supply of
heating and cooling energy to the zone is shut off or reduced to a minimum.
❑ Exception. The building qualifies for an exception to the deadband requirements. The applicable
code exception is Section1313.1.3.2.1, Exception
(10/98) Forms & Worksheets 4
Form 4a (cont.) Project Name: Page: 2
SYSTEMS - GENERAL
7. Off -hour Controls - HVAC Systems (Section 1313.1.3.3)
X Complies. All new HVAC systems are capable of automatic setback or shutdown during periods
of non -use or alternate use of the space served by the system.
❑ Exception. Equipment has full load heating demands of 2 kW (6,826 Btu/hr) or Tess and is
controlled by a readily accessible manual off -hour control.
8. Off - hour Controls — Supply and Exhaust Systems (1313.1.3.3)
J Complies. Plans require that outdoor air supply and exhaust systems have a means of auto-
matic (either motorized or gravity damper) volume shutoff or reduction during periods of non -use
or alternate use of the space served by the system.
❑ Exception. The building qualifies for an exception to the requirement for automatic shutoff or
reduction. The applicable code exception is Section 1313.1.3.3, Exception
9. Heat Pump Controls (Section 1313.1.3.4)
No Heat Pump. The plans /specs do not call for a new heat pump.
❑ Complies. All new heat pumps equipped with supplementary heaters are controlled as required
in Section 1313.1.3.4.
10. Equipment .Performance (Section 1313.1.4)
❑ No New HVAC Equipment. The building plans do not call for new electrical HVAC equipment,
combustion heating equipment or heat - operated cooling equipment.
Complies. All new HVAC equipment has efficiencies not less than those required by the code.
The following equipment efficiency worksheets are attached: 4
11. Duct Insulation (Section 1313.2.2 & 1313.3.2)
❑ No Ducts. The building plans and specifications do not call for new HVAC ducts or plenums.
❑ Simple System: Complies. The plans and specifications call for a Simple System, and all
exterior supply /return air - handling ducts and plenums and all outside air ducts are insulated as
required by Section 1313.2.2.
Jai Complex System: Complies. The building plans /specs call for a Complex System, and all air -
handling ducts and plenums are insulated as required by Sec. 1313.3.2.
12. Piping Insulation (Section 1314)
Exceptions ❑ No New Piping. The building plans and specifications do not call for new piping serving a
heating or cooling system or part of a circulating service water heating system.
Discussion of
qualifying excep- jg Complies. All new piping serving a heating or cooling system or part of a circulating service
tions on page 4 -18 water heating system complies with the requirements of the Code, Section 1314.1.
❑ Exception. New piping qualifies for the following exception: Section 1314, Exception _ .
13. Service Water Heating (Section 1315)
❑ No New Water Heating. The building plans and specifications do not call for new water heaters,
hot water storage tanks, service hot water distribution systems, swimming pools or spas.
Exceptions Complies. All new water heaters, hot water storage tanks, service hot water distribution sys-
Discussion of tems, swimming pools or spas comply with the requirements of the Code.
qualifying excep- ❑ Exception. The applicable code exception is Section , Exception . Portions
dons on page 4 -18 of the building that qualify:
4 -2 Forms & Worksheets (10 /s8)
Form 4b Project Name: Page: 3
• COMPLEX HVAC SYSTEMS
•
1. Simple or Complex System (Sections 1313.2 & 1313.3)
Note: This form is required for complex systems only. If your plans qualify as a simple system
as defined by the code, you can skip this form.
2. Simultaneous Heating and Cooling (Section 1313.3.3.1)
❑ No Cooling. The building plans and specifications call for a heating -only system.
❑ Complies. Temperature and humidity controls are capable of operating in sequence the supply
of cooling and heating energy to the zone as required by the code. Controls for this purpose are
Exceptions detailed in the plans and specifications on:
A Exception. The building or part of the building qualifies for an exception from the code. The
Discussion of applicable code exception is Section 1313.3.3.1, Exception: 1 . Portions of the building that
qualifying excep- qualify: Ew tire.
tions on page 4 -20.
3. Humidity Controls (Section 1313.3.3.2)
Xr No Moisture Added to Building. The building plans do not call for a means to add moisture to
maintain specific humidity levels.
❑ Complies. All new humidity control systems are equipped with a humidistat as required by
code.
Air 4. Air Transport Energy (Section 1313.3.4.2 & Table 13 -L)
Transport Complies. The energy demand of all HVAC fan systems meets code requirements. Complete
Energy the form below.
See Table 13 -L, Fan VAV or Max
page 4 - 24, for System Constant Design Motor Allowed Where noted in
maximum horse ID Description Volume Airflow (cfm) HP HP plans /specs
power allowed.
