Report (610) Main Office Branch Office
P.O. Box 23814 4060 Hudson Ave., NE
Tigard, Oregon 97281 Salem, OR 97301
Carlson Testing, Inc. Phone (503) 684-3460 4-0 Phone (503) 589-1252 30
FAX (503) 68954 FAX (503) 589-19
January 10, 2000 "� C) i / ( G / -60 Z3
#99- 2536B.CTI RECEIVED
FIELD TESTING REPORT - FIREPROOFING DENSITY JAN 13 2000
DATE RECEIVED: December 21, 1999 BY:
PROJECT: Tigard Corp Center - Building C
ADDRESS: 12259 SW 69th
PERMIT: BUP 1999 -00233
INSPECTOR: B. Baty
Gentlemen:
CTI representative obtained one (1) fireproofing density sample on December 21, 1999.
Testing was completed on January 5, 2000. The method of sampling and testing was UBC
STD 7 -6. Following are the results:
FIREPROOFING - UBC STD 7 -6:
Material Type: MK 6 Monokote
Location: 2 " Floor Beam (W18 x 40)
DRY DENSITY: 28.8 pcf.
Our reports pertain to the material tested /inspected only. Information contained herein is not to
be reproduced, except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this
office.
Respectfully submitted,
CARL TE NC.
T Toiler
aboratory Manager
kk
cc: Specht Development Inc - Bob Bums
City of Tigard Building Department
Baugh Construction Company
LRS Architects
VLMK
Wordfabfab"p/2536B
Main Office Branch Office
P.O. Box 23814 4060 Hudson Ave., NE
Tigard, Oregon 97281 Salem, OR 97301
C arlson Testing, Inc. FAX (503) 68954 Phone
FAX (503) 589 1309
January 10, 2000
#99- 2536A.CTI
FIELD TESTING REPORT - FIREPROOFING DENSITY RECEIVED
DATE RECEIVED: December 21, 1999 JAN 1 3 2000
PROJECT: Tigard Corp Center - Building B
ADDRESS: 12259 SW 69th
PERMIT: BUP 1999 -00234
INSPECTOR: B. Baty
Gentlemen:
CTI representative obtained one (1) fireproofing density sample on December 21, 1999.
Testing was completed on January 5, 2000. The method of sampling and testing was UBC
STD 7 -6. Following are the results:
FIREPROOFING - UBC STD 7 -6:
Material Type: MK 6 Monokote
Location: 2 " Floor Beam (W12 x 19)
DRY DENSITY: 25.0 pcf.
Our reports pertain to the material tested /inspected only. Information contained herein is not to
be reproduced, except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this
office.
Respectfully subm - d,
CARL TE C.
Toiler
Laboratory Manager
kk
cc: Specht Development Inc - Bob Bums
City of Tigard Building Department
Baugh Construction Company
LRS Architects
VLMK
Word/labfabrtp/2538A
•
Main Office Salem Office Bend Office
P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918
Tigard, Oregon 97281 Salem, OR 97301 Bend. OR 97708
Carlson Testing Inc. Phone (503) 684-3460
FAX (503) 684 -0954 Phone (503) 589 -1252 Phone (541) 330 -9155
FAX (503) 589 -1309 FAX (541) 330 -9163
April 17, 2000
T9902536.A. CTI
Permit No. BUP1999 -00234
FIELD INSPECTION REPORT
DATES COVERED: April 13, 2000
APR i '4100 - - -
PROJECT: Tigard Corporate Center — Bldg B BY '
ADDRESS: 12259 SW 69 Tigard, OR
INSPECTOR: B. Baty COP #728, OBOA#411
04- 13 -00: CTI representative was onsite to inspect welding of reinforcement of the joists under new
mechanical unit at grid 4/B. The welding of T24 was per detail C and T39 was per details A, B, and C
of engineer's fix and AWS. Welding was by certified welder with approved WPS.
Our reports pertain to the materials inspected /tested only. Information contained herein is not to be
reproduced, except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
il) CARLSON TESTING, 1:` C.
k
cdtu OFFICER
Chief Executive Officer
BB /sab
cc: Specht Development, Inc. — Bob Burns
City of Tigard Building Dept.
