Report (687) I
Carlson Testing, Inc. Construction Inspection &Related Tests
Geotechnical Consultin3
REPORT OF6X 12 CONCRETE TEST SPECIMENS P.O. Box 23814
Tigard, Oregon 97281
Test Methods: ASTM C172/C1231/C39/C31/C143 Phone (503) 684 -3460
FAX # 684 -0954
Date Molded: 10/04 , 1g 99 .lob No. 99 - 2536A Permit No: BUP 1999 -- 01)234
Client: SI'ECH•T DEVELOPMENT INC -- BOB BURNS
Project: TIGARD CORPORATE CENTER •- BLDG B
Address: 12259 SW 69TH TIGARD OR
Contractor: BAUGH CONSTRUCTION CO Sub Contractor:
Concrete Supplier: ROSS ISLAND SAND & GRAVEL Truck No. 210 Ticket No. T
Cast By: S • FOX Cu. Yds. 11 OF 22 Load Not
CLEAR 78 60
Weather: Temp. High: Temp. Low:
BUILDING 8 TILT PANELS * 1 -10, 19 AND 20 AND 3 SOUTH TRASH
Location of Placement:
ENCLOSURE WALL PANELS, TEST AT BUILDING B TILT PANEL. * 5
Test lime: Concrete Temp:
4000 28 4 1/2" I & II
Strength Requirement: PSI @ days Slump Cement Type
4010A
Mix NoJNo. Sacks Air Content Max. Aggregate
Admix. Amount: Brand: _ Admix. Amount: Brand:
Set Test@ Register Date Date Total Area Unit Report Tested
rea
No. Days Number Rec'd Test Load PSI No. By
I. 7 0179 10/05 10/11 91,740 28.26 3250 WR
28 0179 10/05 11/01
28 0179 10/05 11/01
HOLD 0179 10/05
Remarks:
cc: CITY OF TIGARD BUILDING DEPT
BAUGH CONSTRUCTION CO
LRS ARCHITECTS
VLMK / //
Reviewed by: L aboratory Supervisor
,ice .. .. .- , . .-'--- --•--' • .- in ...4....,a r in r, a wshn.d th
nrinr w..nri7Atinn from this office.
C arlson Testing, Inc. Construction Inspection & Related Tests
Geotechnical Consultin•
REPORT OF6X 12 CONCRETE TEST SPECIMENS
P.O. Box 23814
Test Methods: nSTM C172/C1231/C39/C31/C143 Tigard, Oregon 97281 Phone (503) 684 -3460
FAX # 684 -0954
Date Molded: 10/04 , 19 99 .lob No. 99 - 2536A Permit No: BUP1999 - 00234
Client: SI'ECHT DEVELOPMENT INC - BOB BURNS
Project: TIGARD CORPORATE CENTER - BLDG B
Address: 12259 SW 69TH TIGARD OR
Contractor: BAUGH CONS'T'RUCTION CO Sub Contractor:
Concrete Supplier: ROSS ISLAND SAND & GRAVEL Truck No. 2. Ticket No. T- - .16743 7
Cast By:
S.
FOX Cu. Yds. 11 OF !7 Load No.
CLEAR 78 60
Weather: Temp. High: Temp. Low:
BUILDING B TILT PANELS * 1 -10, 19 AND 20 AND 3 SOUTH TRASH
Location of Placement:
ENCLOSURE WALL PANELS, TEST AT BUILDING B TILT PANEL. # 10
Test Time: Concrete Temp:
4000 28 4" I & 1
Strength Requirement: PSI @ days Slump Cement Type
4010A
Mix NoJNo. Sacks Air Content Max. Aggregate
Admix. Amount: Brand: — Admix. Amount: Brand:
Set Test@ Register Date Date Total Area Unit Report Tested
rea
No. Days Number Rec'd Test Load PSI No. By
II 7 0180 10/05 10/11 102,040 28.26 3610 WR
28 0180 10/05 11 /01
28 0180 10/05 11/01
HOLD 0180 10/05
Remarks:
cc: CITY OF TIGARD BUILDING DEPT
BAUGH CONSTRUCTION CO
LRS ARCHITECTS
VLMK 41 44---- ' -
l
Laboratory Supervise, .
