Loading...
Report x/20/1994 01: 14 503-696 -14 / / omuun .NC. VL - tev, C/9 - ate • INTERFACE ENGINEERING 6542 SE take Road Mflwwbe,OR97222 Consulting Fngleisrs 503.659.6394 OF1C 503.659.9029 FAX Submittal Review PROJECT: Tigard Triangle Office Building Complex PROJECT NO.: 99.278 REVIEWED David Gessert - DATE: October 11, 1999 ARCHITECT: LAS sSTeh: Fire Protection Sprinklers This review is only for general cordormance with the design concept of the project and general compliance with the information in the Contract Documents. My action shown below is subject to the requirements of the Plans and Specifications. Contractor is responsible for the dimensions and quantity which shall be oonirmed and correlated at the job site, fabrication processes and techniques of construction, coordination of the work with that of all other trades. and the satisfactory performance cf the work. The following items have been ,reviewed for conformance with the requirements of the Contract Documents: • rrtaM DISPOSITION ITEM - COMMENTS REVIEW DATE N M 1 2 3 F • I . Sprinkler Head - Reliable Model F I FR Extended Covera¢e 10/1 I X 2. Sprinkler Head - Reliable Model F I FR 10/11 X 3. Pipe - No information submitted. Submit pipe manufacturer 10/1 1 X X and model for review. 4. Fittings and Couplings - No information submitted. Submit 10/11 fittings and couplings manufacturer and models for review. X X 5. Control Valves - No information submitted. Submit control 10/11 X X valve man - • rev and • • for review. 6. Row Switch - No information submitted. Submit flow switch 10/1 1 X X • manufactyrer and model for review. 7. Bell - No information submitted. Submit bell manufacturer 10/11 X X and model for review. ,•• • 8. Hanger Hardware - No information submitted. Submit 10/11 X X han • r hardware rnanufactu and models for review. Disposition Code: N - No exception taken M - Make comic: Ewe noted. Resubrnittei not required if installation complies with notes. R - Revise and resubmit I - Mande to er not approved. 2 - Does not meet requirements a/ Contract Documents. 3 Yeti.. c ent information to review. F - Forward spec led item. s1992 M AR10I i.wvo Page I of 3 a- 133/20/1994 01:14 503 - 696 - 1477 BAUt� - I CONSTRUCTIGN RUE 03 Ii ISP0511'ION ITEM - COMMENTS REVIEW N M R DATE I 2 3 F 9. Drawing Sheet FP I of 14 - Location of water flow test shall be 10/11 ,shown on the drawing and stated on Ieaend. X X / 10. Drawing Sheet FP t of 14 - Date of water flow test and who 10/11 provided the information shall be indicated on the drawirg and/or the X X .L . raulic — L s. t I . Drawing Sheet FP 2 - 14 of ? - Total number sheets in set shall be 10/11 7 indicated on each drawing. Floor number shall be indicated on each X / drawing. ✓; /12. Drawing Sheet FP 2 - Sway bracing shall be shown on drawing. 10/11 X X ✓!' ' 11 Drawing Sheet FP 2 - Reference on drawing for elimination of 10/11 sprinklers form the exterior canopy is form the 1996 edition of NFPA X Knot the 1 994 edition as indicated. Please make correction of �n (tate. r I)swing Sheet FP3 - Sway bracing shall be shown on drawing. 10/1 1 X X S. Drawing Sheet FP3 - Hydraulic nodes and most remote area shall 10/1 1 shown. X X 7i 6. Drawing Sheet FP3 - Sprinkler symbols shall be shown on legend 10/1 1 .drawing. X 7. Drawing Sheet FP4 - Sprinlder symbols shall be shown on legend 10/11 A X drawing. 18. Drawing Sheet FPS - Sprinkler symbols shall be shown on legend 10/11 ■ •d- X .: I' :.Drawl : Sheet FP6 - S brad : shall be shown on drawl :. 10 I 1 X X ::20:-Trawing Sheet FP6 - Reference on drawing for elimination of 10/11 sprinklers form the exterior canopy is form the 1996 edition of NFPA x X I not the 1994 edition as indicated. Please make correction of ition • . Drawing Sheet FP7 - Sway bracing shall be shown on drawing. 10 /1 1 X , X Drawing Sheet FP7 - Hydraulic nodes and most remote area shall 10/1 1 X X Afe shown. _ . / 23. Drawing Sheet FP7 - Sprinkler symbots shall be shown on legend 10/1 1 X • /swirl. 24. Drawing Sheet FP8 - Sprinkler symbols shall be shown on legend 10 /1 1 x of • 4 I • Disposition Code: N - No excepdon.nlaen M - Make co rections noted. R,ewbmittal not required if irudlation complies with notes. R - Revise and resubmit. 1 - Manufacturer not approved. 2 - Does not meet requirements of Contract Documents. 3 - rnsu actesrr information to review. F - Fawn! swilled item. SAP927/COMPAPP.101 I.wpo Page 2 of 3 X3/11:31 Yd4 bl: :.4 JQJ'1370 DNtAT 1/4.u1v Ir.1...PvI a6.1• rp..... ur • ITei _ DISPOSmON ITEM - COMMENTS REVIEW R DATE N M , 1 2 3 F V 25. Drawing Sheet FP9 - Sprinkler symbols shall be shown on legend 10/11 1 X drawin1. 26. Drawing Sheet FPI O - Sway bracing shall be shown on drawing. 10/11 X X 7 -Drawing Sheet FPI 0 - Reference on drawing for elimination of ' 10/11 sprinklers form the exterior canopy is form the 1996 edition of NFPA • 13 not the 1994 edition as indicated. Please make correction of X Aldan date. _ . 2:. 0 • ' - Sheet FP 1 1 - . b shall be shown on drawin_ . 10/11 X X 29. Drawing Sheet FPI 1 - H e 10/11 Hydraulic nodes and remote shall b X X 30. Drawing Sheet FPI I - Sprinkler symbols shall be shown on legend 10/11 X i f(lrawing. 1. Drawing Sheet FP 12 - Sprinkler symbols shall be shown on legend 10/11 ��� X 2. Drawing Sheet FP 13 - S nkler ng pri symbols shall be shown on legend 10/11 X of 3. Drawing Sheet FP 14 - Provision shall be made for installing 10/1 ; sprinkler drops for fixture suspended ceiling. X 34. Hydraulic Cakulaoons - The most remote area. hydraulic nodes, 10/1 I X and water flaw test location shall be shown on the drawings. Date of flow test shall be shown on the drawing and/or calm. Moreover, it does not appear that hydraulic calculations were completed for each X X individual building. Building C is not the exist mirror image of Buildings A and B. Disposition Code N - No exception taken M - Make corrections noted. fiesubrnmai net required if installation complies with notes. R - Revise and resubmit I - Manufaceser not approved. 2 - Does not meet requirement; of Contract Documents. 3 - InsJA Beret information to ^:view. F - Forward specified item. 5:992rncoMwsnI01 1.wrp Page 3 of 3