, 4( RObFTCP A HU VAV 7 2, oe7n 30 4-0 mac./
,-4G 2 Ra)FTOf A-WV VA- V 24 4-0 50 /Irl D .O
•
❑ Exception. The applicable code exception is Section 1313.3.4.2, Exception:_ . Portions of the
building that qualify:
5. Motor Efficiency (Section 1313.3.5 & Table 13 -M)
❑ Not Regulated. There are no NEMA Design A & B squirrel cage, T -frame induction, perma-
nently -wired polyphase motors of one horsepower or more which serve built -up HVAC systems
(regulated motors).
Exceptions A' Complies. The efficiency of all regulated motors meets code requirements.
Discussion of ❑ Exception. The applicable code exception is Section 1313.3.4.2, Exception:_ . Portions of the
qualifying excep- building that qualify:
tions on page 4-22.
6. Variable Speed Drives (Section 1313.3.5.1)
❑ Not Regulated. The building plans and specifications do not call for fan and pump motors 25
horsepower and greater that serve variable -flow air or liquid systems.
Complies. All fan and pump motors 25 hp and greater which serve variable -flow air or liquid
systems are controlled by a variable -speed drive.
(1 0/98) Forms & Worksheets 4 -3
,= Worksheet 4a Project Name: Page: 4_
UNITARY AIR CONDITIONER - AIR COOLED
Equipment (a) (b) (c) (d) (e)
Discussion of Proposed Performance
equipment ratings
and equipment Cooling Seasonal Compliance
definitions on page Capacity Steady or Schedule
4 -f9 Equip. ID Model Designation (Btu/h) State Part Load (A -E)
AC - I 5F1-1 Pt 604- 637 R'.O G
AC -2 5FHFC 60 - G5l, q•D G
Required Indicate source of information
Documenta- ARI Unitary Directory, Section AC, page :
. tion , Applied Products Directory, Section ULE, page :
Product data (Attach data fumished by the equipment supplier, i.e., 'cut sheets")
1
Code Compli- Cooling Capacity (Btu /h) Minimum Rating
Required ance Equipment Type -
Efficienc Schedule Over But not Steady State Seasonal or
over - Part Load
0 65,000 na 9.7 SEER
This schedule of Single Package Without a 65,000 135,000 8.9 EER 8.3 IPLV
equipment to r m an= A Heating Section
cies was reformatted g 135,000 760,000 8.5 EER 7.5 IPLV
from the code, Table 760,000 - 8.2 EER 7.5 IPLV
13 - G. 0 65,000 na 10.0 SEER
B Split System Without a Heating 65,000 135,000 8.9 EER 8.3 IPLV
Section 135,000 ' 760,000 8.5 EER 7.3 IPLV
760,000 - 8.2 EER 7.3 IPLV
0 65,000 na 10.0 SEER
C Single Package With a Heating 65,000 135,000 8.9 EER 8.3 IPLV
Section 135,000 760,000 8.3 EER 7.3 IPLV
760,000 - 8.0 EER 7.3 IPLV
0 65,000 na 10.0 SEER
D Split System With a Heating 65,000 135,000 8.9 EER 8.3 IPLV
Section 135,000 760,000 8.3 EER 7.3 IPLV
760,000 - 8.0 EER 7.3 IPLV
E Condensing Unit Only 135,000 - 9.9 EER 11.0 IPLV
4 - Forms & Worksheets (10 /98)
_ General
Data
Table 9-1 - General Data - 50-75 Ton
50 Ton 55 Ton 60 Ton 70 Ton 75 Ton
Compressor Data' Standard High Capacity
Number /Size (Nominal) 2/10.2/15 Ton 4/15 Ton 4/15 Ton 4/10, 2/15 Ton 4/10, 2/15 Ton 2/10, 4/15 Ton
Model Scroll Scroll Scroll Scroll Scroll
Unit Capacity Steps ( %) 100/80/60/30 100/75/50/25 100/75/50/25 100/72/44/22 100/72/44/22 100/69/38/19
RPM 3450 3450 3450 3450 3450
Evaporator Fans
Number / Size /Type 2/20' /FC 2/20"/FC 2/22"/FC 2/22"/FC 2/22"/FC