R eviewed by: • .. . .- . . . .. .__- -- -- _._ -.. 4... ..1.....• •inf..a +hn. do .tn. enfhn.ivofinnfmmthisnffica.
Carlson Testing Construction Inspection & Related Tests
ng Inc. Geotechnical Consulting
REPORT OF 12 CONCRETE TEST SPECIMENS P.O. Box 23814
Test Methods: AS TM C172/C1231/C39/C31/C143 Tigard, Oregon 97281 Phone (503) 684 -3460
FAX # 684 -0954
Date Molded:
10/04 , 19 99 Job No. 99 -2536A Permit No: BUP 1999 - -002 i4
Client:
SPFCH 1 DEVELOPMENT I NC - BOB BURNS
Project: r i GARI) CORPORATE CENTER - BLDG 8
Address: 1 22 59 SW 69TH TIGARD OR
Contractor: BAt1GH CONSTRUCTION CO Sub Contractor:
Concrete supplier: ROSS ISLAND SAND & GRAVEL. Truck No. 210 T-167418
Ticket No.
Cast By: `a ' FOX C u. Y ds. 1 1. OF 22 2 Load No.
CLEAR 18 60
Weather: Temp. High: Temp. Low:
BUILDING B TILT PANELS # 1 -10, 19 AND 20 AND 3 SOUTH TRASH
Location of Placement:
ENCLOSURE'WALL PANELS, TEST AT BUILDING 8 TILT PANEL. # 5
Test Time: Concrete Temp:
4000 28 4 1/2" I & II
Strength Requirement: PSI @ days Slump Cement Type
4010A
Mix NoJNo. Sacks Air Content Max. Aggregate
Admix. Amount: Brand: — Admix. Amount: Brand:
Set Test@ Register Date Date Total Area Unit Report Tested
rea
No. Days Number Rec'd Test Load PSI No. By
1 7 0179 10/05 10/11 91,740 28.26 3250 WR
28 0179 10/05 11 /01 120,680 28.27 4270 WR
28 0179 10/05 11 /01 116,350 28.27 4120 WR
28 0179 10/05 11 /01 120,580 28.27 4270 WR
Remarks:
cc: CITY OF TIGARD BUILDING DEPT
LiAUGH CONSTRUCTION CO
LRS ARCHITECTS
VI..MK
LABORATORY MANAGER
. Reviewed by:
_ . . _._ _ _._.. __... . . : -_ - .......:.... I. .....I t......• •.. w.. «.n. noel • in f. di with no st nrinr AIithnri7atInn from thls office.
Related Tests
Inspection & Carlson Testing, Inc. Geotechnical Consultin3
REPORT OF6X 1 2 CONCRETE TEST SPECIMENS P.O. Box 23814
Test Methods: A•`' M C172/C1231/C39/C31/C143 Tigard, Oregon 97281 Phone (503) 684 -3460
FAX # 684 -0954
Date Molded:
10/04 19 99 Job No. 99 -2536 Permit No: UUP 1999 -00234
:,►lent: Sl'c cH r DEVELOPMENT INC - BOB BURNS
Project: TIGARD CORPORATE CENTER - BLDG B
Address: 12259 SW 69TH TIGARD OR
Contractor: Sub CONSTRUCTION CO pub Contractor:
Concrete Supplier: ROSS ISLAND SAND & GRAVEL Truck No. 209 Ticket No. i 16
Cast By: S .. FOX C u. Yds. 11 OF 77 1'
Load No.