Baugh Construction Co.
LRS Architects
VLMK
•
Carlson Testing, Inc. & inspection Related Tests
Geotechnical Consulting
REPORT OF6X 1.2 CONCRETE TEST SPECIMENS MA Y 0 9
2QQQ P.O. Box 23814
Test Methods: ASTM C172/C1231/C39/C31/C1064/C143 Ph one (503) 6843460
iBY Tigard, Oregon 97281
FAX # 684 -0954
Date Molded: 04/27 20 00 Job No. T9902536A Permit No: B 199 - 0234
Client: SPECHT DEVELOPMENT INC — BOB BURNS
Project: TIGARD CORPORATE CENTER — BLDG 8
Address: 12259 SW 69TH TIGARD OR
Contractor: BAUGH CONSTRUCTION CO Sub Contractor:
Concrete supplier: ROSS ISLAND SAND & GRAVEL Truck No. 75 Ticket No. T182814
Cast By:
0 . V I CK Cu. Yds. 9 OF 13 Load No
CLOUDY 57
Weather: Temp. High: Temp. Low:
FOOTINGS GENERATOR BUILDING. TEST AT FOOTINGS NORTH SIDE
Location of Placement:
GENERATOR BUILDING.
Test Time: 12:20 Concrete Temp: 66
3000 28 4° I
Strength Requirement: PSI @ days Slump Cement Type
3010B
Mix NoJNo. Sacks Air Content Max. Aggregate
Admix. Amount: Brand: - Admix. Amount: Brand:
Set Test@ Register Date Date Total Area Unit Report Tested
No. Days Number Rec'd Test Load PSI No. By
7 1290 04/28 05/04 74,600 28.27 2640 AF
28 1290 04/28 05/25
28 1290 04/28 05/25
HOLD 1290 04/28
•
Remarks:
cc:: CITY OF TIGARD BUILDING DEPT / j� -
BAUGH CONSTRUCTION CO ." //
LRS ARCHITECTS �'
VLMK
LABORATORY MANAGER
Reviewed by:
Our report pertains to the material tested/inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office.
Main Office Salem Office Bend Office
P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918
Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708
Carlson Testin Inc. Phone (503) 684 -3460
FAX (503) 684 -0954 Phone (503) 589 -1252 Phone (541) 330 9155
FAX (503) 589 1309 FAX (541) 330 -9163
April 28, 2000 RF'R!VFD
T9902536.A.CTI
Permit No. BUP1999 -00234 / BUP2000 -00060 MAY 0 2 2000
INSPECTION REPORT IBY:
DATES COVERED: April 27, 2000
PROJECT: Tigard Corporate Center — Bldg B
ADDRESS: 12259 SW 69 Tigard, OR
INSPECTOR: D. Vick COP #722, OBOA#424
04- 27 -00: Inspected rebar in generator wall footings. A -3000 psi concrete mix #3010B was placed by
chute and concrete was consolidated by vibrator. Approximately (13) cubic yards were placed. Cast
one set of (4) 6x12 samples. Rebar, placement, and concrete were in compliance with approved plans
and specifications.
Our reports pertain to the materials inspected /tested only. Information contained herein is not to be
reproduced, except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
ir Respectfully submitted,
ARLSO TESTING, I 4 .
CHIEF EXt -C,
Douglas W. Leach
Chief Executive Officer
DV /sab
cc: Specht Development, Inc. — Bob Burns
City of Tigard Building Dept.
Baugh Construction Co.
LRS Architects
VLMK
Main Office Salem Office Bend Office
P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918
Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708
Carlson Testing Inc. Phone (503) 684-3460 Phone (503) 589 -1252 Phone (541) 330 -9155
FAX (503) 684 -0954 FAX (503) 589 -1309 FAX (541) 330 -9163
Special Inspection
FINAL SUMMARY LETTER
May 1, 2000 tit T9902536A
City of Tigard RFC 1F. -D d»
i
13125 SW Hall Blvd., MAY 0 2 2000
Tigard, OR 97223 -8199
BY
Attn: Building Department
Re: Tigard Corporate Center — Building B
12259 SW 69 Tigard, OR
Permit No.: BUP1999 -00234
Dear Sir or Madam:
This is to certify that in accordance with Section 1701 of the Uniform Building Code and Chapter 24.20,
Title 24, we have performed special inspection of the following item(s) per our inspection reports only:
Reinforcing Steel
Concrete — Compressive Strength Testing
Installation of Wedge Anchors
Structural Steel — Shop and Field
Fireproofing
All inspections and tests were performed and reported according to the requirements of Project Documents
and, to the best of our knowledge, the work was in conformance with the approved plans and specifications,
approved change orders and applicable workmanship provisions of the State Building Code and Standards,
as well as the structural engineer's design changes, approvals and verbal instructions.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be
reproduced, except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respe, tfull 1 submitted,
CARL:.ON ESTING, INC.