Number of Motors 1 1 1 1 1
Hp Range T /r30 T /r30 1040 10-40 10-40
Cfm Range' 10000 -22500 12000 -24000 14000 -27000 16000 -27000 16000 -27000
ESP Range - (In. WG) 0.25 -4.0 0.25-4.0 0.25-4.0 0.25 -4.0 0.254.0
Exhaust Fans 50% 100% 50% 100% 50% 100% 50% 100% 50% 100%
Number /Size/Type 1/18 " /FC 2/187FC 1/18"/FC 2/18"/FC 1/20' /FC 2/20' /FC 1/201FC 2/20 " /FC 1 /20'/FC 2/20"/FC
Hp Range 5-7.5 5-15 5-7.5 5-15 5-7.5 5-20 5-7.5 5 -20 5 -7.5 5 -20
Cfm Range 3000- 11000 9000- 20000 3000-11000 10000 - 21500 4000-13000 12000- 27000 4000-13000 12000-27000 4000 -13000 12000-27000
ESP Range - (In. WG) 0.25 -1.4 0.2 -2.0 0.25-1.4 0.2 -2.0 0.25-1.4 02-2.0 0.25 -1.4 0.2 -2.0 0.25 -1.4 0.2 -2.0
Condenser Fans
Number / Size /Type 6/26 "/Prop 6/26"/Prop 6/267Prop 6/26 " /Prop 6/26" /Prop
Hp (Each) 1.0 1.0 1.0 1.0 1.0
Cfm 36600 36600 40800 40800 40800
Cycle/Phase 60/3 60/3 60/3 60/3 60/3
Evaporator Coil - Standard
Size (Ft. 37.9 37.9 43.1 43.1 43.1
Rows/Fin Series 2/144 2/144 2/156 2/168 4/144
Tube Diameter /Surface %/Enhanced %/Enhanced ' /'Enhanced ' /z/Enhanced ' /2/Enhanced
Evaporator Coil - High Capacity
Size (Ft 37.9 37.9 43.1 43.1
Rows/Fin Series 4/144 4/144 4/144 NA 4/144
Tube Diameter /Surtace ' /2/Enhanced ' /2/Enhanced /%/Enhanced %/Enhanced
Condenser Coil (Aluminum Fins)
Size (Ft. 70.0 70.0 88.0 88.0 88.0
Rows /Fin Series/Tube Diameter 3/144/ 3 /e 3/ 144 /'4 3/144/ 3/144/ 3/144/' /
Copper Condenser Fins ( Optional) 3/144/ 3/ 144 / 3 /" 3/144/ 3/144/ 3 /, 3/144/ 3 /,
Electric Heat
KW Range' 70-190 70- 190 90 -190 90 -190 90-190
Capacity Steps: 3 3 3 3 3
Natural Gas Heat
Standard Gas Heat
Low Heat lnput 500 500 500 500 500
High Heat lnput 850 850 850 850 850
Standard Heating Capacity Steps: 2 2 2 2 2
Modulating Gas Heat
High/Low Heat - Limited Modulation' 33% 33% 33% 33% 33%
Heat Exchanger Type Standard Standard Standard Standard Standard
High/Low Heat - Full Modulation 100% 100% 100% 100% 100%
Heat Exchanger Type High Grade, High Grade, High Grade, High Grade, High Grade,
Stainless Steel Stainless Steel Stainless Steel Stainless Steel Stainless Steel
Hot Water Coil
Size (Inches) 42x66x2 Row 42x66x2 Row 42x90x2 Row 42x90x2 Row 42x90x2 Row
Type Type W, Prima Flo Type W, Prima Flo Type W, Prima Flo Type W, Prima Flo Type W, Prima Flo
High Heat ( Fins/Ft) 110 110 110 110 110
Low Heat (Fins/Ft) 80 80 80 80 80
Steam Coil
Size (Inches) 30x66x1 Row 30x66x1 Row 30x90x1 Row 30x90x1 Row 30x90x1 Row
12x66x1 Row 12x66x1 Row 12x90x1 Row 12x90x1 Row 12x90x1 Row
Type Type NS Type NS Type NS Type NS Type NS
High Heat (Fins/Ft) 96 96 72 72 72
Low Heat (Fins/Ft) 42 42 42 42 42
Filters
Panel Filters
Number /Size (Inches) 20 - 20x25x2 20 - 20x25x2 35 - 16x20x2 35 - 16x20x2 35 - 16x20x2
Face Area (Ft 69.4 69.4 77.8 77.8 77.8
Bag Filters
Number /Size (Inches) 3 - 12x24x19 3 - 12x24x19 6 - 12x24x19 6 - 12x24x19 6 - 12x24x19
9 - 24x24x19 9 - 24x24x19 8 - 24x24x19 8 - 24x24x19 8 - 24x24x19
Cartridge Filters 3 - 12x24x12 3 - 12x24x12 6 - 12x24x12 6 - 12x24x12 6 - 12x24x12
9 - 24x24x 12 9 - 24x24x12 8 - 24x24x12 8 - 24x24x12 8 - 2444x12
Prefilters (For Bag & 3 - 12x24x2 3 - 12x24x2 6 - 12x24x2 6 - 12x24x2 6 - 12x24x2