CLEAR 78 60
Weather: Temp. High: Temp. Low:
BUILDING B TILT PANELS if 1 -10, 19 AND 20 AND 3 SOUTH TRASH
Location of Placement:
ENCLOSURE `WALL PANELS , TEST AT BUILDING B TILT PANEL. # 10
Test Time: Concrete Temp:
4000 28 4" I & II
Strength Requirement: PSI @ days Slump Cement Type
4010A
Mix NoJNo. Sacks Air Content Max. Aggregate
Admix. Amount: . Brand: — Admix. Amount: Brand:
Set Test@ Register Date Date Total Area Unit Report Tested
rea
No. Days Number Rec'd Test Load PSI No. By
11 7 0180 10/05 10/11 102,040 28.26 3610 WR
28 0180 10/05 11/01 117,380 28.27 4150 WR
28 0180 10/05 11 /01 119,910 28.27 4240 WR
28 0180 10/05 11/01 116,480 28.27 4120 WR
Remarks:
cc: CITY OF TIGARD BUILDING DEPT I BAl1GH• CONSTRUCTION CO
LRS ARCHITECTS
/ . lik .
V1..MK
LABORATORY MANAGER
Reviewed by:
• . .. • . _ — -,_ ,_ ... •.... • • i., e,u �d•w., a Mom. a, dhnrl�a from thls office. •
Main Office Branch Office
P.O. Box 23814 4060 Hudson Ave., NE
Tigard, Oregon 97281 Salem, OR 97301
Carlson Testing Inc. Phone (503) 684 -3460 Phone (503) 589 -1252
FAX (503) 684 -0954 FAX (503) 589 -1309
October 5, 1999
99- 2536A. CTI
Permit No. BUP1999 -00234
FIELD INSPECTION REPORT
DATES COVERED: October 4, 1999
PROJECT: Tigard Corporate Center — Building B
ADDRESS: 12259 SW 69th — Tigard, OR
INSPECTOR: S. Fox, COP #597
10- 04 -99: CTI representative was onsite to perform special inspection of concrete placed in building B tilt up
panels #1 -10, 19, 20, and 3 south trash enclosure wall panels.
Two sets of (4) compressive test cylinders was cast from a total of (157) cubic yards of Ross Islands 4000 psi
concrete mix #4010A placed and vibrated. All reinforcement and embed plates were inspected previously.
Please refer to CTI field report dated 10- 01 -99.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced,
except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitt-d,
- 1 . eN T STI1 -, INC.
i . u' Ias W. Leach
re .ident
SF /Ijm
cc: Specht Development Inc — Bob. Burns
City of Tigard Building Dept
Baugh Construction Co
LRS Architects
VLMK
99- 2536A.fr
Main Office Branch Office
P.O. Box 23814 4060 Hudson Ave., NE
Tigard, Oregon 97281 Salem, OR 97301
Carlson Testing, Inc. Phone (503) 684-3460
FAX (503) 6840954 P h o n e
October 5, 1999
99- 2536A. CTI
Permit No. BUP1999 -00234
FIELD INSPECTION REPORT
DATES COVERED: October 1, 1999
PROJECT: Tigard Corporate Center — Building B
ADDRESS: 12259 SW 69th — Tigard, OR
INSPECTOR: J. Hall, COP#735
10- 01 -99: CTI representative was onsite for a periodic inspection of rebar. Conducted rebar and embed plate
inspection on building "B" precast walls, panels #1 -10 and 19 & 20, and three south trash enclosure panels. All
of the rebar and weld plates conform to the approved drawings as provided by the general contractor. Baugh
Construction was advised of the inspection results.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced,
except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Res • ectf Ily submi , -�/
C %' N MST/ i•, INC.