1
Jame • .�' etpas
Qualit �� -- urance Manager
JFH:jdk
cc: Specht Development, Inc. — Bob Burns
Baugh Construction Company
LRS Architects
VLMK
P:\WORD REPORTSWINLTR\T9902538A
Main Office Salem Olfioe Bend Office
P.O. Box 23814 4060 Hudson Ave., NE P.O. Boar 7918
Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708
Carlson Testing, Inc. AX ( ;' 4 Phone b0 }x ;309 AX (641) 330 -916
Special Inspection
FINAL SUMMARY LETTER
May 1, 2000
T9902538A
City of Tigard
13125 SW Hall Blvd.,
Tigard, OR 97223-8199
Attn: Building Department
Re: Tigard Corporate Center — Building B
12259 SW 69 Tigard, OR
Permit No.: BUP1999 -00234
Dear Sir or Madam:
This Is to certify that in accordance with Section 1701 of the Uniform Building Code and Chapter 24.20,
Title 24, we have performed special inspection of the following item(s) per our inspection reports only:
fleinforcing Steel
Co crete — Compressive Strength Testing
Irallation of Wedge Anchors
Structural Steel — Shop and Field
Ffieproofing
All inspections and tests were performed and reported according to the requirements of Project Documents
and, to the best of our knowledge, the work was in conformance with the approved plans and specifications,
approved change orders and applicable workmanship provisions of the State Building Code and Standards,
as well as the structural engineer's design changes, approvals and verbal instructions.
Our reports pertain to the material tested/inspected only. Information contained herein is not to be
reproduced, except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
•
Respe II 1 submitted,
CAR LON STING, INC.
Jame • .�!' etpas
Qual ranee Manager
JFH:jdk
cc: Specht Development, Inc. — Bob Bums
Baugh Construction Company
LRS Architects
VLMK
plwommEpogroveRcroonssak
Main Office Salem Office Bend Office
P.O. Box 23814 4060 Hudson Ave., NE P.O. Box 7918
Tigard, Oregon 97281 Salem, OR 97301 Bend, OR 97708
Carlson Testing Inc • Phone (503) 684-3460 Phone (503) 589 -1252 Phone (541) 330 -9155
FAX (503) 684 -0954 FAX (503) 589 1309 FAX (541) 330 -9163
May 8, 2000 ' ��1�
T9902536.A.CTI ' MAY 1 Q
Permit No. BUP1999- 00234/00507 1 2000
EiY:
INSPECTION REPORT
DATES COVERED: May 5, 2000
PROJECT: Tigard Corporate Center — Building B
ADDRESS: 12259 SW 69th — Tigard, OR
INSPECTOR: G. Watson, COP #643
05- 05 -00: Inspected CMU construction of generator enclosure walls. Contractor provided
cleanouts at every vertical bar. Clean outs were found to be clean and closed prior to grout
placement. Contractor grouted walls full height 0 -12'. Grout consolidated by vibration.
Masonry reinforcement and grout placement conform to RFI details provided by the project
engineer. Test prisms cast.
Our reports pertain to the materials inspected/tested only. Information contained herein is not to
be reproduced, except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this
office.
Respectfully submitted
CARL IN TESTIN C.
._.. '..i._ ,Y-:, i e
CHIEF EXECUTIVE OFFICER
Douglas W. Leach
Chief Executive Officer
GW:eam
cc: Specht Development, Inc. — Bob Burns
City of Tigard Building Department
Baugh Construction Co.
LRS Architects
VLMK