Cartridge) 9 - 24x24x2 9 - 24x24x2 8 - 24x24x2 8 - 24x24x2 8 - 24x24x2
Face Area (Ft 42.0 42.0 44.0 44.0 44.0
Standard Unit Min. Outside Air Temperature For Mechanical Cooling
Without Hot Gas Option 35 F 40 F 30 F 45 F 45 F
With Hot Gas Option 35 F 40 F 30 F 45 F 45 F
Low Ambient Option Min. Outside Air Temp
Without Hot Gas Option OF OF OF OF OF
With Hot Gas Option 10 F 10 F 10 F 10 F 10 F
Notes: 4. The firing rate of the unit can vary from 33% of the Heater Mbh up to
1. For dm values outside these ranges, refer to RT- EB-104. the nameplate rating of the unit.
2. Refer to Table 35-3 for availability of electric heat kw ranges by 5. The firing rate of the unit can vary from pilot rate of 125,000 Btuh up
voltage. 9 to the nameplate rating of the unit.
3. 50-75 Ton models are dual circuit
CITY OF TIGARD BUILDING INSPECTION DIVISION ST
24 -Hour Inspection Line: 639 -4175 Business Line: 639 -4171
� @I:up
Date Requested td't / t`'Ff q 9 AM PM BLD
Location l ; 69 4/-e.-, Suite a //99-0 3ST
Contact Person NIYIS f'(0 fYI S6 Ph Sla'o d PLM
Contractor /� Ph SWR
BUILDING Tenant/Owner f "A _ ati r - ELC
Retaining Wall c> U ELR
Footing Access:
Foundation FPS
Ftg Drain SGN
Crawl Drain Inspection otes: CIAALS 1 1 O 4 6 ,,v1/./
Slab SIT
Post & Beam ^ n T LJ
Ext Sheath /Shear (/ � wV i
Int Sheath/Shear
Framing /� ��
Insulation I W ( (/\/` �' e a-3 Drywall Nailing � c, J
Firewall
Fire Sprinkler ti..) .L3U S `��
Fire Alarm
Susp'd Ceiling — 1
Roof
L 1/1.,0 ( -W\ S ZzA-4
Misc:
Final
PASS PART FAIL n
PLUMBING / �� 1.r'G-y\� Q 1n'�
Post & Beam g■iN Y iL Under Slab l S r Lg,�
Top Out
Water Service ti/\S /� .
Sanitary Sewer
Rain Drains }� 1 �\ .Q� �� /�
Final
PAS T FAIL '�J � _e_ �L/�/LJ1 � �!`� r V 1 o
MECHANI /C IJL �-0•��
ough In W C(S '`-%
Gas Line
Smoke Dampers VAA.5 1
Final
PASS PART
ELECTRICAL
Service
Rough In
UG /Slab
Low Voltage
Fire Alarm
Final
PASS PART FAIL
SITE
Backfill/Grading
Sanitary Sewer
Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd
Catch Basin [ ] Please call for reinspection RE: [ ] Unable to inspect - no access
Fire Supply Line
ADA /f ,�/� /
Approach/Sidewalk
Date a 1 � ( Inspector ! (/1 (A" V Ext
Other
Final
PASS PART FAIL DO NOT REMOVE this inspection record from the job site.
CITY OF TIGARD BUILDING INSPECTION DIVISION
MST 1.
24 -Hour Inspection Line: 639 -4175 Business Line: 639 -4171
J BUP
Date Requested /6(( cl 9 AM PM BLD
Location /a-- ? Su/ (a9.(4' 4)-e- 1� Suite MEC (Q5 5 ' 3 kk
Contact Person � kr�S /SW/ SQK -� /P �aJ d P ld- 1 5 i � 7 - - � ( PLM
Contractor Ph SWR
BUILDING Tenant/Owner 0 Carr ell/ ELC
Retaining Wall ELR
Footing Access:
Foundation FPS
Ftg Drain SGN
Crawl Drain Inspection Notes:
Slab SIT
Post & Beam
Ext Sheath /Shear
Int Sheath /Shear
Framing
Insulation
Drywall Nailing
Firewall
Fire Sprinkler
Fire Alarm
Susp'd Ceiling / e)-D
Roof
Misc:
Final
PASS PART FAIL
PLUMBING
Post & Beam
Under Slab
Top Out
Water Service
Sanitary Sewer
Rain Drains
Final
PASS PART FAIL
MECHANICAL
Post & Beam
ough In / ST
Gas ine
Smoke Dampers / 7OLN
Final
PASS PART FAIL
ELECTRICAL
Service
Rough In
UG /Slab
Low Voltage
Fire Alarm
Final
PASS PART FAIL
SITE
Backfill/Grading
Sanitary Sewer
Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd
Catch Basin [ ] Please call for reinspection RE: [ ] Unable to inspect - no access
Fire Supply Line
ADA / Ext
Inspector Approach /Sidewalk
Date / L/ b /Q Y' �.,
Other �/ l
Final
PASS PART FAIL DO NOT REMOVE this inspection record from the job site.