''� = las W. Leach
Pr: ident
JH:jp
cc: Specht Development Inc — Bob Burns
City of Tigard Building Dept
Baugh Construction Co
LRS Architects
VLMK
99- 2536A.fr -
Carlson Testing, onstruction Inspection & Related Tests
ng Inc. Geotechnical Consulting►
REPORT OF6X ]./ CONCRETE TEST SPECIMENS P.O. Box 23814
rest Methods: ASTM C172/C1231/C39/C31/C143 Tigard, Oregon 97281 Phone (503) 684 -3460
FAX # 684 -0954
Date Molded: 1 0/07 , 19 99 Job No. 99 - 2536A Permit No: BUP 1999 - 00234
:s.Iient: SPE.CHT DEVELOPMENT INC - BOB BURNS
Project: TIGARD CORPORATE CENTER - BLDG B
Address: 12259 SW 69TH TIGARD OR
BAUGH CONSTRUCTION CO
Contractor: Sub Contractor:
Concrete Supplier: ROSS ISLAND SAND & GRAVEL Truck No. 209 Ticket No. - 1.67910
Cast By: S
S. FOX Cu. Yds. O 5 Load No.
CLOUDY 64 43
Weather: Temp. High: Temp. Low:
BUILDING B TRASH ENCLOSURE FOOTINGS
Location of Placement:
Test Time: Concrete Temp:
3000 28 3 1/2" I & II
Strength Requirement: PSI @ days Slump Cement Type
3010B
Mix NoJNo. Sacks Air Content Max. Aggregate
Admix. Amount: Brand: — Admix. Amount: Brand:
Set Test@ Register Date Date Total Area Unit Report Tested
rea
No. Days Number Rec'd Test Load PSI No. By
I 7 0360 10/08 10/14 100,500 28.26 3560 WR
28 0360 10/08 11/04
,
28 0360 10 /08 11/04
HOLD 0360 10/08
Remarks:
cc: CITY OF TIGARD BUILDING DEPT
BAUGH CONSTRUCTION CO
LRS ARCHITECTS.
VLMK % L
•
Reviewed by: < aboratory Supervisor .
• . . . _ . . . .....-'- `- --•'- `- ---- _.+..__.. _.......• :., 4..,, ...u•....w ...i... w. dl.n.i.e�in� Imr� fhte nrRro
Carlson Testing, Inc. Construction Inspection & Related Tests
Geotechnical Consulting
REPORT OFC X 1 CONCRETE TEST SPECIMENS
P.O. Box 23814
A S - I'M C172/C1231/C39/C31./C143 hone 03) Oregon 8 - 346
Test Methods: Phone (503) 684 -3460 0
FAX # 684 -0954
Date Molded: 10/07 , 19 99 Job No. 99- -2536A Permit No: BUP 1999• - 00234
client: SPECIIT DEVELOPMENT INC - BOB BURNS
Project: TIGARD CORPORATE CENTER - BLDG B
Address: 12259 SW 69TH TIGARD OR
Contractor: BAUGH CONSTRUCTION CO Sub Contractor:
Concrete Supplier: ROSS ISLAND SAND & GRAVEL Truck No. 209 Ticket No. T-167910
Cast By: - - S.FOX Cu. Yds. 5 OF `' Load No l - __ - -
CLOUDY
Weather: Temp. High: 64 4 ; 3
Temp. Low:
Location of Placement:
BUILDING B TRASH ENCLOSURE FOOTINGS
Test Time: Concrete Temp:
3000 PSI @ 28 days Slump Cement 3 1/2" I & II
Strength Requirement: Y p Type
30108 Air Content Max. Aggregate
Mix NoJNo. Sacks gg ate g
Admix. Amount: Brand: — Admix. Amount: Brand:
Set Test@ Register Date Date Total Area Unit Report Tested
No. Days Number Rec'd Test Load PSI No. By
1. 7 0360 10/08 10/14 100,500 28.26 3560 WR
28 0360 10/08 11/04 125,720 28.29 4440 WR
2.8 0360 10/08 11/04 123,330 28.29 4360 WR
28 0360 10/08 11/04 132,850 2.8.29 4700 WR
•
•
Remarks: •
cc: CITY OF TIGARD BUILDING DEPT CONSTRUCTION CO
LRS ARCHITECTS
VLMK
LABORATORY MANAGER
• Reviewed by:
Main Office Branch Office
P.O. Box 23814 4060 Hudson Ave., NE
Tigard, Oregon 97281 Salem, OR 97301
Carlson Testing Inc. Phone (503) 684 -3460 Phone (503) 589 -1252
FAX (503) 684 -0954 FAX (503) 589 -1309
October 8, 1999
99- 2536A.CTI
Permit No. BUP1999 -00234
FIELD INSPECTION REPORT
DATES COVERED: October 7, 1999
PROJECT: Tigard Corporate Center — Building B
ADDRESS: 12259 SW 69th — Tigard, OR
INSPECTOR: S. Fox, COP #597
10- 07 -99: CTI representative was onsite to perform special inspections of reinforcement and concrete placed
in the trash enclosure footings located between buildings B & C.
