Loading...
Report (514) Main Office Branch Office P.O. Box 23814 4060 Hudson Ave., NE Tigard, Oregon 97281 Salem, OR 97301 Inc. Carlson Testing, l Phone FAX (503) 68954 FAX (503) 589-1309 2 evp 99- oe-I August 3, 1999 99 -2074 Permit No. 99 -00195 SHOP INSPECTION REPORT @ Riverside Manufacturing DATES COVERED: July 14, 1999 PROJECT: Bennett/Porter Office Building — Suite 100 0 ADDRESS: 12559 SW 69th — Tigard, OR INSPECTOR: P. Weber, COP #738 _ _ _ 07- 14 -99: CTI representative was present at the shop of Riverside Manufacturing for a structural steel and welding inspection. This inspector inspected pipe columns #1, 4, 5, 6, 7 & 8. ' /4" fillet welds on base plates and caps conform to AWS specifications and project drawings. Welder qualifications and welding procedure specifications have been reviewed and material certifications have been verified. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. spectfully submitte• RLSO TESTING, C. f PRESIDENT Douglas W. Leach President PW:jp cc: R & D Property Development LLC — Brian Keicher City of Tigard Building Dept Jerry C Robinson c/o Robert Wolf Joseph Hughes Construction Inc John Parkin Engineering 99- 2074.frl Main Office Branch Office P.O. Box 23814 4060 Hudson Ave., NE Tigard, Oregon 97281 Salem, OR 97301 C arlson Testing, Inc. FAX (503) 68954 Phone FAX (503) 589 1309 August 2, 1999 99 -2074 Permit No. 99 -00195 FIELD INSPECTION REPORT DATES COVERED: July 29, 1999 PROJECT: Bennett/Porter Office Building — Suite 1 0 0 00 ADDRESS: 12559 SW 69th — Tigard, OR INSPECTOR: B. Suminski, COP #399 / WABO (SUM 52 2258) 07- 29 -99: CTI representative was present onsite for a masonry inspection. One brick prism was cast. Grout was hand -mixed with two sacks of cement and (11) 5- gallon buckets of sand /aggregate mix. Grout was placed at the north wall from 3' to 6'. Note: This inspector was unable to locate an f'm number for the wall. Our reports pertain to the material tested /inspected only. Information contained herein is not to be reproduced, except in full, without prior authorization from this office. If there are any further questions regarding this matter, please do not hesitate to contact this office. Respectfully submitted .' C" ' • TES ING, I . IN o % - W. Leach Pr- • -nt BS:jp cc: R & D Property Development LLC — Brian Keicher City of Tigard Building Dept Jerry C Robinson c/o Robert Wolf Joseph Hughes Construction Inc John Parkin Engineering 99- 2074.fr