Loading...
Report (426) w_kk VLMK Consulting Engineers 3933 SW KELLY AVENUE, PORTLAND, OREGON 97201 -4393 (503) 222 -4453 / FAX (503) 248 -9263 / vlmk (°? vlmk.com PRINCIPALS 3v ° / / ALFRED H. VAN DOMELEN, P.E. 0 °q) �J ,?Y JAMES E. KNAUF, P.E. C /' J )r '� )! / GREGORY J. BLEFGEN, P.E. JOHN T BROOKS HAVL/N G. KEMP P.E. KIMBERLY A. SCHOENFELDER FIELD REPORT Date: August 16, 1999 Job No 9R 45 Project: Tigard Corporate Center Permit : 99 -00 Address: 12259 SW 69 Avenue ontractor: Baugh Construction Location: Tigard, Oregon, 97223 Owner: Specht Development Weather: Sunny Temp/Time: Appx.60° at 7:15 a.m. Present at Site: John Lawrence, Baugh Construction Jim Knauf, VLMK Engineers The following was noted: The purpose of the site visit was to review footing reinforcement and embeds for building "B ". Reinforcing was complete and about 80% of the embeds were in place. There were some areas, particularly below the embeds, where reinforcing did not have the proper clearance. John said he was aware of this and would chair them up to the proper location before pouring concrete. Other reinforcing and embeds were in general compliance to contract documents. Cc: Specht Properties, Bob Burns Baugh Construction, Job Site Baugh Construction, Gordon Childress City of Tigard, Bob Poskin JEK:tdc 4 4 ,4 l ye al A K:\Field Reports \Tigard Corp Ctr 8- 16.Doc MEMBER