One set of (4) compressive test cylinders was cast from a total of (5) cubic yards of Ross Island's concrete mix
design #3010B placed and vibrated. All reinforcement was found to be in accordance with project drawings.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced,
except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
OARLSON TESTIN ,INC.
i
p �i • -
Douglas W. Lea
President
SF /Ijm
cc: Specht Development Inc — Bob Burns
City of Tigard Building Dept
Baugh Construction Co
LRS Architects
VLMK
99- 2536A.fr
Main Office Branch Office
P.O. Box 23814 4060 Hudson Ave., NE
Tigard, Oregon 97281 Salem, OR 97301
Carlson Testing Inc. Phone (503) 684 -3460 Phone (503) 589 -1252
FAX (503) 6840954 FAX (503) 589 -1309
October 13, 1999
99- 2536A. CTI
Permit No. BUP1999 -00234
FIELD INSPECTION REPORT
DATES COVERED: October 12, 1999
PROJECT: Tigard Corporate Center — Building B
ADDRESS: 12259 SW 69th — Tigard, OR
INSPECTOR: B. Baty COP# 728
10- 12 -99: CTI representative was onsite for periodic inspection of structural steel and welding. Inspected the
following field welds.
1. Panel base connection per details 11 and 12/S6.1.
2. Panel corner connection per detail 2/S6.1.
3. Panel joints per detail 4/S6.1.
4. Panel corner per detail 3B/S6.1.
Weld procedures and welder qualifications were reviewed and dry ovens were found onsite.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced,
except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
i r i \ CARLSON TEST G, IN
PRESIDENT
Douglas W. Leach
President
BB /Ijm
cc: Specht Development Inc — Bob Burns
City of Tigard Building Dept
Baugh Construction Co
LRS Architects
VLMK
•
99- 2536A.fr
Main Office Branch Office
P.O. Box 23814 4060 Hudson Ave., NE
Tigard, Oregon 97281 Salem, OR 97301
Carlson Testing Inc. Phone (503) 684 -3460 Phone (503) 589 -1252
FAX (503) 684 -0954 FAX (503) 589 -1309
October 14, 1999
99- 2536A.CTI
Permit No. BUP1999 -00234
SHOP INSPECTION REPORT @ Howser Steel
DATES COVERED: October 7 and 12, 1999
PROJECT: Tigard Corporate Center — Budding B
ADDRESS: 12259 SW 69th — Tigard, OR
INSPECTOR: J. Svacek, COP #649, WABOSVA520867
10- 07 -99: CTI representative was at the shop of Howser Steel for periodic inspection. Visual inspection of
shop welds to wide flange columns listed shows welds complete and acceptable: mark 7B.
Weld procedures and welder qualifications were reviewed.
10- 12 -99: CTI representative was at the shop of Howser Steel for periodic inspection. Pieces listed are
complete and acceptable: columns 4A, 4B, 5A, 5C, (2), 6A, 6B, 7A (2), 7B, 7C, 8C, 8D, beams: 13E (2), 13L,
13G, 13H, 13J, 13K, 14B (4), 14C, 14D (5), embeds: 14V (38), 14X (30) and 14Y (12). Work is by certified
welder per WPS.
