Loading...
Inspections CITY OF TIGARD BUILDING INSPECTION DIVISION MST 24 -I4our Inspection Line: 639 -4175 Business Line: 639 -4171 BUP Date Requested `a AM PM BLD Location < /4 SO 6 Suite MEC Contact Person Ph PLM Contractor Ph SWR BUILDING Tenant/Owner ELC Retaining Wall ELR Footing Access: Foundation FPS Ftg Drain SGN Crawl Drain Inspection Notes: Slab SIT ,,- 00Gdc --. Post & Beam Ext Sheath /Shear Int Sheath /Shear --- �_ Framing Insulation Drywall Nailing Firewall . '') Fire Sprinkler Fire Alarm r_jti- F ( a Susp'd Ceiling Roof Misc: Final PASS PART FAIL PLUMBING _ Post & Beam Under Slab Top Out Water Service Sanitary Sewer Rain Drains Final PASS PART FAIL MECHANICAL Post & Beam Rough In Gas Line Smoke Dampers Final PASS PART FAIL ELECTRICAL ' Service Rough In UG /Slab Low Voltage Fire Alarm Final P PART FAIL IT ackfill/Grading Sanitary Sewer Storm Drain [ ] Reinspection fee of $ required before next inspection. Pay at City Hall, 13125 SW Hall Blvd Catch Basin [ ] Please call for reinspection RE: [ ] Unable to inspect - no access., Fire Supply Line ADA j Inspector 6 �'"� Ext Approach /Sidewalk Date _3/5/0! 4,510 PART . FAIL DO NOT REMOVE this inspection record from the job site.