Weld procedures and welder qualifications were reviewed.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced,
except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTI G, INC
rowan
Douglas Vv. Leach
President
JS /Ijm
cc: Specht Development Inc — Bob Burns
City of Tigard Building Dept
Baugh Construction Co
LRS Architects
VLMK
99- 2536A.fr
Carlson Testing, Inc. Construction Inspection &Related Tests
Geotechnical Consulting
REPORT OFhX 12 CONCRETE TEST SPECIMENS P.O. Box 23814
Test Methods: AS1M C172/C1231/C39/C31/C1064/C143 Tigard, Oregon 97281 Phone(503)684 -3460
FAX # 684 -0954
Date Molded: 10/26 , 19 99 Job No. 99 -2536A Permit No: BUP 1999• -00234
Client: SPECIFY DEVELOPMENT INC - E3013 BURNS
Project: 11GARD CORPORATE CENTER - BLDG B
Address: 12259 SW 69TH TIGARD OR
Contractor: I3AIIGI•I CONSTRUCTION CO Sub Contractor:
Concrete supplier: ROSS ISLAND SAND & GRAVEL Truck No. 210 Ticket No. V-169854
Cast By: T . KASTEL Cu. Yds. 11 OF :38 Load No 1
Weather: Temp. High: Temp. Low:
• POUR BACK STRIP 1 /B.2 - -C, C /1• -5, C/6-8, 1 /A -A.8, A/1-4, A/7• -10
Location of Placement:
10 /A -0
Test Time: Concrete Temp: 64
Strength Requirement: 500 PSI @ 28 daysSlump Cement Typ
351.0A
Air Content Max. Aggregate
Mix NoJNo. Sacks 99 ate 9
Admix. Amount: Brand: Admix. Amount: Brand:
Set Test@ Register Date Date Total Area Unit Report Tested
rea
No. Days Number Rec'd Test Load PSI No. By
1 7 1122 10/27 11/02 96,620 28.27 3420 WR
28 1122 10/27 11/23
28 1122 10/27 11/23
HOLD 1122 10/27
•
Remarks:
cc: CITY OF TIGARD BUILDING DEPT 1,7<.---7
I3AUGH CONSTRUCTION CO
LEIS ARCHITECTS
VLMK
LABORATORY MANAGER
Reviewed by: • . . _ • - - "---- - --..- 1. . .•.....A • 1 ,. a di ..;the., Ft .s e. ,,,,thnwi,atinn fmm this office.
RECEIVED
• Construction Inspection & Related Tests
Starlson Testing, Inc. -DEC 01 1999 Geotechnical Consultin3
COMMUNITY DEVELOPMENT
IEPORT OF
6X12 CONCRETE TEST SPECIMENS P.O. Box 23814
Tigard, Oregon 97281
-estMethods: ASTM C172/C1231/C39/C31/C1064/C143 Phone(503)684 -3460
FAX # 684 -0954
)ate Molded: 10/26 , 19 99 Job No. 99 - 2536A Permit No: BUP1 Q99 - 00234
:Iient: SPECHT DEVELOI'MENT INC - BOB BIIRNS
'roject: TIGARD CORPORATE CENTER - BI DG B
address: 12259 SW 69TH TIGARD OR
;ontractor: BAUGH CONSTRUCTION CO Sub Contractor:
;oncrete Suppl ROSS ISLAND SAND & GRAVEL Truck No. 210 Ticket No. V- 169854
:astBy: T. KASTEL Cu. Yds. 11 OF 18 Load No. .
Neather: Temp. High: Temp. Low:
_ovation of Placement:
POUR BACK STRIP 1 /B.2 -C, C/1 -5, C/6 -8. 1 /A -A.8, A /1 -4, A/7 - I0
10 /A -B
Test Time: Concrete Temp: 64
Strength Requirement:
3 500 PSI @ 28 days Slump 7 Cement Typel
3510A
fix NoJNo. Sacks Air Content Max. Aggregate
Admix. Amount: Brand: _ Admix. Amount: Brand:
Set Test@ Register Date Date Total Area Unit Report Tested
No. Days Number Rec'd Test Load PSI No. By
I 7 1122 10/27 11/02 96,620 28.27 3420 WR
28 1122 10/27 11/23 135,180 28.16 4800 We
28 1122 10/27 11/23 134.870 28.16 . 4790 WR
28 1122 10/27 11/23 130,880 2R_16 465n WR---
Remarks:
cc: CITY OF TIGARD BUILDING DEPT
BAUGH CONSTRUCTION CO / LRS ARCHITECTS
VLMK LABORATORY MANAGPR
Reviewed by:
Main Office Branch Office
P.O. Box 23814 4060 Hudson Ave., NE
Tigard, Oregon 97281 Salem, OR 97301
Carlson Testing, Inc. Phone (503) 684 -3460 Phone (503) 589 -1252
FAX (503) 684-0954 FAX (503) 589 -1309
October 27, 1999
99- 2536A. CTI
Permit No. BUP1999 -00234
FIELD INSPECTION REPORT
DATES COVERED: October 26, 1999
PROJECT: Tigard Corporate Center — Building B
ADDRESS: 12259 SW 69th — Tigard, OR
INSPECTOR: T. Kastel 1 D. Leach, COP #360 / WABO (LEA 42 3399)
10- 26 -99: CTI representatives were onsite for continuous inspections of concrete and rebar. Prior to concrete
pour, rebar -was checked in pourback strip and trash enclosure slab. Rebar complies to all approved plans and
specifications on S2.1, details 4 & 14. One set of four cylinders was made to ASTM standards. Ross Island
was the supplier of concrete mix #3510A used.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced,
except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
)ARLS TESTI N INC.
tai
PRESIDENT
Douglas W. Leach
President
TK/DL:jp
cc: Specht Development Inc — Bob Burns
City of Tigard Building Dept
Baugh Construction Co
LRS Architects
VLMK
99- 2536A.fr
Main Office Branch Office
P.O. Box 23814 4060 Hudson Ave., NE
Tigard, Oregon 97281 Salem, OR 97301
Carlson Testing, Inc. Phone (503) 684 -3460 Phone (503) 589 -1252
FAX (503) 684 -0954 FAX (503) 589 -1309
October 29, 1999
99- 2536A.CTI
Permit No. BUP1999 -00234
SHOP INSPECTION REPORT @ Howser Steel
DATES COVERED: October 20, 21 & 26, 1999
PROJECT: Tigard Corporate Center — Building B
ADDRESS: 12259 SW 69th — Tigard, OR
INSPECTOR: J. Svacek, COP#649 / WABO (SVA 52 0867)
10- 20 -99: CTI representative was at the shop of Howser Steel for a periodic inspection. Visual inspection of
pieces listed shows shop welds are complete and acceptable: marks 12B and 12C. Welder qualifications and
welding procedure specifications have been reviewed.
10- 21 -99: CTI representative was at the shop of Howser Steel for a periodic inspection. The following pieces
were inspected and found complete and acceptable: marks 11A (2), 11B (4), 11C (2), 11D (4), 11G, 12B, 12C,
12D, 12F (2), 12H, 12J (4), 12K (2), 13A and 13B. Work was performed by certified welder per WPS.
10- 26 -99: CTI representative was at the shop of Howser Steel for a periodic inspection. Visual inspection of
columns listed shows shop welds are complete and acceptable by AWS and detail: 8A (2) and 8B (2). Work
was performed by certified welder per WPS.
Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced,
except in full, without prior authorization from this office.
If there are any further questions regarding this matter, please do not hesitate to contact this office.
Respectfully submitted,
CARLSON TESTING N .
Douglas W. Leach
President
JS:jp
cc: Specht Development Inc — Bob Burns
City of Tigard Building Dept
Baugh Construction Co
LRS Architects
VLMK
99- 2536A.fr